You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Wednesday, August 3rd 2005, 11:05pm

Iberia, Quarter 1, 1928

Iberian Naval Developments Q1 1928

a/ Industrial Allocation
17/22 factories producing materiel for shipbuilding =17000 tons
5/22 factories (fixed) producing infrastructure materiel =0.5 points
0/22 factories producing infrastructure materiel = 0.0 points

b/ Infrastructure Development
Factory no. 23 commences construction, receiving 0.5 points = Total 0.6points

c/ Naval Construction
Cadiz-
No.1 type 5 slip – Idle
No.2 type 4 slip – D127, D128, DD, laid down 02/01/28, each receive 399 tons, balance 1141 tons each
No.3 type 3 slip – Idle
No.4 type 2 slip – A13, A14, A15, Subs, laid down 02/01/1928, each receive 276 tons, balance 174 tons each
No.5 type 2 slip – A16, A17, A18, Subs, laid down 02/01/1928, each receive 276 tons, balance 174 tons each
No.6 type 2 slip – Idle

No.1 type 4 drydock – El Cunctador, CL, rebuilding from 15/06/27
No.2 type 3 drydock – Idle

Dock side – Salvador, CL, re-fitting
Dock side – Liberia, CL, re-fitting

Barreiro-
No.1 type 4 slip – D129, D130, DD, laid down 02/01/28, each receive 399 tons, balance 1141 tons each
No.2 type 3 slip – Idle
No.3 type 3 slip – D123, DD, laid down 02/01/1928, receives 480 tons to complete
No.4 type 1 slip – D124, DD, laid down 02/01/1928, receives 480 tons to complete
No.5 type 0 slip – Idle
No.6 type 0 slip – Idle

No.1 type 5 drydock – Idle
No.2 type 3 drydock – El Pajero, CL, rebuilding from 15/06/27
No.3 type 0 drydock – Idle
No.4 type 0 drydock – Idle

Dock side – Diego Garcia, CL, re-fitting
Dock side – Nicaragua, CL, re-fitting

Porto-
No.1 type 4 slip – D131, D132, DD, laid down 02/01/28, each receive 399 tons, balance 1141 tons each
No.2 type 3 slip – Mercutio, CA, laid down 02/01/1927, receives 1769 tons, balance 4,075 tons
No.3 type 3 slip – Bonetti, CA, laid down 02/01/1927, receives 1769 tons, balance 4,0754 tons

Dock side – Idle

La Coruna-

No.1 type 2 slip – Idle
No.2 type 0 slip – Idle

No.1 type 2 drydock –El Cordobe, CL, rebuilding from 15/06/1927
No.2 type 1 drydock –Idle
No.3 type 0 drydock –Idle
No.4 type 0 drydock –Idle

Dock side – BDT 49 to 60, laid down 02/04/1927, each receive 50 tons to complete

Santander-

No.1 type 3 slip – Idle
No.2 type 2 slip - Idle
No.3 type 1 slip – D125, DD, laid down 02/01/1928, receives 480 tons to complete
No.4 type 1 slip – D126, DD, laid down 02/01/1928, receives 480 tons to complete
No.5 type 1 slip – Idle
No.6 type 1 slip – Idle

No.1 type 2 drydock – El Temeroso , CL, rebuilding from 15/06/1927

Dock side – Santander, CL, re-fitting

Santiago De Cuba-

No.1 type 2 slip – D133, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.2 type 1 slip - D133, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.3 type 1 slip – D133, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons

No.1 type 4 drydock - Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle

Dock side – Idle

San Lorenzo-

No.1 type 3 drydock – Idle
No.2 type 0 drydock – Idle

Dock side – Idle

Panama-

No.1 type 2 slip – D136, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.2 type 1 slip – D137, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.3 type 1 slip – D138, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.4 type 0 slip – Idle
No.5 type 0 slip – Idle

No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 0 drydock – Idle

Dock side – San Jose, CL, re-fitting

Luanda-

No.1 type 1 slip – D139, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.2 type 1 slip – D140, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.3 type 1 slip – D141, DD, laid down 02/01/1928, receives 399 tons, balance 1,141 tons
No.4 type 0 slip – Idle

