You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, August 1st 2013, 2:32am

Kingdom of Greece Q3 1943

[SIZE=5]Q3 1943[/size]

[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 2,172t from Stockpile
- 0t in from Transactions
- 0t out in Transactions
- 0t in from Scrap
- 12,172t Total materials available
- 12,172t used
- 0t stored for Q4/1943

[size=3]Infrastructure Development[/size]
Souda Bay:
- 0.5 IP (dedicated) added to construct Type 3 Drydock at Souda Bay. 0.5 IP remaining.

[SIZE=3]Naval Construction[/SIZE]

Attica:
D3: - AC-9 Thermopylae begins Major Refit on July 2nd, 1943. 7,120 tons required; 1564 / 7120 added Q3/43 for a total 1564 / 7120. 5,556 tons remaining.
D3: Idle
D2: Idle
S2: Idle
S2: Idle
S2: Idle
S1: Idle
S0: Idle
S0: Idle

Dockside:
- C-40 Artemis laid down October 4th, 1941. 15,000 tons required; 1875 / 15000 added Q3/43 for a total 15000 / 15000. 0 tons remaining. Ship launched July 22nd, 1942. Completes October 6th, 1943.
- C-43 Hephaestus laid down July 2nd, 1942. 9,000 tons required; 1575 / 9000 added Q3/43 for a total 7425 / 9000. 1,575 tons remaining. Ship launched February 8th, 1943.
- C-44 Dionysis laid down July 1st, 1942. 9,000 tons required; 1575 / 9000 added Q3/43 for a total 7425 / 9000. 1,575 tons remaining. Ship launched February 8th, 1943.
- C-45 Hera laid down July 3rd, 1942. 9,000 tons required; 1575 / 9000 added Q3/43 for a total 7425 / 9000. 1,575 tons remaining. Ship launched February 8th, 1943.
- C-41 Geryon ex-Chapra Construction resumes July 1st, 1942. 10,183 tons required; 1504 / 10183 added Q3/43 for a total 7175 / 10183. 3,008 tons remaining. Ship launched June 13th, 1943.

Paros:
D1: Idle
D0: Idle

Dockside:

Patra:
D1: Idle
S1: Idle
D0: Idle

Dockside:

Salamis:
D1: Idle

Dockside:

Souda Bay:
D4: Idle
D3: - Under construction. Began April 1st, 1942. 4.0 IP required; 0.5 / 4.0 added in Q3/43 for a total of 3.5 / 4.0. 0.5 IP remaining.
S2: Idle
D2: Idle
D1.5: Idle
D1.5: Idle
D1.5: Idle

Dockside:

Thessaloniki:
D0: Idle
S0: Idle
S0: Idle

Dockside:

Volos:
D1: Idle

Dockside:

Limassol:
D3: Idle
D1: Idle

Dockside:
- C-42 Typhon ex-Chiplun Construction resumes July 1st, 1942. 10,183 tons required; 1504 / 10183 added Q3/43 for a total 7175 / 10183. 3,008 tons remaining. Ship launched June 13th, 1943.

From factories:
- CML-11 ML200 class 200t Coastal Minelayer
- CML-12 ML200 class 200t Coastal Minelayer
- CML-13 ML200 class 200t Coastal Minelayer
- CML-14 ML200 class 200t Coastal Minelayer
- CML-15 ML200 class 200t Coastal Minelayer

On Trials:
- Fleet Tug Boat T4201 Begins Trials January 26th, 1943. Completes trials July 30th, 1943.
- Fleet Tug Boat T4202 Begins Trials January 26th, 1943. Completes trials July 30th, 1943.
- Fleet Tug Boat T4203 Begins Trials January 26th, 1943. Completes trials July 30th, 1943.
- D-99 Ithaki Begins Post Refit trials May 25th, 1943. Completes trials August 30th, 1943.
- D-100 Kefalonia Begins Post Refit trials May 25th, 1943. Completes trials August 30th, 1943.
- D-101 Zakynthos Begins Post Refit trials May 25th, 1943. Completes trials August 30th, 1943.
- D-102 Kythira Begins Post Refit trials May 25th, 1943. Completes trials August 30th, 1943.
- Fleet Support Tanker Apollonis Begins Trials March 20th, 1943. Completes trials September 22nd, 1943.
- Fleet Support Tanker Cephisso Begins Trials March 20th, 1943. Completes trials September 22nd, 1943.

[size=3]Transactions[/size]

[size=3]Other Notes[/size]

[size=3]Order of Battle (Greek Navy) Q1 1943[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)

Fleet Combatants
Battleships 5(0)+0
Heavy Cruisers 3(0)+3
Medium Cruisers 2(0)+0
Light Cruisers 16(0)+3
Aircraft Carriers 1(1)+0
Flotilla Leaders 4(0)+0
Class "A" Destroyers 45(0)+0
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 17(0)+0
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 12(0)+0

Small Combatants
Subchasers (150t) 56(0)+0
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (165t) 10(0)+5
Harbour Launches (65t) 21(0)+0
MTB 96(0)+0
MGB 27(0)+0
MMS 22(0)+0

Auxiliaries
Special transports 5(0)+0
Large Landing Craft (200t) 52(0)+0
Small Landing Craft (65t) 16(0)+0
Tenders 4(0)+0
Fleet Train 8(0)+0
Fleet Tugs 3(0)+0
Harbour Tugs 0(0)+0

Training Squadron
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0