German Naval Developments – Q2/27
A. Industrial Allocation
Factory Allocation:
Warship Material: 2
Infrastructure (Committed): 21 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 1
Warship Material Produced: 2,000 t
Stockpile: 1,090 t
Recycled Scrap: 120 t
Material Used on Construction: 2336 t
New Stockpile: 754 t
B. Infrastructure Development
The Type 3 drydock at Kiel receives .2 pts, for 2.4 total.
Factory 25 receives 1 point, for 2 total.
Factory 26 receives 1 point, for 2 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-213 receives 214 t, completed 21/5/27
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Scrapping G-145
1 Type 0 slip: Idle
At Cuxhaven
1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: CL Kiel (ex-Ersatz Nymphe) receives 842 t, completed 19/5/27
At Kiel
1 Type 3 slipway: Idle
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: CL Ersatz Thetis receives 1400t
D. Transactions
DD G-145 scrapped at Bremerhaven, 120 t to be available for Q1/28
CL Medusa scrapped at Wilhelmshaven, 426 t to be available for Q1/28
E. Other Notes
CL Breslau, DD Z-211 complete shake-down cruise
Z-212 continues shake-down cruise
CL Kiel, DD Z-213 begin shake-down cruise
New Orders: None
F. Updated Order of Battle, 30/6/27
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 11(0)+1,.
DD: 24(0)+0, with G-145 deleted, to be scrapped Q2/27.
SL: 6(0)+0
AM: 10(0)+0
Note: PD = pre-dreadnought