You are not logged in.

1

Thursday, May 28th 2020, 5:04am

Kingdom of Greece Q2 1949

Industrial Allocation
10/15 factories producing 10000t materials.
5/15 factories producing 0.5 infrastructure. (non-dedicated)
0/15 Factories producing infrastructure. (dedicated)
373from stockpile.
Ot from transactions.
Ot from scraping.
10373t Total materials available
10112 t Used
261t Stored

Infrastucture Development
Volos:
- 0.3 IP added to the construction of a Type 0 Slip at Volos. - 0.2 instaled, 0.2 remaining.
- 0.2 IP added to the construction of a Type 1 Slip at Volos. - 0.2 instaled, 0.8 remaining.


Naval Construction
Attica:
Type 3 Dry-Dock #1 -
Type 3 Dry-Dock #1 -
Type 2 Drydock #1 - Ares Class Light Cruiser Ares; laid down April 1st, 1940. 2162,5 tons required. 689 tons added in Q2/1949 for a total of 1180/ 2162,5 tons. 982,5/ 2162,5 tons remaining.
Type 2.5 Slip #1 - Argos Class heavy cruiser Argos; laid down May 1st, 1949. 11827 tons required. 1971,17 tons added in Q2/1949 for a total of 1971,17/ 11827 tons. 9855,83/ 11827 tons remaining. Launched December 12th, 1949. Completed december 28th, 1950.
Type 2 Slip #1 - Tiriis Class light cruiser Tiriis; laid down january 15tht, 1949. 7425 tons required. 1743 tons added. In Q2/1949 for a total of 1743/7425 tons. 5229/7425 tons remaining. Launched July 1st, 1949. Completed April 1st, 1950.
Type 2 Slip #2 - Tiriis Class Light Cruiser Tetríreis; laid down january 15tht, 1949. 7425 tons required. 1743 tons added. In Q2/1949 for a total of 1743/7425 tons. 5229/7425 tons remaining. Launched July 1st, 1949. Completed April 1st, 1950.
Type 1 Slip #1 - Nemea Class destroyer Nemea; laid down january 1st, 1949. 2082 tons required. 947 tons added in Q2/1949 for a total of 947/2082 tons. 947/2082 tons remaining. Launched april 15th, 1949. Completed november 1st, 1949.
Type 0 Slip #1 - Porject AS1 Paros; laid down May 4th, 1949. 381 tons required. 381 tons added. In Q2/1949 for a total of 381/381 tons. 0/381 tons remaining. Launched June 15th, 1949. Completed July 15th, 1949.
Type 0 Slip #1 - Makhai Class Ioke; laid down May 3th, 1949. 720 tons required. 240 tons added in Q2/1949 for a total of 240/ 884 tons. 480/720 tons remaining. Launched July 26th, 1949. Completed January 24th, 1949.


Dockside:

Paros:
Type 1 Dry-Dock #1 -
Type 0 Dry-Dock #1 -

Dockside:

Patra:
Type 1 Dry-Dock #1 -
Type 1 Slip #1 - Nemea Class destroyer Nemesis; laid down january 1st, 1949. 2082 tons required. 947 tons added in Q2/1949 for a total of 947/2082 tons. 947/2082 tons remaining. Launched april 15th, 1949. Completed november 1st, 1949.
Type 0 Dry-Dock #1 -

Dockside:

Salamis:
Type 1 Dry-Dock #1 -

Dockside:

Souda Bay:
Type 4 Dry-Dock #1 -
Type 3 Dry-Dock #1 -
Type 2 Slip #1 -
Type 2 Drydock #1 - Ares Class Light Cruiser Apollo; laid down April 7th, 1941. 2162,5 tons required. 689 tons added in Q2/1949 for a total of 1180/ 2162,5 tons. 982,5/ 2162,5 tons remaining.
Type 1.5 Dry-Dock #1 -
Type 1.5 Dry-Dock #1 -
Type 1.5 Dry-Dock #1 -

Dockside:

Thessaloniki:
Type 2 Dry-Dock #1 -
Type 0 Dry-Dock #1 -
Type 0.5 Slip #1 - Porject AS1 Volos; laid down May 4th, 1949. 381 tons required. 381 tons added. In Q2/1949 for a total of 381/381 tons. 0/381 tons remaining. Launched June 15th, 1949. Completed July 15th, 1949.

Type 0.5 Slip #2 - Porject AS1 Limassol; laid down May 4th, 1949. 381 tons required. 381 tons added. In Q2/1949 for a total of 381/381 tons. 0/381 tons remaining. Launched June 15th, 1949. Completed July 15th, 1949.

Dockside:


Volos:
Type 1 Dry-Dock #1 -
Slip type 0 nº?

Dockside:

Limassol:
Type 3 Dry-Dock #1 -
Type 1 Dry-Dock #1 -


Note: The Project M2A1 has change it name to Project AS1

2

Wednesday, June 3rd 2020, 12:08am

I forgot to add it so here it is.
Also. I know that this not the place to ask but would do you like if I post about some greek experiments? To be more clear. This experiments would be around different projects of the WW greek army, either successful or not. :?:

Order of Battle (Greek
Navy) Q1 1949


Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

[b]Fleet Combatants
[/b]
Battleships 5(0)+0
Heavy Cruisers 4(0)+1
Medium Cruisers 2(0)+0
Light Cruisers 19(2)+2
Aircraft Carriers 1(0)+0
Flotilla Leaders 4(0)+0
Class "A" Destroyers 45(0)+2
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 17(0)+1
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 24(0)+0

Small Combatants
Subchasers (150t) 56(0)+3
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (200t) 30(0)+0
Harbour Launches (65t) 21(0)+0
Mtb 96(0)+0
Mgb 27(0)+0
Mms 22(0)+0

Auxiliaries
Special Transports 5(0)+0
Large Landing Craft (200t) 52(0)+0
Small Landing Craft (65t) 16(0)+0
Tenders 4(0)+0
Fleet Train 10(0)+0
Fleet Tugs 6(0)+0
Harbour Tugs 0(0)+0

[b]Training Squadron
[/b]
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0