Iberian Naval Developments Q1 1928
a/ Industrial Allocation
17/22 factories producing materiel for shipbuilding =17000 tons
5/22 factories (fixed) producing infrastructure materiel =0.5 points
0/22 factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Factory no. 23 commences construction, receiving 0.5 points = Total 0.6points
c/ Naval Construction
Cadiz-
No.1 type 5 slip – Idle
No.2 type 4 slip – D127, D128, DD, laid down 02/01/28, each receive 399 tons, balance 1141 tons each
No.3 type 3 slip – Idle
No.4 type 2 slip – A13, A14, A15, Subs, laid down 02/01/1928, each receive 276 tons, balance 174 tons each
No.5 type 2 slip – A16, A17, A18, Subs, laid down 02/01/1928, each receive 276 tons, balance 174 tons each
No.6 type 2 slip – Idle
No.1 type 4 drydock – El Cunctador, CL, rebuilding from 15/06/27
No.2 type 3 drydock – Idle
Dock side – Salvador, CL, re-fitting
Dock side – Liberia, CL, re-fitting
Barreiro-
No.1 type 4 slip – D129, D130, DD, laid down 02/01/28, each receive 399 tons, balance 1141 tons each
No.2 type 3 slip – Idle
No.3 type 3 slip – D123, DD, laid down 02/01/1928, receives 480 tons to complete
No.4 type 1 slip – D124, DD, laid down 02/01/1928, receives 480 tons to complete
No.5 type 0 slip – Idle
No.6 type 0 slip – Idle
No.1 type 5 drydock – Idle
No.2 type 3 drydock – El Pajero, CL, rebuilding from 15/06/27
No.3 type 0 drydock – Idle
No.4 type 0 drydock – Idle
Dock side – Diego Garcia, CL, re-fitting
Dock side – Nicaragua, CL, re-fitting
Porto-
No.1 type 4 slip – D131, D132, DD, laid down 02/01/28, each receive 399 tons, balance 1141 tons each
No.2 type 3 slip – Mercutio, CA, laid down 02/01/1927, receives 1769 tons, balance 4,075 tons
No.3 type 3 slip – Bonetti, CA, laid down 02/01/1927, receives 1769 tons, balance 4,0754 tons
Dock side – Idle
La Coruna-
No.1 type 2 slip – Idle
No.2 type 0 slip – Idle
No.1 type 2 drydock –El Cordobe, CL, rebuilding from 15/06/1927
No.2 type 1 drydock –Idle
No.3 type 0 drydock –Idle
No.4 type 0 drydock –Idle
Dock side – BDT 49 to 60, laid down 02/04/1927, each receive 50 tons to complete
Santander-
No.1 type 3 slip – Idle
No.2 type 2 slip - Idle
No.3 type 1 slip – D125, DD, laid down 02/01/1928, receives 480 tons to complete
No.4 type 1 slip – D126, DD, laid down 02/01/1928, receives 480 tons to complete
No.5 type 1 slip – Idle
No.6 type 1 slip – Idle
No.1 type 2 drydock – El Temeroso , CL, rebuilding from 15/06/1927
Dock side – Santander, CL, re-fitting
Santiago De Cuba-
No.1 type 2 slip – D133, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.2 type 1 slip - D133, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.3 type 1 slip – D133, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.1 type 4 drydock - Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
Dock side – Idle
San Lorenzo-
No.1 type 3 drydock – Idle
No.2 type 0 drydock – Idle
Dock side – Idle
Panama-
No.1 type 2 slip – D136, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.2 type 1 slip – D137, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.3 type 1 slip – D138, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.4 type 0 slip – Idle
No.5 type 0 slip – Idle
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 0 drydock – Idle
Dock side – San Jose, CL, re-fitting
Luanda-
No.1 type 1 slip – D139, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.2 type 1 slip – D140, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.3 type 1 slip – D141, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.4 type 0 slip – Idle
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 1 drydock – Idle
Dock side – D121, DD, laid down 02/04/1927, receives 480 tons to complete
Dock side – D122, DD, laid down 02/04/1927, receives 480 tons to complete
d/ Transactions
None
e/ Other Notes
Breaking of the following ships:-
None
Re-Fitting (25%) of the following ships:-
Salvador, CL, receives 253 tons to complete, re-enters service 04/03/1928
Liberia, CL, receives 253 tons to complete, re-enters service 04/03/1928
Nicaragua, CL, receives 253 tons to complete, re-enters service 04/03/1928
Santander, CL, receives 470 tons to complete, re-enters service 16/03/1928
San Jose, CL, receives 163 tons to complete, re-enters service 27/02/1928
Re-Building (50%) of the following ships:-
None
Sea trials of the following vessels:-
D113 – D118 = continuing sea trials
D119 – D122 = commence sea trials 27/03/1928
Commissioning of the following vessels:-
BDT 37 – BDT 48 = 01/02/1928
A7 – A12 = 08/03/1928
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 178 tons
f/ Order of Battle
Note: W(X)+Y(Z) = In Service (under repair/refit) + building/on order (breaking)
BB = 08 (0) + 0/0 (0)
BC = 04 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 04 (0) + 2/0 (0)
CL = 48 (0) + 0/0 (0)
CV = 02 (0) + 0/0 (0)
DD = 70 (0) + 6/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 60 (0) + 0/0 (0)
SUB = 12 (0) + 6/0 (0)
MWS = 32 (0) + 0/0 (0)
BDT = 48 (0) + 12/0 (0)
Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo