You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, January 21st 2005, 10:12pm

Denmark, Quarter 1, 1925

Danish Naval Developments Q1 1925

a/ Industrial Allocation
6/10 factories producing materiel for shipbuilding =6000 tons
4/10 factories (fixed) producing infrastructure materiel =0.4 points
0/10 factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Factory no. 11 continuing construction, receives 0.4 points = Total 1.7 points

c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Freya, CA, laid down 02/01/24, receives 1768 tons, balance 4065 tons
No.2 type 2 slip – Lolland, CL, laid down 02/04/24, receives 1334 tons, balance 1868 tons
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.1 type 2 drydock - Idle
Dock side –


Aarhus-
No.1 type 3 slip –Idle
No.2 type 2 slip –Idle
No.3 type 1 slip – UD 1, Sub, laid down 02/04/24, receives 302 tons, balance 24 tons
No.4 type 1 slip – UD 2, Sub, laid down 02/04/24, receives 302 tons, balance 24 tons
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
Dock side –

Aalborg-
No.1 type 1 slip – Idle
No.2 type 1 slip – Idle
No.3 type 0 slip - Idle
No.4 type 0 slip - Idle
Dock side –

Bangkok-
No.1 type 1 slip – Idle
No.2 type 0 slip – Idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side –


d/ Transactions
D14 – Transferred to Yugoslav Navy
D16 – Transferred to Yugoslav Navy
F1 – Transferred to Yugoslav Navy
F2 – Transferred to Yugoslav Navy

Tegetthoff Transferred from Yugoslav Navy

e/ Other Notes
All new orders CANCELLED, current projects allowed to complete.


KDM Hel continues sea trials until 18/04/25
KDM Ask continues sea trials until 24/04/25
KDM Asp continues sea trials until 24/04/25
KDM Puma continues sea trials until 23/05/25
KDM Moskito commissions on 15/01/25

Repairs to the following ships:-
D10 – 0 tons, re-enters service 02/02/25
D11 – 25 tons, re-enters service 27/02/25
Bornholm – 1081 tons, completes repairs on 14/03/25

Re-Fits to the following ships:-
D13 – 390 tons, completes re-fit 07/01/25, re-enters service 02/03/25

Tonnage Carried Over From This Quarter = 809

f/ Order of Battle
Note: X(Y)+Z = completed (under repair/refit) + building/on order (breaking)

PD = 00 (0) + 0/0 (0)
AC = 02 (0) + 0/0 (0)
CDS = 03 (0) + 0/0 (0)
CA = 00 (0) + 2/0 (0)
CL = 11 (1) + 1/0 (0)
DD = 17 (3) + 1/0 (0)
FR = 00 (0) + 0/0 (0)
SL = 03 (0) + 0/0 (0)
GB = 03 (0) + 0/0 (0)
TB = 20 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 11 (0) + 2/0 (0)
MWS = 07 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: PD = Pre-Dreadnought
FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)