Quarterly Report #39 for the SAE

Note: There had been some minor errors in my Q1 and Q2 reports which are corrected with Q3.

[SIZE=3]SAE Quarterly Reports[/SIZE]

No. 39 – July to September 1930



[SIZE=3]Transfers: [/SIZE]

383ts received from Nordmark as licence fee
4680ts received from Japan as licence fee


[SIZE=3]Factories:[/SIZE]

26 factories total can be used.

Fixed factories

4 factory will be fixed to produce infrastructure points for 1930.

Flexible factories

5951ts material transferred from Q2 (incl. material recovered from scrapyard).

13,371ts material necessary to be produced in this quarter (13 factories).

13 factory will produce infrastructure points this quarter.

Infrastructure points used this quarter:

0,0pts put into a new Type 1 Dock in Port Louis for a total of 0,7pts at the end of Q3
1,3pts to expand a Type 2 Slip in Port Elizabeth for a total of 3,8pts at the end of Q3

[SIZE=3]Ships:[/SIZE]

Minor vessels

Completed Units

48x UJ26-class ASW launch

24x R28-class motor launch

15x Tree-class minesweeper (Type 16)
16x Bush-class minesweeper (Type 21)
6x MS28-class minesweeper

4x Polar-class sloops
16x S-class sloops

16x River-class frigate

8x Pleiades-class light destroyers
6x Planet-class light destroyers

6x Guard-class patrol crafts

On Trials

2x MS28-class minesweeper
- MS28-7 running trials until July 30
- MS28-8 running trials until August 30

1x SL29-class sloop
- Circe running trials until July 30

8x R28-class motor launch
- R25-R32 running trials until September 30

Ordered Units

6x MS28-class minesweeper (Type 28 - 10 month á 56ts material necessary per unit)
- MS28-16 laid down in Port Louis on a Type 0 slip in March, completed December 30
- MS28-15 laid down in Montevideo on a Type 0 slip in February, completed November 30
- MS28-14 laid down in Montevideo on a Type 0 slip in February, completed November 30
- MS28-10 laid down in Buenos Aires on a Type 0 slip in February, completed November 30
- MS28-11 laid down in St. Helena on a Type 1 slip in January, completed October 30
- MS28-9 laid down in St. Helena on a Type 0 slip in January, completed October 30

2x LD29-class light destroyer (10 month á 58ts material necessary per unit)
- Pluto laid down in Buenos Aires on a Type 1 slip in January, completed October 30
- Neptune laid down in Mar del Plata on a Type 1 slip in January, completed October 30

1x SL29-class sloop (11 month á 100ts material necessary per unit)
- Medusa laid down in Montevideo on a Type 4 slip in March, completed December 30

8x R28-class motor launch (1 month á 92ts material necessary per unit)
- R33-R40 build in Lüderitz in September

4x UJ30-class ASW launch (1 month á 196ts material necessary per unit)
- UJ49-UJ52 build in Lüderitz in August

Rebuilds

None

Scrapping

1x SL11-class (4 month total, 2 month in Type 0 dock)
- Hylaios scrapping in Port Elizabeth starting in December, finished in March – 126ts received from hull for Q3/1930

4x SL14-class (4 month total, 2 month in Type 0 dock)
- Sentinel scrapping in Durban starting in January, finished in April – 142ts received from hull for Q4/1930
- Surprise scrapping in Douala starting in March, finished in June – 142ts received from hull for Q4/1930
- Swan scrapping in Libreville starting in February, finished in May – 142ts received from hull for Q4/1930
- Swift scrapping in Durban starting in June, finished in September – 142ts received from hull for Q1/1931


Destroyers

Completed Units

12x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)

12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
14x Nymph-class destroyer (Type 27)

6x DL28-class destroyer leader (Type 28)

On Trials

2x Nymph-class destroyer (Type 27)
- Polynoe running trials until July 30
- Neso running trials until August 30

2x DL28-class destroyer leader
- Longspear running trials until September 30
- Scythe running trials until December 30

Ordered Units

8x DD30-class destroyer (11 month á 145ts material necessary per unit)
- Pontoporeia laid down in Durban in a Type 1 slip in January, completed in November 30
- Proto laid down in Cape Town in a Type 1 slip in January, completed in November 30
- Protomedeia laid down in Port Elizabeth in a Type 1 slip in January, completed in November 30
- Sao laid down in Daressalam in a Type 1 slip in January, completed in November 30
- Speio laid down in Douala in a Type 1 slip in January, completed in November 30
- Themisto laid down in Majunga in a Type 1 slip in March, completed in January 31
- Pronoe laid down in Cape Town in a Type 2 slip in April, completed in February 31
- Psamathe laid down in Daressalam in a Type 2 slip in April, completed in February 31

Rebuilds

None

Scrapping

None


Class B Cruisers

Completed Units

6x Insect-class torpedoboat
4x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
1x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
4x Aurora-class light cruiser
4x Arion-class light cruiser

On Trials

1x CL16-class light cruiser
- Santa Fe running trials until July 30

1x CL29-class light cruiser
- Douala II running trials until November 30

Ordered Units

3x CL29-class light cruiser (17 month á 458ts material necessary per unit)
- Pietermaritzburg II laid down in Durban in a Type 2 dock in March, completed in July 30
- Blantyre II laid down in Port Louis on a Type 2 slip in March, completed in July 31
- Beira II laid down in Buenos Aires on a Type 2 slip in January, completed in May 31

3x DL30-class destroyer leader (12 month á 218ts material necessary per unit)
- Fenris laid down in Durban in a Type 3 Dock in January, completed in December 30
- Kweldulf laid down in Cape Town in a Type 2 Dock in January, completed in December 30
- Freki laid down in Durban in a Type 2 Dock in July, completed in June 31

Rebuilds

4x CL16-class light cruiser (12 month á 192ts/month material necessary per unit)
- Pelotas entering a Type 3 dock in Daressalam in September. Leaving the dock in Januar 30, the cruiser will stay in the yard until August 30
- Rio Grande entering a Type 2 dock in Montevideo in September. Leaving the dock in Januar 30, the cruiser will stay in the yard until August 30
- Santa Marina entering a Type 2 dock in Daressalam in November. Leaving the dock in March 30, the cruiser will stay in the yard until October 30
- Santana entering a Type 3 dock in Daressalam in September. Leaving the dock in January 31, the cruiser will stay in the yard until August 31

Scrapping

5x TB18-class (5 month total, 2 month in Type 1 dock)
- Gadfly scrapping in Montevideo starting in January, finished in May – 296ts received from hull for Q4/1930
- Mantis scrapping in Buenos Aires starting in February, finished in June – 296ts received from hull for Q4/1930
- Flea scrapping in Port Elizabeth starting in May, finished in September – 296ts received from hull for Q1/1931
- Mosquito scrapping in Durban starting in August, finished in December – 296ts received from hull for Q2/1931
- Dragonfly scrapping in Buenos Aires starting in July, finished in November – 296ts received from hull for Q2/1931


Class A Cruisers

Completed Units

1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)

On Trials

None

Ordered Units

2x CA29-class heavy cruiser (21 month á 545ts material necessary per unit)
- Ladon laid down in Montevideo on a Type 3 slip in January, completed in September 30
- Fafnir laid down in Curban on a Type 3 slip in August, completed in April 31

Refits

None

Scrapping

2x General-class (10 month total, 4 month in Type 4 dock)
- Van de Loo scrapping in Buenos Aires starting in May, finished in November – 1.623ts received from hull for Q3/1930, guns of first, second and third battery stored
- Hegendorff scrapping in Montevideo starting in December, finished in November – 1.623ts received from hull for Q4/1930, guns of first, second and third battery stored


