You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, April 10th 2020, 8:56pm

Kingdom of Greece Q1 1949

Industrial Allocation
0/15 factories producing 0t materials.
15/15 factories producing 1.5 infrastructure. (non-dedicated)
0/15 Factories producing infrastructure. (dedicated)
2,637t from stockpile.
Ot from transactions.
Ot from scraping.
2637t Total materials available
2264 Used
373t Stored



Infrastucture Development
Attica:
- 0.5 IP added to the upgrade of a Type 2 Slipe to a Type 2.5 at Attica. - 0.5 instaled, 0 remaining.
Thessaloniki:
- 0.5 IP added to the upgrade of a Type 0 Slipe to a Type 0.5 at Attica. 0.5 instaled, 0 remaining.
- 0.5 IP added to the upgrade of a Type 0 Slipe to a Type 0.5 at Attica. 0.5 instaled, 0 remaining.

Naval Construction
Attica:
Type 3 Dry-Dock #1 -
Type 3 Dry-Dock #1 -
Type 2 Drydock #1 - Ares Class Light Cruiser Ares; laid down April 1st, 1940. 2162,5 tons required. 491 tons added. In Q1/1949 for a total of 491/ 2162,5 tons. 1671/ 2162,5 tons remaining.
Type 2 Slipe #1 -
Type 2 Slip #2 - Tiriis Class Light Cruiser Tiriis; laid down january 15tht, 1949. 7425 tons required. 453 tons added. In Q1/1949 for a total of 453/7425 tons. 6972/7425 tons remaining. Launched July 1st, 1949. Completed April 1st, 1950.
Type 2 Slip #3 - Tiriis Class Light Cruiser Tetríreis; laid down january 15tht, 1949. 7425 tons required. 453 tons added. In Q1/1949 for a total of 453/7425 tons. 6972/7425 tons remaining. Launched July 1st, 1949. Completed April 1st, 1950.
Type 1 Slip #1 - Nemea Class destroyer Nemea; laid down january 1st, 1949. 2082 tons required. 188 tons added. In Q1/1949 for a total of 188/2082 tons. 1894/2082 tons remaining. Launched april 15th, 1949. Completed november 1st, 1949.
Type 0 Slipe #1 -
Type 0 Slipe #1 -

Dockside:

Paros:
Type 1 Dry-Dock #1 -
Type 0 Dry-Dock #1 -

Dockside:

Patra:
Type 1 Dry-Dock #1 -
Type 1 Slip #1 - Nemea Class destroyer Nemesis; laid down january 1st, 1949. 2082 tons required. 188 tons added. In Q1/1949 for a total of 188/2082 tons. 1894/2082 tons remaining. Launched april 15th, 1949. Completed november 1st, 1949.
Type 0 Dry-Dock #1 -

Dockside:

Salamis:
Type 1 Dry-Dock #1 -

Dockside:

Souda Bay:
Type 4 Dry-Dock #1 -
Type 3 Dry-Dock #1 -
Type 2 Slipe #1 -
Type 2 Drydock #1 - Ares Class Light Cruiser Apollo; laid down April 7th, 1941. 2162,5 tons required. 491 tons added. In Q1/1949 for a total of 491/ 2162,5 tons. 1671/ 2162,5 tons remaining.
Type 1.5 Dry-Dock #1 -
Type 1.5 Dry-Dock #1 -
Type 1.5 Dry-Dock #1 -

Dockside:

Thessaloniki:

Type 2 Dry-Dock #1 -
Type 0 Dry-Dock #1 -
Type 0 Slipe #1 -
Type 0 Slipe #1 -

Dockside:

Volos:
Type 1 Dry-Dock #1 -

Dockside:

Limassol:
Type 3 Dry-Dock #1 -
Type 1 Dry-Dock #1 -

Order of Battle (Greek Navy) Q1 1949

Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Fleet Combatants

Battleships 5(0)+0
Heavy Cruisers 4(0)+0
Medium Cruisers 2(0)+0
Light Cruisers 19(2)+2
Aircraft Carriers 1(0)+0
Flotilla Leaders 4(0)+0
Class "A" Destroyers 45(0)+2
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 17(0)+0
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 24(0)+0

Small Combatants
Subchasers (150t) 56(0)+0
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (200t) 30(0)+0
Harbour Launches (65t) 21(0)+0
Mtb 96(0)+0
Mgb 27(0)+0
Mms 22(0)+0

Auxiliaries
Special Transports 5(0)+0
Large Landing Craft (200t) 52(0)+0
Small Landing Craft (65t) 16(0)+0
Tenders 4(0)+0
Fleet Train 10(0)+0
Fleet Tugs 6(0)+0
Harbour Tugs 0(0)+0

Training Squadron

Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0


2

Friday, April 10th 2020, 8:58pm

I hope that everything is okay. Tell me if there is any errors.

3

Friday, April 10th 2020, 9:06pm

From what I can tell you have 6 destroyers building, using 243 tons each for a total of 1,458 tons used for ship building. The report states 2,422 tons used, either you missed some usage or simply missed changing the tally and the summary portion of the report.

4

Friday, April 10th 2020, 9:15pm

Oh god no. I have committed the most stupid mistake ever.
To save time aI copy the Namea's text and then I would change it. Guess where I have failed

5

Friday, April 10th 2020, 10:00pm

Okay. Every thing should be fixed now.

6

Saturday, April 11th 2020, 7:00am

No worries, I have had cut and paste errors in many of my reports. I spend more time re rereading and editing my reports than making them!