You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, December 5th 2005, 7:44pm

Poland Q2,1929

Poland Q1,1929

A. Industrial Allocation

Factory Allocation:

Warship Material:
Infrastructure (Committed): 1
Infrastructure (Non-committed): 0

Warship Material Produced: 3000 t
Stockpile: 2482 t
Recycled Scrap: 0 t
Material Used on Construction: 1000 t
New Stockpile: 482 t

B. Infrastructure Development

0.2 pts, for bilding factory 5

C. Naval Construction

at Danzig:
1 Type 2 slip Bilding Conrad class CL 1000t used
2 Type 1 slips Idle
2 Type 0 slips Idle
1 Type 1 drydock Idle
at Koszalin
1 Type 1 slip Idle
2 Type 0 slips Idle
1 Type 2 drydock idle
2 Type 0 drydocks idle


4000t send to germany as a payment for 2 deutchland class BB