You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, January 28th 2007, 2:35am

Colombia Q3/33

Columbia

A. Industrial Allocation

1/4 factories (non fixed) to naval materials: 1,000 tons created for Q3/1933 + 150 tons stockpiled from Q2/33

Total warship materials: 1,150

885 tons used for ship building, 265 tons stockpiled for next quarter.

1/4 factory's (fixed) to infrastructure development: 0.1 points for Q3/1933
2/4 factory's (non fixed) to infrastructure development: 0.2 points for Q3/1933
0.2 IP's recieved from Atlantis in Q3/1933

Total: 0.5 infrastructure points created for Q3/33 .

B. Infrastructure Development

0.5 points used for upgrade of Type 2 drydock to Type 3 at Cartagena (0.5 IP's)


C. Naval Construction

Cartagena:
Class 2 Slip #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - 611 type MGB #6 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - 611 type MGB #7 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - Idle
Class 0 Slip #4 - completed
Class 2 Drydock #1 - begins upgrading to type 3, 1.0 points needed, 0.5 points added
Class 1 Drydock #1 - Idle

at Buenaaventura:
Class 2 Slip #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - 611 type MGB #8 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - 611 type MGB #9 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - 611 type MGB #10 laid down, 177 tons needed, 177 tons added
Class 0 Slip #4 - Idle
Class 3 Drydock #1 - Idle
Class 0 Drydock #1 - Idle

Launched ships being completed:

None

Ships completed/transfered and on trials

5x611 type MGB's

Building summary

5x611 type MGB's laid down (885 tons)

D. Transactions

None


D. Transactions

0.2 IP's recieved from Atlantis

E. Other Notes

Armoured cruisers Cali and Medellin taken out of service to provide crews for Atlantean CL's

F. Miscellaneous Works

None.

F. Updated Order of Battle, 1/1/32

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Pre dreadnoughts:.......2(0)0
Armoured Cruisers:.....2(0)0
Light Cruisers.............2(0)0
Destroyers:................8(0)0
Torpedo boats:............5(0)0
escorts:......................0(0)0
Gunboats:..................6(0)0
River Gunboats...........2(0)0
Submarines:...............0(0)0
Patrol vessels:............1(0)0 Armed Tug Jose Felix Ribas
Mine warfare ships:.....0(0)0
Sub chasers:..............0(0)0
Motor Gun Boats:........5(0)5
Motor Launches:.........5(0)0
Motor Torpedo boats:..40(0)0
Depot ships:...............0(0)0
Auxillary's:..................0(0)0