Regarding the repairs in Formosa. Just put it in one report with the dates finished behind the ships rather than spreading it over two reports:
Formosa’s Naval Developments – Q3/1922
A. Industrial Allocation
4/4 factories producing warship material = 4,000 t. No stockpiled materials available. 4,000 t are used, no materials stockpiled.
0/4 factories are dedicated to producing infrastructure material, = 0 pts.
B. Infrastructure Development
Factory V at 1.8 points. No points received this quarter
C. Naval Construction
Kaoshiun
D0: idle
D0: idle
Minor repairs to Yura; receives 746 tons; finished October 1, 1922
Minor repairs to Asanagi; receives 149 tons; finished September 10, 1922
Tahei
D0: idle
D1: repairs to Nadakaze; receives 399 tons; finished November 1, 1922
D2: idle
Minor repairs to Fuso; receives 2706 tons; finished November 20, 1922
D. Transactions
none.
E. Other Notes
Repairs on damaged ships from the IJN began on August 1
Ship damage:
Fuso at 91%; Requires 2706 tons and 3.5 months
Yura at 89%; Requires 746 tons and 1.8 months
Nadakaze at 74%; Requires 399 tons and 2.9 months
Asanagi at 90%; Requires 149 tons and 1.1 months
F. Updated Order of Battle, 30/9/22
Note:
Y)+Z = completed (under repair/refit) + under construction
Coast Defense Battleship: 1 (0) + 0
1st class Cruiser: 1 (0) + 0
2nd class Cruiser: 1 (0) + 0
Protected Cruiser: 3 (0) + 0
Gunboats: 2 (0) + 0
Destroyers 2nd class: 2 (0) + 0
Destroyers 3rd class: 3 (0) + 0
TPB 1st class: 5 (0) + 0
TPB 2nd class: 7 (0) + 0