Atlantis quarterly report Q-3
A. Industrial Allocation
26/31 factories (non fixed) to naval materials: 26,000 tons created for Q3/1948 plus 1,000 tons transfered from foreign sources (1,000 tons from Byzantium) plus 228 tons stockpiled from Q2/48
Total warship materials: 27,228
27,228 tons used for ship building, 0 tons stockpiled for next quarter
1/31 factory's (non-fixed) to infrastructure development: 0.1 points
4/31 factory's (fixed) to infrastructure development: 0.4 points
Total: 0.5 IP
B. Infrastructure Development
Four type 1 slips at Eridanus upgrading to type 1.5 slips
C. Naval Construction
At Cleito
Class 4 Slip #1 - CV Helios building, 29,354 tons needed, 13,854 tons used, 2,500 tons added
Class 4 Slip #2 - CV Asteria building, 29,354 tons needed, 13,854 tons used, 2,500 tons added
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - idle
Class 1 Slip #1 - Type 42 class sub Shorttail launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #2 - Type 42 class sub Flagtail launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #3 - Type 42 class sub Ribbonttail launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #4 - Type 42 class sub Sawtail launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
At Eridanus
Class 4 Slip #1 - CV Epimetheus building, 29,354 tons needed, 13,854 tons used, 2,500 tons added
Class 4 Slip #2 - CV Euryphaessa building, 29,354 tons needed, 13,854 tons used, 2,500 tons added
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 1.5 Slip #1 - Idle
Class 1.5 Slip #2 - Idle
Class 1 Slip #3 - upgrading to type 1.5, 0.5 IP needed, 0.4 IP used, 0.1 IP added
Class 1 Slip #4 - upgrading to type 1.5, 0.5 IP needed, 0.4 IP used, 0.1 IP added
DD's Charger and Chaser freefloating 2,605 tons needed(each), 1,965 tons used (each), 640 tons added (each)
Tender Venerable free floating, 12,724 tons needed, 8,724 tons used, 1,200 tons added
At Duecalion
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 0 slip #1 - Idle
Class 0 slip #2 - Idle
Class 0 slip #3 - Idle
Class 0 slip #4 - Idle
10x30 ton LCM type 3 built, 300 tons used
5x52 ton LCM type 4 built, 260 tons used
DD's Crusader and Challenger freefloating 2,605 tons needed(each), 1,965 tons used (each), 640 tons added (each)
Tender Virtuous free floating, 12,724 tons needed, 8,724 tons used, 1,200 tons added
Airship tender Polaris (ex Lamia) converting to Missile test ship, 2,542 tons needed, 299 tons added
At Illissus
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - upgrading to type 1.5 slip, 0.5 IP needed, 0.1 IP used, 0.1 IP added
Class 1 Slip #2 - begins upgrade to type 1.5 slip, 0.5 IP needed, 0.1 IP added
Class 1 Slip #3 - begins upgrade to type 1.5 slip, 0.5 IP needed, 0.1 IP added
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
DD's Dodger and Dasher freefloating 2,605 tons needed(each), 1,965 tons used (each), 640 tons added (each)
Airship tender Regulus (ex Tronagarru) converting to Missile test ship, 2,542 tons needed, 299 tons added
At Palinerus
Type 2.5 Drydock #1 - Type 42 class sub Epaulette building, 1,900 tons needed, 950 tons used, 475 tons added
Type 2.5 Drydock #2 - Type 42 class sub Wobblegong building, 1,900 tons needed, 950 tons used, 475 tons added
Type 0.5 Drydock #1 -Type 42 class sub Finback building, 1,900 tons needed, 950 tons used, 475 tons added
Type 0.5 Drydock #2 - Type 42 class sub Blacktip building, 1,900 tons needed, 950 tons used, 475 tons added
Type 0.5 Drydock #3 - Type 42 class sub Blackgill building, 1,900 tons needed, 950 tons used, 475 tons added
Type 0.5 Drydock #4 - Type 42 class sub Barbelthroat building, 1,900 tons needed, 950 tons used, 475 tons added
At Phelleus
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - Type 42 class sub Spottail launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #2 - Type 42 class sub Spurdog launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #3 - Type 42 class sub Great White launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #4 - Type 42 class sub Mako launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
At Lycabettus
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - Type 42 class sub Leopard launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #2 - Type 42 class sub Tiger launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #3 - Type 42 class sub Blue launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Slip #4 - Type 42 class sub Goblin launched, 1,900 tons needed, 1,425 tons used, 475 tons added
Class 1 Drydock #1 - Idle
DD's Defender and Dagger freefloating 2,605 tons needed (each), 1,965 tons used (each), 640 tons added (each)
At Maracaibo
Class 5 Drydock #1 - Idle
Class 1 drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
At Safi
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
Constantinople, Byzantium
Type 3 drydock #1 - Idle
Type 1 drydock #1 - Idle
Type 0 slip #1 - Idle
Type 0 slip #2 - Idle
Type 0 slip #3 - Idle
Type 0 slip #4 - Idle
Ships completed and on trials:
none
Summary of ship building/repairs/rebuilds and convertions.
