[SIZE=5]AZERBAIJAN[/SIZE]
[SIZE=4]Industrial Allocation [/SIZE]
- 1/1 factories producing 1,000 tons materials, 387 tons remaining from Q4/36, 1,387 tons available, 663 tons used; 774 tons left over for Q2/37.
[SIZE=4]Infrastructure Development[/SIZE]
- N/A
[SIZE=4]Naval Construction [/SIZE]
at Lankaran:
1 Type 0 drydock - TGB Yezidabad Castle laid down October 01/36, launched January 28/37, 221 tons added in Q1, 9.718 months to complete, 276 tons remaining until completion.
at Alat:
1 Type 0 slip - TGB Cirax Qala laid down October 01/36, launched January 28/37, 221 tons added in Q1, 9.718 months to complete, 276 tons remaining until completion.
1 Type 0 slip - TGB Parigala laid down October 01/36, launched January 28/37, 221 tons added in Q1, 9.718 months to complete, 276 tons remaining until completion.
Dockside:
Yezidabad Castle, Cirax Qala, and Parigala moved to dockside after January 28th.
From Factory:
None
On Sea Trials
- Minesweeper Karabakh on sea trials until mid-Q2/37
[SIZE=4]Transactions[/SIZE]
N/A
[SIZE=4]Notes[/SIZE]
Construction continues on Yezidabad Castle-class torpedo boats.
[SIZE=4]Order of Battle (Azerbaijan)[/SIZE]
Torpedo boats:..................5(0)3
Gunboats:.........................2(0)0
Riverine Gunboats:.............4(0)0
MTB's:..............................12(0)0
Motor Launch:...................14(0)0
Mine sweepers:.................1(0)0
Auxillaries:........................0(0)0
This post has been edited 1 times, last edit by "Brockpaine" (Jan 3rd 2009, 3:07am)