[SIZE=3]Industrial Allocation[/SIZE]
- 3/9 factories (worn) producing 2,700t materials, 600 tons from stockpile; 460 tons from scrapping: total, 3,760 tons
- 463 tons from scrapping of AC OHiggins in recycling until Q1 1936.
1448 tons used, 2312 tons stockpiled for Q1/36.
[SIZE=3]Industrial Account[/SIZE]
[SIZE=1]Note: this is necessary to show as Chile's factories are partly worn, partly repaired.[/SIZE]
Factory 1 - Full (100%) (Committed to IP)
Factory 2 - Worn (90%), .4 IP to repair (Committed to IP)
Factory 3 - Worn (90%), .5 IP to repair (Committed to IP)
Factory 4 - Worn (90%), .5 IP to repair (Non- Committed to IP)
Factory 5 - Worn (90%), .5 IP to repair (Non- Committed to IP)
Factory 6 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 7 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 8 - Worn (90%), .5 IP to repair (Building tonnage)
Factory 9 - Full Production (Non- Committed to IP) (Factory was completed earlier in 1935, and is not worn from war production.)
[SIZE=3]Infrastructure Development[/SIZE]
- 2/9 factories (worn) committed to Infrastructure (0.18 IP + .18 IP for Q4)
- 1/9 factories (repaired) committed to Infrastructure (0.1 IP + .1 IP for Q4)
- 1/9 factories (repaired) non-committed to Infrastructure (0.1 IP)
- 2/9 factories (worn) non-committed to Infrastructure (0.18 IP)
TOTAL: .84 IP available.
0.4 IP added to Factory #2 to fix (joins 0.1 IP from Q3).
0.44 IP added to Factory #3 to fix, .06 IP remaining until completion.
[SIZE=3]Naval Construction[/SIZE]
at Talcahuano:
D3: Rebuilding of Battlecruiser Valparaiso (ex-Folkunga Leon) - 308 tons delivered. Rebuilding is complete and Valparaiso makes a shakedown cruise.
S3: idle
D2: idle
D2: idle
S2: idle
S1: idle
D0: Dragaminas Type-1935 minesweeper DM-1 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q4/1935; 140 tons remaining until completion (on February 12th, 1936)
at Valparaiso:
S1: Dragaminas Type-1935 minesweeper DM-2 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q4/1935; 140 tons remaining until completion (on February 12th, 1936)
S1: idle
D1: idle
at Mejillones:
S0: Dragaminas Type-1935 minesweeper DM-3 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q4/1935; 140 tons remaining until completion (on February 12th, 1936)
S0: Dragaminas Type-1935 minesweeper DM-1 laid down. 425 tons and 4.425 months required to complete. 285 tons added in Q4/1935; 140 tons remaining until completion (on February 12th, 1936)
D0: idle
from factories:
N/A
[SIZE=3]Transactions[/SIZE]
None
[SIZE=3]Other Notes[/SIZE]
N/A
Order of Battle (Armada de Chile) end of Q4 1935[/SIZE]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Dreadnought Battleships............2(0)+0
Dreadnought Battlecruisers........1(0)+0
Predreadnoughts......................2(0)+0
Coast Defense Ships.................1(0)+0
Aircraft Carrier.........................1(0)+0
Armoured Cruisers....................3(0)+0
Heavy Cruiser...........................2(0)+0
Light Cruisers...........................7(0)+0
Protected Cruisers....................2(0)+0
Floatplane Cruisers...................1(0)+0
Destroyers..............................15(0)+0 {1,200 tons std and up}
Light Destroyers.......................6(0)+0 {under 1,200 tons std}
Submarines.............................8(0)+0
Floatplane Carriers...................2(0)+0
Subchasers.............................24(0)+0
Minesweepers.........................0(0)+4
Tenders.................................2(0)+0
Colliers...................................2(0)+0
Sail Training Sloop...................1(0)+0
Transports..............................2(0)+0
-Emergency Use-
Patrol Boats..........................11(0)+0
Transports............................12(0)+0
Museum Ships.......................1(0)+0
This should all be correct... will make corrections as necessary, though.