You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Tuesday, March 29th 2011, 11:29pm

Kingdom of Greece Q3/1940

[SIZE=5]Q3 1940[/size]

[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 12,141t from Stockpile
- 4,097t from Transactions
- 26,238t Total materials
- 17,660t used
- 8,578t stored for Q4/1940

[size=3]Infrastructure Development[/size]
Souda Bay:
- 0.5 IP (dedicated) added to Type 2 drydock at Souda Bay. 1.5 IP remaining.

[SIZE=3]Naval Construction[/SIZE]

Attica:
D3: - C-37 Hydra laid down April 6th, 1940. 15,000 tons required; 2500 / 15000 added Q3/40 for total 5000 / 15000. 10,000 tons remaining.
D3: - M-10 Corfu laid down July 5th, 1940. 2,743 tons required; 700 / 2743 added Q3/40 for total of 700 / 2743. 2,043 tons remaining.
D2: - C-38 Ares laid down April 1st, 1940. 8,650 tons required; 2200 / 8650 added Q3/40 for total 4400 / 8650. 4,250 tons remaining.
S2: - M-8 Naxos laid down April 4th, 1940. 2,743 tons required; 700 / 2743 added Q3/40 for total 1400 / 2743. 1,343 tons remaining.
S2: - M-9 Kerpathos laid down April 5th, 1940. 2,743 tons required; 700 / 2743 added Q3/40 for total 1400 / 2743. 1,343 tons remaining.
S1: - D-101 Zakynthos laid down July 2nd, 1940. 2,175 tons required; 584 / 2175 added Q3/40 for total 584 / 2175. 1,591 tons remaining.
S1: - D-102 Kythira laid down July 6th, 1940. 2,175 tons required; 584 / 2175 added Q3/40 for total 584 / 2175. 1,591 tons remaining.
S0: Idle
S0: Idle

Dockside:
- Banat, Romanian Cruiser laid down July 1st, 1939. 5,988 tons required; 1188 / 5988 added Q3/40 for total 5988 / 5988. 0 tons remaining until completion. Completes this quarter.
- Srbija, Yugoslavian Cruiser laid down October 1st, 1939. 4,549 tons required; 454 / 4549 added Q3/40 for total 4549 / 4549. 0 tons remaining until completion. Completes this quarter.
- D-98 Lefkada laid down January 2nd, 1940. 2,175 tons required; 584 / 2175t added Q3/40 for total 1752 / 2175. 423 tons remaining. Launched.
- D-99 Ithaki laid down January 5th, 1940. 2,175 tons required; 584 / 2175t added Q3/40 for total 1752 / 2175. 423 tons remaining. Launched.

Paros:
D1: Idle
D0: Idle

Dockside:


Patra:
D1: Idle
S1: Idle
D0: Idle

Dockside:
- D-100 Kefalonia laid down January 3rd, 1940. 2,175 tons required; 584 / 2175t added Q3/40 for total 1752 / 2175. 423 tons remaining until completion. Launched.

Salamis:
D1: Idle

Dockside:


Souda Bay:
D4: Idle
S2: - M-11 Kanaris laid down July 3rd, 1940. 2,743 tons required; 700 / 2743 added Q3/40 for total of 700 / 2743. 2,043 tons remaining until completion.
D2 - Under construction
D1: Idle
D1: Idle
D1: Idle

Dockside:
- Crna Gora, Yugoslavian Cruiser laid down October 1st, 1939. 4,549 tons required; 455 / 4549 added Q3/40 for total 4549 / 4549. 0 tons remaining until completion. Completes this quarter.
- M-7 Kos laid down January 4th, 1940. 2,743 tons required; 700 / 2743 added Q3/40 for total of 2100 / 2743. 643 tons remaining until completion. Launched.

Thessaloniki:
D0: Idle
S0: Idle
S0: Idle

Volos:
D1: Idle

Dockside:

Limassol:
D3: - AC-2 Anatolia begins 50% partial reconstruction to buyers standards on July 1st, 1940. 7,332 tons required; 1833 / 7332 added in Q3/40 for total of 1833 / 7332. 5,499 tons remaining.

D1: Idle

From factories:
- GB-45, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-46, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-47, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-48, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-49, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-50, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- CMSW-45, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-46, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-47, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-48, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-49, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-50, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.

On Trails:
- C-36 Gaugamela laid down January 1st, 1938. Completed January 20th, 1940. Begins trails January 23rd, 1940. Completes trails July 30th, 1940.
- B-6 Lysandros laid down January 1st, 1936. Completed June 14th, 1940. Begins trails June 17th, 1940. Completes trails December 23rd, 1940.
- B-7 Perikles laid down January 1st, 1936. Completed June 7th, 1940. Begins trails June 10th, 1940. Completes trails December 16th, 1940.
- D-95 Eptanisa laid down July 1st, 1939. Completed June 12th, 1940. Begins trails June 15th, 1940. Completes trails December 21st, 1940.
- D-96 Kerkyra laid down July 1st, 1939. Completed June 17th, 1940. Begins trails June 20th, 1940. Completes trails December 26th, 1940.
- D-97 Paxi laid down July 1st, 1939. Completed June 4th, 1940. Begins trails June 7th, 1940. Completes trails December 13th, 1940.

[size=3]Transactions[/size]
Received 2,000t payment from Chile towards carrier Anatolia
Received 1,188t from Romania for cruiser contruction
Received 909 tons from Yugoslavia for cruiser construction
Sent 720 tons to Great Britain for Rhodos class fast minelayer construction

[size=3]Other Notes[/size]
Purchase from Great Britain also includes the buiders plans for the Rhodos Class, allowing sister ships to be built domestically.

[size=3]Order of Battle (Greek Navy) end of Q3 1940[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Fleet Combatants
Battleships 5(0)+0
Large Cruisers 2(0)+0
Carriers 5(1)+0
Training Carrier 1(0)+0
Heavy Cruisers 2(0)+1
Light Cruisers 14(0)+1
Escort Cruisers 6(0)+0
Flotilla Leaders 4(0)+0
Destroyers 62(0)+5
Submarines 46(0)+0
Torpedo Boats 10(0)+0

Small Combatants
Large Gunboats 14(0)+0)
Small Gunboats/Subchasers 50(0)+0
Minelayers 5(0)+5 (Plus 1 under construction in Great Britain)
Minesweepers 40(0)+0
Coastal Minesweepers 50(0)+0
Harbour Launches 3(0)+0
Other Small Combatants 145(0)+0

Auxiliaries
Special transports 5(0)+0
Landing Craft 32(0)+0
Training Ships 4(0)+0
Tenders 4(0)+0
Fleet Train 11(0)+0

This post has been edited 4 times, last edit by "Sachmle" (Mar 30th 2011, 12:12am)


2

Thursday, March 31st 2011, 10:17am

My fault or your fault ???

I do not want to be petty, but ....

If i look at our rules ...

Quoted

Wooden and steel vessels of 200 tons and smaller, 150ft and smaller, can be constructed at a number of (rounded up)

2 craft equal to or smaller than 25t per factory per quarter
or
1 craft equal to or smaller than 100t per factory per quarter
or
1 craft equal to or smaller than 200t per 3 whole factories (or part there of) per quarter.



and compare it with your report ...

Quoted


From factories:
- GB-45, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-46, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-47, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-48, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-49, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-50, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- CMSW-45, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-46, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-47, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-48, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-49, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-50, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.


you are building too much vessels than allowed !!!

Because our rule said 1 craft per 3 whole factories !!! You have 15 factories so you could build 5 not 12 vessels of a size of ~ 150ts.

Or do i understand something wrong ?????

3

Thursday, March 31st 2011, 3:08pm

Nobody's fault

Quoted

Originally posted by parador
I do not want to be petty, but ....

If i look at our rules ...

Quoted

Wooden and steel vessels of 200 tons and smaller, 150ft and smaller, can be constructed at a number of (rounded up)

2 craft equal to or smaller than 25t per factory per quarter
or
1 craft equal to or smaller than 100t per factory per quarter
or
1 craft equal to or smaller than 200t per 3 whole factories (or part there of) per quarter.



and compare it with your report ...

Quoted


From factories:
- GB-45, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-46, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-47, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-48, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-49, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- GB-50, 150-ton motor gunboat/subchaser (GB-150 class). 150 tons added.
- CMSW-45, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-46, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-47, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-48, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-49, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.
- CMSW-50, 165-ton coastal minesweeper/patrol boat (MSW-165 class). 165 tons added.


you are building too much vessels than allowed !!!

Because our rule said 1 craft per 3 whole factories !!! You have 15 factories so you could build 5 not 12 vessels of a size of ~ 150ts.

Or do i understand something wrong ?????

Technically, that's correct.

Just move them a few lines up and stick them in the idle slips instead, and the problem is solved.

4

Thursday, March 31st 2011, 5:21pm

In my defense, I'm just continuing what was started on the last sim before I took over and the spreadsheet I was given showing the building plan.