Capital Units

Completed Units

2x Hertog-class
4x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class

On Trials

None

Ordered Units

None

Rebuilds

None

Scrapping

1x Sao Tome-class (10 month total, 4 month in Type 4 dock)
- Sao Tome scrapping in Montevideo starting in January, finished in October – 3.095ts received from hull for Q3/1930, guns of first, second and third battery stored


Coastal Defence Units

Completed Units

1x Nagelring-class
1x Tyrfing-class

2x LCDS-class
1x LCDS-2-class

On Trials

None

Ordered Units

1x LCDS-2-class coast defense ship (11 month á 169ts material necessary per unit)
- Nagelfar laid down in Buenos Aires on a Type 3 slip in September, completed in July 30

1x CDS5-class coast defense ship (17 month á 448ts material necessary per unit)
- Gungnir laid down in Cape Town on a Type 3 slip in June, completed in October 30


Carriers

Completed Units

1x CV25B-class
1x CV26-class

Ordered Units

2x CV30-class light fleet carrier (23 month á 587ts material necessary per unit)
- Anvil laid down in Cape Town on a Type 3 slip in January, completed in November 31
- Gripper laid down in Buenos Aires on a Type 3 slip in August, completed in June 32

On Trials

None

Ordered Units

None


Class A Submarines

Completed Units

12x E-class submarine
16x F-class submarine
4x J-class submarine

Ordered Units

None


Class B Submarines

Completed Units

9x G-class submarine
15x I-class submarine
12x H-class submarine
12x K-class submarine

On Trials

4x K-class submarine
- K13 running trials until July 30
- K16 running trials until July 30
- K14 running trials until August 30
- K15 running trials until July 30

Ordered Units

None

Scrapping

6x G-class (4 month total, 1 month in Type 0 dock)
- G3 scrapping in Montevideo starting in January, finished in April – 69ts received from hull for Q4/1930
- G1 scrapping in Mar del Plata starting in February, finished in June – 69ts received from hull for Q4/1930
- G4 scrapping in Montevideo starting in May, finished in August – 69ts received from hull for Q1/1931
- G2 scrapping in Mar del Plata starting in February, finished in June – 69ts received from hull for Q1/1931
- G5 scrapping in Montevideo starting in September, finished in December – 69ts received from hull for Q2/1931
- G7 scrapping in St. Helena starting in August, finished in November – 69ts received from hull for Q2/1931


Non-combatants

Completed Units

15x Bay-class tender (several different designs)

4x Mimir-class floatplane carriers

1x Bölthorn-class floatplane carrier

On Trials

1x Bölthorn-class floatplane carrier
- Egdir running trials until July 30

1x TD29-class tender
- TD29-1 running trials until July 30

Ordered Units

2x Thjazi-class floatplane carrier (15 month á 354ts material necessary per unit)
- Thjazi laid down in Durban on a Type 4 slip in July, completed in September 30
- Ymir laid down in Montevideo on a Type 2 slip in July, completed in September 31

Refit

1x TD Bonny Bay-class tender (3 month á 193ts/month material necessary per unit)
- Bonny Bay entering a Type 1 dock in Montevideo in September. Leaving the dock in October, the cruiser will stay in the yard until November 30

--------------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only):

48 ASW launches
24 motor launches
37 minesweepers
56 small patrol crafts
80 TB/DDs (does not include 11 TBs with 15cm guns)
37 cruisers category b (include 11 TBs with 15cm guns)
7 cruisers category a
14 capital units
5 costal defence ships
2 fleet carrier
48 submarines category b
32 submarines category a
5 floatplane carriers
15 armed tenders

plus numerous auxiliary vessels of all kind.


HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

2

Friday, May 5th 2006, 11:18am

UJ30-class, ASW Launch laid down 1930

Displacement: 200ts standard
Dimensions: 43,97 m / 42,00 m x 5,80 m x 2,00 m
Armament: 1 - 3,46" / 88,0 mm guns in single mounts
Machinery: Diesel Internal combustion motors,
Geared drive, 2 shafts, 2.392 shp
Complement: 29 - 38
Cost: £0,082 million / $0,329 million