You are not logged in.

1

Monday, April 28th 2008, 4:31pm

Nordmark Q1/1936

A) Industry

21 factories (non fixed) producing 21000tons of ship materials. Plus stockpile of 10166tons. 750tons received from Yugoslavia, 750tons received from Persia and 5492tons received from Germany. Plus 799t scrap revenue.
2 factories (fixed) producing 0.2IP for Q1/1936

B) Infrastructure Development
Karlskrona Type 0 Dock #1 extending to type 1 Dock #2, 0.5IP needed, 0.2IP added.

C) Ship Construction

Karlskrona
Type 4 Slip #1: German CV Peter Strasser building, 17859t needed, 2232t added. Launched
Type 3 Dock #1: DD18-12 rebuilding to F18-2. 53t needed, 53t added. Completed
Type 3 Dock #2: BC Gota Lejon refitting as Target ship, All guns removed, 6055t needed, res 2055t.
Type 3 Slip #1: DD35-15 laid down, 1990t needed, 490t added.
Type 3 Slip #2: DD35-16 laid down, 1990t needed, 490t added.
Type 1 Dock #1: Aland Class CDS, Bombardsund starts Partial Reconstruction, 3034t needed. 1534t added.
Type 1 Slip #1: DD35-1 building, 1500t needed, 500t added. Launched
Type 1 Slip #2: DD35-9 laid down, 1990t needed, 490t added.
Type 0 Dock #1: extending
Type 0 Slip #1: MS35-5 laid down, 460t needed, 230t added. Launched
Type 0 Slip #2: MS35-6 laid down, 460t needed, 230t added. Launched


Free Floating:
BB33-A, Oscar II building, 9000tons needed, 1000tons added.
Yugoslavia (super-lofoten) CDS building, 6400t needed, 1600t added
MS35-1 building, 230t needed, 230t added, completed
MS35-2 building, 230t needed, 230t added, completed
Liner SS Stavangerfjord refitting to landing ship, 1000t needed, 1000t added. Completed
Liner SS Drottningholm refitting to landing ship, 1000t needed, 1000t added. Completed


Helsingfors Örlovsvarv
Type 3 Slip #1: DD35-10 laid down, 1990t needed, 490t added.
Type 1 Dock #1: idle
Type 1 Slip #1: DD35-2 building, 1500t needed, 500t added. Launched
Type 1 Slip #2: DD35-3 building, 1500t needed, 500t added. Launched
Type 0 Slip #1: idle

Free Floating:

Gustavsvern Naval Base, Trondheim
Type 4 Dock #1: Oden Class BB commencing 25% refit, 10188t needed, 1188t added.
Type 4 Slip #1: German CV Graf Zeppelin building, 22323t needed, 2232t added.
Type 3 Dock #1: idle
Type 3 Slip #1: DD35-11 laid down, 1990t needed, 490t added.
Type 1 Dock #1: idle
Type 1 Slip #1: DD35-4 building, 1500t needed, 500t added. Launched
Type 1 Slip #2: DD35-5 building, 1500t needed, 500t added. Launched
Type 0 Dock #1: idle
Type 0 Dock #2: idle
Type 0 Slip #1: MS35-7 laid down, 460t needed, 230t added. Launched
Type 0 Slip #2: MS35-8 laid down, 460t needed, 230t added. Launched



Free Floating:
BB33-B, Suomen Leijona building, 13000tons needed, 3000tons added.
Vendidad Class TB, Vendidad building, 1200t needed, 600t added.
PF35 class, PF35-6, 0t needed, 0t added. Completed
MS35-3 building, 230t needed, 230t added, completed
MS35-4 building, 230t needed, 230t added, completed

Karljohansvern Naval Base, Horten outside Oslo
Type 3 Slip #1: DD35-12 laid down, 1990t needed, 490t added.
Type 1 Slip #1: DD35-6 building, 1500t needed, 500t added. Launched

Freefloating:


Oscarsvern Naval Base, Leivsborg
Type 4 Dock #1: Dristigheten Class BC rebuilding, 8000t needed, 2000t added.
Type 4 Slip #1: idle
Type 3 Slip #1: DD35-13 laid down, 1990t needed, 490t added.
Type 1 Dock #1: idle
Type 1 Slip #1: DD35-7 building, 1500t needed, 500t added. Launched
Type 1 Slip #2: DD35-8 building, 1500t needed, 500t added. Launched
Type 0 Slip #1: idle
Type 0 Slip #2: idle

Free Floating:
BB33-C, Eric den Helige building, 18000tons needed, 2000tons added.
PF35 class, PF35-1, 0t needed, 0t added. Completed
PF35 class, PF35-2, 0t needed, 0t added. Completed
PF35 class, PF35-3, 0t needed, 0t added. Completed

Iceland Naval Station
Type 1 Dock #1: idle
Type 1 Slip #1: DD35-14 laid down, 1990t needed, 490t added.
Type 0 Slip #1: idle

Free Floating:
PF35 class, PF35-4, 0t needed, 0t added. Completed
PF35 class, PF35-5, 0t needed, 0t added. Completed

Faeroes Naval Station
Type 0 Dock #1: idle

Åland Naval Base
Type 3 Dock #1: idle
Type 1 Dock #1: idle
Type 0 Dock #1: idle

South Georgia Naval Base
Type 0 Dock #1: idle

D) Transactions

E) Other Notes

8-340mm main battery, 12-5.9inch , 12-110mm DP, 32-37mm AA from Gota Lejon:-
2-340mm & 4-5.9inch to South Georgia
2-340mm, 4-5.9inch, 4-110mm DP & 16-37mm AA to Bergen
4-340mm, 4-5.9inch, 8-110mm DP & 16-37mm AA to Stockholm

Troopships RNNS Stavangerfjord & Drottningholm starting trials.
F35 19-24 on trials
PF35 1-4 on trials
MS35 1 to 4 start trials
F18 class ships on trials

F) Updated Order of Battle, 1/1/36

Note: X(Y) +Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 2(1)3
BC: 4(1)0
CV: 3(0)0
CA: 4(0)0
CL: 35(0)0
DD: 66(0)16
Motor Torpedo Boats: 120(0)0
Torpedo boats: 32(0)0+1
Subs type (a): 18(0)0
Subs type (b): 16(0)0
Sloops/Frigates: 118(0)14
CDBB: 5(1)0
Auxiliaries 14(2)0
Landing Craft 50(0)0
Target Ships 0(1)0


New stockpile of 9703tons

2

Monday, April 28th 2008, 6:03pm

Persia sent 1500 tons, final payment

3

Monday, April 28th 2008, 6:07pm

Ok, though out of a desire not to re-write my 1936 reports another time, I will keep it spread over Q1+2 (according to the original plan) if that is ok. (Say half of it got delayed in the post)

This post has been edited 2 times, last edit by "Earl822" (Apr 28th 2008, 6:09pm)


4

Monday, April 28th 2008, 6:16pm

No problem