No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
No.3 type 1 drydock – Idle
No.4 type 1 drydock – Idle

Dock side – D121, DD, laid down 02/04/1927, receives 480 tons to complete
Dock side – D122, DD, laid down 02/04/1927, receives 480 tons to complete

d/ Transactions
None

e/ Other Notes

Breaking of the following ships:-
None

Re-Fitting (25%) of the following ships:-
Salvador, CL, receives 253 tons to complete, re-enters service 04/03/1928
Liberia, CL, receives 253 tons to complete, re-enters service 04/03/1928
Nicaragua, CL, receives 253 tons to complete, re-enters service 04/03/1928
Santander, CL, receives 470 tons to complete, re-enters service 16/03/1928
San Jose, CL, receives 163 tons to complete, re-enters service 27/02/1928

Re-Building (50%) of the following ships:-
None

Sea trials of the following vessels:-
D113 – D118 = continuing sea trials
D119 – D122 = commence sea trials 27/03/1928

Commissioning of the following vessels:-
BDT 37 – BDT 48 = 01/02/1928
A7 – A12 = 08/03/1928

Tonnage from scrapping = 0 tons

Tonnage Carried Over From This Quarter = 178 tons

f/ Order of Battle
Note: W(X)+Y(Z) = In Service (under repair/refit) + building/on order (breaking)

BB = 08 (0) + 0/0 (0)
BC = 04 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 04 (0) + 2/0 (0)
CL = 48 (0) + 0/0 (0)
CV = 02 (0) + 0/0 (0)
DD = 70 (0) + 6/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 60 (0) + 0/0 (0)
SUB = 12 (0) + 6/0 (0)
MWS = 32 (0) + 0/0 (0)
BDT = 48 (0) + 12/0 (0)
Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo

2

Thursday, August 4th 2005, 1:38am

New construction

Need stats...stat! ^_^

3

Thursday, August 4th 2005, 2:36am

Old Construction

Quoted

Need stats...stat! ^_^
:)


Actually with pretty much everything cleaned out, we'll need the Iberia Fleet replaced in time along with the new construction.

4

Thursday, August 4th 2005, 2:45am

Give us a few days!!!

5

Thursday, August 4th 2005, 6:17am

Hate to add to the inquiry's but did you forget factory 22 or is this a typo?

Quoted

17/21
*snip*
b/ Infrastructure Development
Factory no. 23 commences construction, receiving 0.5 points = Total 0.6points

6

Thursday, August 4th 2005, 6:44pm

(Crap! Why on earth did I hit the "post reply" button instead of the quote?!)

Quoted

Hate to add to the inquiry's but did you forget factory 22 or is this a typo?

Greek secret weapon at work. :-)

7

Thursday, August 4th 2005, 7:27pm

Quoted

Originally posted by Rooijen10
Greek secret weapon at work. :-)


Now its just the "Greek weapon", the secrets out. Now we need to hide our factory's!

8

Thursday, August 4th 2005, 7:38pm

You're absolutely right.
BTW, here the weapon is trying to sabotage a certain very important event in history:

http://www.roboticgladiator.com/images/1903foot.jpg

9

Friday, August 5th 2005, 2:26pm

Quoted

Originally posted by thesmilingassassin
Hate to add to the inquiry's but did you forget factory 22 or is this a typo?

Quoted

17/21
*snip*
b/ Infrastructure Development
Factory no. 23 commences construction, receiving 0.5 points = Total 0.6points



Oh well, so much for hiding Area 51.5!!!

10

Friday, August 5th 2005, 6:26pm

Quoted

Oh well, so much for hiding Area 51.5!!!

Just the one factory there?! Must mean that the Danish are pretty poor.
At least the Japanese have a secret base inside a volcano as well as one in the Ross Iceshelf... and that island over there is not really an island but a large mobile floating factory complex with a military base added as a bonus on top of it.
:-)

11

Friday, August 5th 2005, 7:13pm

Viva la Revolution!

The Iberians are tricky. They could have that factory anywhere. The New World will rebel eventually.

12

Wednesday, August 10th 2005, 12:41pm

Quoted

Greek secret weapon at work. :-)


Trojan Factory.

Cheers,