4 Helios class CV's building (10,000 tons)
8xArcher batch 2 DD's building (5,120)
2xVenerable class tenders building (2,400 tons)
2xPolaris class missile test ships converting 598 tons
18xType 42 class subs building (8,550 tons)
10xLCM(3) and 5xLCM(4) built, 560 tons (300/260)
Total: 27,228 tons
D. Transactions
1,000 tons from Byzantium
E. Other Notes
8xAves class Frigates completed scrapping (Q2/4

, 1,296 tons of scrap materials to be recovered in Q4/48
F. Miscellaneous Works
None
G. Updated Order of Battle, 1/3/46
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships:................................19(0)0
Battlecruisers:.............................4(0)0
CV:............................................15(0)4
Training CV's:..............................2(0)0
Training cruisers:.........................2(0)0
CA:............................................18(0)0
CL:.............................................38(0)0
DD: type A................................16(0)0
DD: type B................................128(0)8
DD: (type C/ escorts).................80(0)0
Torpedo boats:...........................N/A
Moniters:...................................2(0)0
Escort Cruisers:..........................2(0)0
Sloops:.......................................0(0)0
Frigates:.....................................8(0)0
Corvettes:...................................0(0)0
Torpedo gunboats:......................0(0)0
Gunboats:.................................0(0)0
Mine sweepers:.........................24(0)0
Mine warfare vessels:.................16(0)0
Fleet Submarine:........................90(0)18
Coastal Submarine:...................36(0)0
Experimental submarine:..............9(0)0
Mini subs:...................................12(0)0
Floatplane carrier/tenders:..........2(0)0
Airship tenders:.........................2(0)0
Blimp carrier/tenders:................2(0)0
Destroyer depot ships:...............2(0)0
Submarine depot ships:.............4(0)2
Small craft depot ships:..............12(0)0
Multi purpose tenders:...............2(0)0
Repair ships:.............................2(0)0
Transports:...............................10(0)0
Icebreakers...............................2(0)0
Sub chasers:.............................288(0)0
Coastal Motor Torpedo Boats:.....240(0)0
Motor Gunboats:..........................200(0)0
Motor Torpedo Boats:................400(0)0
Motor Launchs:.........................220(0)0
Motor Launchs/minlayers:..........40(0)0
Landing Ship Infantry..................0(0)0
Landing ship Tank.......................7(0)0
Landing ship Dock ......................4(0)0
Landing Craft Infantry:................0(0)0 (reclassed as LCM type 1/2)
Landing Craft Infantry Fast:..........32(0)0
Landing Craft Vehicle Personel.....600(0)0
Landing Craft Mechanized..........690(0)15
landing Craft Tank.....................50(0)0
Infantry launches:......................38(0)0
Note: LCVP and LCM total's corrected as a result of inconsistant quarterly tally and reclasification of LCP to LCM