Since it was pointed out to me that the destroyer I bought was a bit too tall to fit under the bridges on the canal (at least for now) I am redoing this...
Whups.
Industrial Allocation
- 1/1 factories producing 500t materials, 500 tons used; 0.05 IP produced.
Infrastructure Development
.05 IP delivered for new Type 0 slip at Alat
Naval Construction
at Lankaran:
1 Type 0 drydock - RGB-2
Aras and MTL-5
Tovuz laid down concurrently; 50 tons to
Tovuz and 48 tons to
Aras to complete.
at Alat:
1 Type 0 slip - MTL-6
Mingacevir and MTL-7
Naftalan laid down concurrently; 50 tons to
Naftalan and 50 tons to
Mingacevir to complete.
1 Type 0 slip - under construction. .05 IP used, .35 IP remaining.
From factory: MTL-8
Yevlakh receives 50 tons, launched from factory slip
On Sea Trials
MTL-2
Ganja
MTL-3
Salyan
MTL-4
Agdam
RGB-1
Kur
MGB-1
Arablinski - Finishes trials on 03/01/36.
MGB-2
Shikhlinski - Finishes trials on 03/01/36.
Transactions
252 tons to Atlantis for construction of MSW-26-class minesweeper, named Karabakh.
Other Notes
N/A
Order of Battle (Azerbaijan)
Torpedo boats:..................1(0)0
Gunboats:.........................2(0)0
Riverine Gunboats:.............2(0)1
MTB's:..............................6(0)0
Motor Launch:...................4(0)4
Mine sweepers:.................0(0)1
Auxillaries:........................0(0)0