Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, January 15th 2009, 11:04pm

Nordmark q1/1937

A) Industry

21 factories (non fixed) producing 21000tons of ship materials. Plus stockpile of 3863tons. 4464tons received from Germany. 4000tons received from Chile for BC Den Norske Love
2 factories (fixed) producing 0.2IP for Q1/1937


B) Infrastructure Development
Trondheim Type 1 Dock #1 extending to type 1 Dock #2, 0.5IP needed, 0.2IP added.

C) Ship Construction

Karlskrona
Type 4 Slip #1: X37 Class CV, X37-1 laid down, 20000t needed, 2000t added.
Type 3 Dock #1: Gåssen Class CV, Gåssen starting reconstruction, 7223t needed, 1223t added.
Type 3 Dock #2: idle
Type 3 Slip #1: Falun Class CA, Falun laid down, 15000t needed, 2000t added.
Type 3 Slip #2: Victoriahamn Class CL, Victoriahamn laid down, 9150t needed, 1150t added.
Type 1 Dock #1: idle
Type 1 Dock #2: idle
Type 1 Slip #1: idle
Type 1 Slip #2: idle
Type 0 Slip #1: idle
Type 0 Slip #2: idle


Free Floating:
BB33-A, Oscar II building, 2000tons needed, 2000tons added. Completed
German CV Peter Strasser building, 8931t needed, 2232t added.
DD35-24 building, 500t needed, 500t added. Completed.
Trawler refitting to T31 standards as T31-25, 90t needed, 90t added
Trawler refitting to T31 standards as T31-26, 90t needed, 90t added
Trawler refitting to T31 standards as T31-27, 90t needed, 90t added
Trawler refitting to T31 standards as T31-28, 90t needed, 90t added
Trawler refitting to T31 standards as T31-29, 90t needed, 90t added
Trawler refitting to T31 standards as T31-30, 90t needed, 90t added
Trawler refitting to T31 standards as T31-31, 90t needed, 90t added
Trawler refitting to T31 standards as T31-32, 90t needed, 90t added

Helsingfors Örlovsvarv
Type 3 Slip #1: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 1 Slip #2: idle
Type 0 Slip #1: idle

Free Floating:
DD35-21 building, 500t needed, 500t added. Completed.
DD35-22 building, 500t needed, 500t added. Completed.

Gustavsvern Naval Base, Trondheim
Type 4 Dock #1: Oden Class BB continuing 25% refit, 4000t needed, 2000t added.
Type 4 Slip #1: idle
Type 3 Dock #1: idle
Type 3 Slip #1: Victoriahamn Class CL, Göta laid down, 9150t needed, 1150t added.
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 1 Slip #2: idle
Type 0 Dock #1: extending
Type 0 Dock #2: idle
Type 0 Slip #1: idle
Type 0 Slip #2: idle



Free Floating:
BB33-B, Suomen Leijona building, 6000tons needed, 2000tons added.
German CV Graf Zeppelin building, 13395t needed, 2232t added.
DD35-19 building, 500t needed, 500t added. Completed.
DD35-20 building, 500t needed, 500t added. Completed.

Karljohansvern Naval Base, Horten outside Oslo
Type 3 Slip #1: idle
Type 1 Slip #1: idle


Freefloating:
DD35-23 building, 500t needed, 500t added. Completed.

Oscarsvern Naval Base, Leivsborg
Type 4 Dock #1: Dristigheten Class BC, Manligheten starting reconstruction, 16140t needed, 1140t added.
Type 4 Slip #1: idle
Type 3 Slip #1: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 1 Slip #2: idle
Type 0 Slip #1: idle
Type 0 Slip #2: idle

Free Floating:
BB33-C, Eric den Helige building, 8000tons needed, 2000tons added.
DD35-17 building, 500t needed, 500t added. Completed.
DD35-18 building, 500t needed, 500t added. Completed.

Iceland Naval Station
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 0 Slip #1: idle

Free Floating:

Faeroes Naval Station
Type 0 Dock #1: idle

Åland Naval Base
Type 3 Dock #1: idle
Type 1 Dock #1: idle
Type 0 Dock #1: idle

South Georgia Naval Base
Type 0 Dock #1: idle

D) Transactions

E) Other Notes

DD35 9 to 16 on trials
BC Dristigheten on trials
DD35 17 to 24 starting trials
BB Oscar II starting trials

F) Updated Order of Battle, 1/1/37

Note: X(Y) +Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 2(1)3
BC: 4(0)0
CV: 3(1)1
CA: 4(0)1
CL: 35(0)2
DD: 82(0)8
Motor Torpedo Boats: 120(0)0
Torpedo boats: 32(0)0
Subs type (a): 18(0)0
Subs type (b): 16(0)0
Sloops/Frigates: 132(8)0
CDBB: 4(0)0
Auxiliaries 16(0)0
Landing Craft 50(0)0
Target ships 1(0)0

New stockpile of 8703tons

I think its all correct