You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, January 25th 2007, 9:06am

Turkey Q3/33

*subject to editing*

A. Industrial Allocation

2/6 factories (non-fixed) to naval materials: 2,000 tons created for Q3/1933 + 79 tons stockpiled from Q2/33 = 2,079 tons,
2,000 tons used, 79 tons stockpiled for next quarter

1/6 factories (fixed) to infrastructure development: 0.1 points for Q3/1933

3/6 factories (non-fixed) to infrastructure development: 0.3 points for Q3/1933

Total 0.4 points created for Q3/33 plus 0.4 IP's transfered from Atlantis for total of 0.8 IP's for use in Q3/33

0.3 IP's transfered to India

B. Infrastructure Development

0.3 points added to one Type 3 Drydock at Icel
0.2 points added to one Type 0 Slip at Icel

C. Naval Construction

Istambul
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle
Type 1 slip #3 - Idle
Type 0 slip #1 - PB-18 building, 449 tons needed 249 tons used, 200 tons added
Type 0 slip #2 - PB-19 building, 449 tons needed 249 tons used, 200 tons added

Patrol boats PB-14 and PB-15 completed, begin trials

Izmit

Type 3 drydock #1 - Idle
Type 2 slip #1- CL Istambul building 6,943 tons needed, 4,043 tons used, 1,200 tons added
Type 1 drydock #1 - Idle
Type 1 slip #1 - Idle
Type 1 slip #2 - Idle

Patrol boats PB-16 and PB-17 completed, begin trials

Samsun

Type 3 drydock #1 - Idle
Type 1 drydock #1 - Idle
Type 0 drydock #2 - Idle


Icel

Type 3 drydock #1 under construction, 4.0 points needed, 2.5 points used, 0.3 points added
Type 1 slip #1 - PB-20 building, 449 tons needed 249 tons used, 200 tons added
Type 1 slip #2 - PB-21 building, 449 tons needed 249 tons used, 200 tons added
Type 0 slip #1 - under construction, 0.5 Ip's needed, 0.1 IP used, 0.2 IP added
Type 0 drydock #1 - Idle


Trabzon

Type 1 drydock #1 - Idle


Launched ships being completed:

None

Ships completed/transfered and on trials

PB-14 -PB-17 on trials

Summary of ship building/repairs/rebuilds and convertions.

CL Istambul building (1,200 tons)
4xPB-14 class Patrol boats building (800 tons)

D. Transactions

0.3 IP's transfered to india for construction of battleship Mahmudieh
0.4 IP's transfered to Turkey from Atlantis, total to be transfered 6.8 IP's, 5.9 IP's transfered as of this quarter

E. Other Notes

None

F. Updated Order of Battle, 4/1/33

Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
BB: 2(0)1 * Mahmudieh building in India
BC: 1(0)0
PD: 2(0)0
AC: 1(0)0
CA: 1(0)0
PC: 2(0)0
CL: 5(0)1
DD: 25(0)0
Torpedo boats: 28(0)0
Sloops: 1(0)0
Frigates: 0(0)0
Moniters:0(0)0
Torpedo gunboats: 2(0)0
Gunboats 8(0)0
Patrol vessels 16(0)4
MTB's: 18(0)0
Mine sweepers 6(0)0
Minelayers 3(0)0
Mine warfare ships 4(0)0
Sub chasers 36(0)0
Motor Launches 39(0)0
Motor Launche/minlayers 10(0)0
Fleet Submarine: 0(0)0
Coastal Submarine:0(0)0
Floatplane carrier/tenders 0(0)0
destroyer depot ships 2(0)0
Submarine depot ships 0(0)0
Auxillary's N/A