You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, May 12th 2006, 2:23pm

German Naval Developments – Q1/31

German Naval Developments – Q1/31

A. Industrial Allocation

Factory Allocation:

Warship Material: 8
Infrastructure (Committed): 20 (Bonus production this quarter = 0 pts)
Infrastructure (Non-committed): 0

Warship Material Produced: 8000 t
Stockpile: 4137 t
Recycled Scrap: 426 t
Export Orders: 1932 t
Material Used on Construction: 6124 t
New Stockpile: 6013t

B. Infrastructure Development

Factory 29 receives 1 point, for 1 total.
Factory 30 receives 1 point, for 1 total.

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: SS U-3 laid down, receives 135t
1 Type 0 slip: SS U-4 laid down, receives 135t
1 Type 0 drydock: Idle
Free-floating: SS U-2 receives 9t, completed, begins trials.

At Bremerhaven

1 Type 3 slip: CA Ersatz B receives 1773t, christened Admiral Scheer, launched
1 Type 1 slip: DD Z-216 laid down, receives 451t
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: Idle

At Cuxhaven

1 Type 4 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: CL Ankara receives 1302t
1 Type 1 slip: DD Z-217 laid down, receives 451t
1 Type 0 slip: Idle
Free-floating: DD Z-215 receives 241t, completed, begins trials

At Kiel

1 Type 4 slip: CB Ersatz C laid down, receives 2051t
1 Type 2 slip: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: MH R-11 laid down, receives 161t
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: CA Admiral Hipper receives 1773t

D. Transactions
CB Ersatz C laid down
DDs Z-216, Z-217 laid down
SSs U-3, U-4 laid down
MH R-11 laid down

E. Other Notes
SS U-1 continues her trials
DD Z-214 continues her trials
SS U-2 completed, begins her trials
DD Z-215 completed, begins her trials


F. Updated Order of Battle, 3/31/31

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
CB: 0(0)+1
CA: 0(0)+2
CL: 12(0), +1 export
DD: 20(0)+2,
SS: 2(0)+2
SL: 6(0)+0
AM: 10(0)+1
TB: 4(0)+0
Target: 1(0)+0


[Note: the CB Ersatz C is the Blucher that's been posted before, the MH R-11 is a minehunter of the R-11 class posted recently.]