You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, April 18th 2021, 1:04am

Yugoslavia 1Q50 Sim Report

Yugoslavia 1Q50 Sim Report

A. Factories

Factories : 2
Producing Warship Material : 2
Tonnage Produced : 2,000
Producing Infrastructure (Committed) : 0
Producing Infrastructure (Non - Committed) : 0
Infrastructure Points Produced : 0.00
Bonus IP for Committed Factories : 0.00
Total IP Available : 0.00

Tonnage Produced : 2,000
Tonnage Transferred In : 0
Tonnage Received in Payment : 0
Tonnage Reclaimed From Scrap : 0
Tonnage Previously Stockpiled : 71
Total Tonnage Available : 2,071
Tonnage Paid : 800
Tonnage Used in Construction : 1,095
Tonnage Remaining for Stockpile : 176


B. Infrastructure Development

At Bar: None

At Belgrade: None


C. Naval Development and Construction

At Bar:

Dock No.1 (Type 2.0): Idle

Dock No.2 (Type 0.0): Idle

Slip No.1 (Type 1.5): Project 1950 Theta - Submarine Rescue Vessel A – Laid down 1 January 1950 – Requires 1,417 tons, receives 365 tons, 1,052 tons remaining

Slip No.2 (Type 0): Idle

Slip No.3 (Type 0): Idle

Dockside:

Project 1949 Beta – Frigate C – Launched 16 November 1949; requires 1,460 tons, 730 tons previously committed; receives 365 tons, 365 tons remaining

Project 1949 Beta – Frigate D – Launched 16 November 1949; requires 1,460 tons, 730 tons previously committed; receives 365 tons, 365 tons remaining


At Belgrade:

Dock No.1 (Type 0): Idle

Slip No.1 (Type 0): Idle

Pierside


At Durres:

Floating Dock No.1 (Type 1.0): - Idle

At Kotor:

Floating Dock No.1 (Type 0.0) - Idle


Small Craft Construction

None


D. Transactions

Submarine A ordered from French shipyard. Projected completion February 1950. Cost 450 tons plus 50 tons for design/development/overhead. 100 tons paid this quarter for completion.

Submarine B ordered from French shipyard. Projected to be laid down 1 January 1950. Cost 450 tons of which 350 tons paid this quarter, with 100 tons remaining.

Submarine C ordered from French shipyard. Projected to be laid down 1 January 1950. Cost 450 tons of which 350 tons paid this quarter, with 100 tons remaining.


E. Refits

None


Ships Laid Down This Quarter

At Bar:

Project 1950 Theta - Submarine Rescue Vessel A

At Belgrade:

None

Foreign Yards:

Submarine B
Submarine C


Ships Launched This Quarter

At Bar:

At Belgrade:

None


Ships Completed This Quarter

At Bar:

None

At Belgrade:

None

Ships Undergoing Trials

Submarine A (from French shipyard)

Ships Completing Trials

Project 1949 Theta - Minesweeper C - Paučko
Project 1949 Theta - Minesweeper D - Humci

F. Scrappage Report

None


Updated Order of Battle

Type : In Service + Trials + Building + Refitting = Total
Light Cruisers : 4 + 0 + 0 + 0 = 4
Destroyer Leaders : 3 + 0 + 0 + 0 = 3
Destroyers : 8 + 0 + 0 + 0 = 8
Light Destroyers : 4 + 0 + 0 + 0 = 4
Frigates : 0 + 2 + 2 + 0 = 4
Escort Sloops : 8 + 0 + 0 + 0 = 8
Corvettes 8 + 0 + 0 + 0 = 8
Submarines 3 + 1 + 2 + 0 = 6
Armoured Gunboats : 8 + 0 + 0 + 0 = 8
Gunboat-Minelayers : 2 + 0 + 0 + 0 = 2
Minecraft 16 + 0 + 0 + 0 = 16
Motor Torpedo Boats : 36 + 0 + 0 + 0 = 36
Fleet Tender 2 + 0 + 0 + 0 = 2
Seaplane Tender : 1 + 0 + 0 + 0 = 1
Ammunition Auxiliaries : 4 + 0 + 0 + 0 = 4
Landing Ships : 8 + 0 + 0 + 0 = 8
Netlayers : 4 + 0 + 0 + 0 = 4
Submarine Rescue Ship : 0 + 0 + 1 + 0 = 1
Riverine Monitors : 8 + 0 + 0 + 0 = 8
River Tugs : 2 + 0 + 0 + 0 = 2