German Naval Developments - Q3/26
A. Industrial Allocation
Factory Allocation:
Warship Material: 5
Infrastructure (Committed): 7
Infrastructure (Non-committed): 0
Warship Material Produced: 5,000 t
Stockpile: 1,516 t
Recycled Scrap: 196 t
Material Used on Construction: 5,692 t
New Stockpile: 1,020 t
B. Infrastructure Development
The Type 3 drydock at Kiel receives 0.5 pts, for 0.7 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: DD Z-213 laid down 1/7/26, receives 426 t
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-211 receives 426 t
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: DD Z-212 receives 426 t, launched 15/8/26
1 Type 1 drydock: Scrapping S-140
1 Type 0 slip: Idle
At Cuxhaven
1 Type 3 slip: CL Ersatz Nymphe receives 1400 t, launched 31/7/26
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip: CL Arcona scrapped
1 Type 0 slip: Idle
Free-floating: CL Ersatz Niobe receives 1400 t
At Kiel
1 Type 3 slipway: CL Ersatz Thetis laid down 1/7/26, receives 1400 t
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: DD Z-210 receives 214 t, completed 15/8/26
D. Transactions
DD S-140 scrapped at Bremerhaven, 120 t to be available for Q2/27
CL Arcona scrapped at Cuxhaven, 426 t to be available for Q2/27
E. Other Notes
DD Z-208 completes shake-down cruise.
CL Koln, DD Z-209 continues shake-down cruise
DD Z-210 commences shake-down cruise
New Orders: 1 light cruiser, 1 destroyer.
F. Updated Order of Battle, 31/9/26
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 12(0)+3, with Arcona sent to the breakers.
DD: 24(0)+3, with S-140 sent to the breakers.
SL: 6(0)+0
AM: 10(0)+0
Note: PD = pre-dreadnought