You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, November 22nd 2013, 11:34pm

Republic of Italy Q2/44

Italian Naval Construction Summary: 1944 Q2

Patria e Onore


Factories: Italy
25 Total factories.
25 Factories dedicated to production of 25,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP. 0 bonus IP for factory dedication.

Factories: East African State
2 Total factories.
2 Factories dedicated to production of 2,000 tons of Naval material.
0 factories (designated) dedicated to the production of IP for a total of 0IP.

Material Transactions:
174t rolled over from Q4/43
2000t from the East African State to Italy

27174 tons available for use

Naval Construction and Refit Report
Italy

OTO La Spezia
- Type 3 Slipway: Destroyer Biagio Assereto receives 675t. 1350t of 2700t assembled. 1350t required, launched Q2/44 and estimated completion Q4/44.
- Type 3 Slipway: Destroyer Benedetto I Zaccaria receives 675t. 1350t of 2700t assembled. 1350t required, launched Q2/44 and estimated completion Q4/44.
- Type 3 Drydock: Aircraft Carrier Aquila drydocked for reconstruction: receives 2005t. 12011t of 12011t assembled. 0t required, completed. Trials begin Q3/44.
- Type 3 Drydock: Cruiser San Pietro drydocked for reconstruction: receives 1665t. 3330t of 6660t assembled. 3330t required, estimated refloating and estimated completion Q4/44.
- Type 1 Slipway
- Type 1.5 Drydock

Dockside:

Orlando Taranto
- Type 4 Slipway: Battleship Dante Alighieri receives 3000t. 21000t of 45,275t assembled. 24275t required, estimated launch Q4/44 and estimated completion Q3/46.
- Type 4 Drydock
- Type 3 Slipway: Destroyer Guglielmo Grasso receives 675t. 1350t of 2700t assembled. 1350t required, launched Q2/44 and estimated completion Q4/44.
- Type 3 Drydock
- Type 3 Drydock
- Type 1 Slipway
- Type 1.5 Drydock:

Dockside:

Napoli di Castellammare
- Type 3 Slipway: Destroyer Simone Doria receives 675t. 1350t of 2700t assembled. 1350t required, launched Q2/44 and estimated completion Q4/44.
- Type 3 Drydock: Aircraft Carrier Europa drydocked for reconstruction: receives 2001t. 2001t of 12011t assembled. 10010t required, estimated refloating and estimated completion Q3/45.
- Type 1 Slipway
- Type 1.5 Drydock

Dockside:
-Cruiser Sardinia receives 1625t. 9750t of 9750t assembled. 0t required, completed. Trials begin Q3/44.

Marghera Fincantieri, Venezia
- Type 3 Slipway: Destroyer Carlo Zeno receives 675t. 1350t of 2700t assembled. 1350t required, launched Q2/44 and estimated completion Q4/44.
- Type 3 Slipway: Destroyer Lamba Doria receives 675t. 1350t of 2700t assembled. 1350t required, launched Q2/44 and estimated completion Q4/44.
- Type 3 Drydock:
- Type 1 Slipway
- Type 1 Drydock

Dockside:
-Cruiser Sicily receives 1625t. 9750t of 9750t assembled. 0t required, completed. Trials begin Q3/44.

CRDA Trieste
-Type 4 slipway:
-Type 4 slipway:

Dockside:
-Armored Cruiser Regina Elena receives 3000t. 30000t of 30000t assembled. 3000t required, completed. Trials begin Q3/44.
-Battleship Leonardo da Vinci receives 3000t. 30000t of 45,275t assembled. 18275t required, estimated completion Q4/45.

Messina di Castellammare
- Type 4 Drydock
- Type 3 Slipway: Destroyer Agostino Barbarigo layed down, receives 675t. 675t of 2700t assembled. 2025t requiered, estimated launch Q3/44 and estimated completion Q1/45.
- Type 3 Slipway: Destroyer Andrea Dandolo layed down, receives 675t. 675t of 2700t assembled. 2025t requiered, estimated launch Q3/44 and estimated completion Q1/45.
- Type 3 Drydock: Cruiser San Sylvestro drydocked for reconstruction: receives 1665t. 3330t of 6660t assembled. 3330t required, estimated refloating and estimated completion Q4/44.
- Type 1 Slipway

Dockside:

Fincantieri Cagliari
- Type 3 Drydock: Cruiser San Gregorio Magno drydocked for reconstruction: receives 1665t. 3330t of 6660t assembled. 3330t required, estimated refloating and estimated completion Q4/44.
- Type 1 Drydock

Dockside:


East African State


Massawa
- Type 4 Drydock
- Type 1 Slipway
- Type 1 Drydock

Dockside:

Mogadishu
-Type 1 Drydock

Scraping Report
No ships scraped

Ships on Trials
Aircraft Carriers: Giovanni Bausan, Marcantonio Colona

Current Order of Battle: Italian Navy
BB. 7(0)+2
CV. 13(1)+0
ACR. 10(3)+0
CL. 19(0)+0
AV. 1(0)+0
DD. 57(0)+8
Submarines. 105(0)+0
Escorts. 93(0)+0
MAS. 323(0)+0
Mine Warfare. 19(0)+0
Auxiliary. 95(0)+0

Current Order of Battle: East African State Navy
1(0)+0 Cruisers
2(0)+0 Coastal Defense ships
1(0)+0 Submarine
20(0)+0 MAS

Infrastructure Projects

Summary of Expenditures
26652t out of 27174t used in Naval construction.
0t out of 27859t used in payments.
0 IP used in Infrastructure Projects
26652t expended Q2/44.
522t rollover to Q3/44.
You smug-faced crowds with kindling eye
Who cheer when soldier lads march by,
Sneak home and pray you'll never know
The hell where youth and laughter go.
-Siegfried Sassoon