German Naval Developments - Q2/25
A. Industrial Allocation
4/11 factories produce 4000 t of warship materials, with a stockpile of 1,832 t for a total of 5,832 t. Of this, 3,102 t are used for construction programs. A stockpile of 2,730 t is carried over.
(Note that the stockpile listed in the Q1/25 report was incorrect...)
7/11 factories are committed to manufacturing naval infrastructure materials, producing 0.7 pts.
B. Infrastructure Development
Factory 12 receives 0.7 pts, for a total of 9.6 pts.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: AM R-9 receives 105 t, completing construction 30/4/25
At Bremerhaven
1 Type 2 slip: DD Z-207 receives 426 t, launches 15/5/25
1 Type 1 slip:
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: DD Z-205 receives 214 t, completed 15/5/25
Free-floating: AM R-10 receives 105 t, completed 30/4/25
At Cuxhaven
1 Type 3 slip: CL Ersatz Arcona receives 1400 t
1 Type 3 drydock: Idle
1 Type 2 slip:
1 Type 1 slip:
1 Type 0 slip: Idle
Free-floating:
At Kiel
1 Type 2 slipway:1 Type 2 drydock: Idle
1 Type 1 slip: DD Z-208 laid down 1/4/25, receives 426 t
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-206 receives 426 t
D. Transactions
DD V-2 begins scrapping 1/4/25 at Bremerhaven
DD V-3 begins scrapping 1/4/25 at Kiel
E. Other Notes
DD Z-203, minesweeper R-7 complete shake-down cruise.
DD Z-204, minesweeper R-8 continue shake-down cruises.
DD Z-205, minesweepers R-9 and R-10 begin shakedown cruises.
New Orders: 1 destroyer.
F. Updated Order of Battle, 30/6/25
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 12(0)+1
DD: 24(0)+3, 2 other deleted for scrapping
SL: 6(0)+0
AM: 10(0)+0
Note: PD = pre-dreadnought