Columbia
A. Industrial Allocation
2/4 factories (non fixed) to naval materials: 2,000 tons created for Q4/1933 + 265 tons stockpiled from Q3/33
Total warship materials: 2,265
2,005 tons used for ship building, 260 tons stockpiled for next quarter.
1/4 factory's (fixed) to infrastructure development: 0.1 points for Q4/1933, plus 0.1 bonus IP's
1/4 factory's (non fixed) to infrastructure development: 0.1 points for Q4/1933
0.5 IP's recieved from Atlantis in Q4/1933
Total: 0.8 infrastructure points created for Q4/33 .
B. Infrastructure Development
0.5 points used for upgrade of Type 2 drydock to Type 3 at Cartagena (0.5 IP's)
0.3 points added to new type 3 slip at Cartagena
C. Naval Construction
Cartagena:
Class 3 Slip #1 - begins construction, 3.0 points needed, 0.3 points added
Class 2 Slip #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - 611 type MGB #11 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - 611 type MGB #12 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - Idle
Class 0 Slip #4 - completed
Class 2 Drydock #1 - upgrading to type 3, 1.0 points needed, 0.5 points used, 0.5 points added
Class 1 Drydock #1 - Idle
MGB-6 and MGB-7 completed, begin trials
at Buenaaventura:
Class 2 Slip #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - 611 type MGB # 14 laid down, 177 tons needed, 177 tons added
Class 0 Slip #2 - 611 type MGB # 15 laid down, 177 tons needed, 177 tons added
Class 0 Slip #3 - 611 type MGB # 16 laid down, 177 tons needed, 177 tons added
Class 0 Slip #4 - Idle
Class 3 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
MGB's 8 through 10 completed, begin trials
Launched ships being completed:
None
Ships completed/transfered and on trials
5x611 type MGB's
Building summary
5x611 type MGB's laid down (885 tons)
D. Transactions
0.5 IP's recieved from Atlantis
1,000 tons transfered to Atlantis transfered for 2 J class DD's
120 tons transfered to Atlantis for 20 coastal motor boats.
E. Other Notes
Armoured cruisers Cali and Medellin taken out of service to provide crews for Atlantean CL's
4 J class DD's ordered, 2 to be built in Atlantis, 2 in Colombia.
F. Miscellaneous Works
None.
F. Updated Order of Battle, 10/1/33
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships:................................0(0)0
Pre dreadnoughts:.......................2(0)0
Armoured Cruisers:.....................2(0)0
Light Cruisers.............................2(0)1 Destroyers:.................................8(0)2 * In Atlantis
Torpedo boats:............................5(0)0
escorts:......................................0(0)0
Gunboats:..................................6(0)0
River Gunboats...........................2(0)0
Submarines:...............................0(0)0
Patrol vessels:............................1(0)0 Armed Tug Jose Felix Ribas
Mine warfare ships:.....................0(0)0
Sub chasers:.............................0(0)0
Motor Gun Boats:......................10(0)5
Motor Launches:........................5(0)0
Motor Torpedo boats:.................40(0)0
Coastal Motor Torpedo Boats:....20(0)0 * purchased from Atlantis
Depot ships:..............................0(0)0
Auxillary's:................................0(0)0