You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, December 15th 2013, 3:15pm

France, Q3/1944



Report for Q3/1944
Industrial Allocation
- 24/27 factories producing 24,000t materials.
- 3/27 factories producing infrastructure
- 903t from stockpile.
- 2,378t from transactions.
- 0t from scrapping.
- 27,282t materials total.
- 23,779t used.
- 3,503t stored for Q4/44.

Infrastructure Development
3 factories dedicated to IP, producing 0.3 IP. 4.4 IP added to half-factory, 0.6 IP remaining.

Naval Construction

Arsenal de La Rochelle (Cl 5)
Class 4.5 Slip #1 - Idle
Class 4 Slip #1 - Idle
Class 3 Slip #1 - Heavy Cruiser Redoubtable laid down July 1st, 1943. 14,275 tons required. 3000 tons added in Q3/1944 for a total of 5700 / 14275 tons. 8575 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
Class 3 Slip #2 - Heavy Cruiser Renommée laid down July 1st, 1943. 14,275 tons required. 3000 tons added in Q3/1944 for a total of 5700 / 14275 tons. 8575 / 14275 tons remaining. Launched September, 1944. Completion planned for June 9th, 1945.
Class 3 Slip #3 - Contre-Torpillieur L'Infatigable (Forbin class) laid down September 1st, 1944. 2,500 tons required. 210 tons added in Q3/1944 for a total of 210 / 2500 tons. 2290 / 2500 tons remaining. Launched November 19th, 1944. Completed June 15th, 1945.
Class 3 Slip #4 - Contre-Torpillieur Duperré (Forbin class) laid down March 1st, 1944. 2,500 tons required. 625 tons added in Q3/1944 for a total of 1460 / 2500 tons. 1040 / 2500 tons remaining. Launched July 19th, 1944. Completed March 15th, 1945.
Class 2 Slip #1 - Contre-Torpillieur L'Inébranlable (Forbin class) laid down July 1st, 1944. 2,500 tons required. 625 tons added in Q3/1944 for a total of 625 / 2500 tons. 1875 / 2500 tons remaining. Launched November 19th, 1944. Completed June 15th, 1945.
Class 2 Slip #2 - Contre-Torpillieur L'Inflexible (Forbin class) laid down May 1st, 1944. 2,500 tons required. 625 tons added in Q3/1944 for a total of 1250 / 2500 tons. 1250 / 2500 tons remaining. Launched September 19th, 1944. Completed April 15th, 1945.
Class 1 Slip #1 -Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Submarine Gymnote (Experimental Testbed) laid down July 1st, 1944. 375 tons required. 375 tons added in Q3/1944 for a total of 375 / 375 tons. 0 / 375 tons remaining. Launched August 24th, 1944. Completed November 12th, 1944.
Class 0 Slip #4 - Submarine Circé (Thetis class) laid down April 1st, 1944. 675 tons required. 300 tons added in Q3/1944 for a total of 600 / 675 tons. 375 / 675 tons remaining. Launched July 30th, 1944. Completed January 21st, 1945.

Dockside:
- Export Battleship Tapae laid down for Romania January 1st, 1943. 34,448 tons required. 2,379 tons added in Q3/1944 for a total of 16653 / 34448 tons. 17795 / 34448 tons remaining. Launched June, 1944. Completion planned for September 9th, 1946.
- Contre-Torpillieur D'Estrées (Forbin class) laid down September 1st, 1943. 2,500 tons required. 415 tons added in Q3/1944 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched January 19th, 1943. Completed August 15th, 1944.
- Contre-Torpillieur d'Estaing (Forbin class) laid down November 1st, 1943. 2,500 tons required. 625 tons added in Q3/1944 for a total of 2500 / 2500 tons. 0 / 2500 tons remaining. Launched March 19th, 1944. Completed October 15th, 1944.
- Contre-Torpillieur Guépratte (Forbin class) laid down January 1st, 1944. 2,500 tons required. 625 tons added in Q3/1944 for a total of 1875 / 2500 tons. 625 / 2500 tons remaining. Launched May 19th, 1944. Completed December 15th, 1944.
- Escorteur rapide Le Vendéen laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q3/1944 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
- Escorteur rapide Le Bordelais laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q3/1944 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
- Escorteur rapide Le Gascon laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q3/1944 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
- Escorteur rapide Le Savoyard laid down January 1st, 1944. 1,185 tons required. 350 tons added in Q3/1944 for a total of 1050 / 1185 tons. 135 / 1185 tons remaining. Launched May 3rd, 1944. Completed November 6th, 1944.
- Submarine Calypso (Thetis class) laid down October 1st, 1943. 675 tons required. 0 tons added in Q3/1944 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched February 31st, 1943. Completed July 21st, 1944.
- Submarine Naiade (Thetis class) laid down January 1st, 1944. 675 tons required. 75 tons added in Q3/1944 for a total of 675 / 675 tons. 0 / 675 tons remaining. Launched April 30th, 1944. Completed October 21st, 1944.
- Tanker Pluviôse converted as naval auxiliary. 260 tons required. 260 tons added in Q3/1944. Conversion completed.

DCNS Brest (Cl 5)
Class 3 Drydock #1 - Light cruiser Montcalm begins partial reconstruction started on July 1st, 1944. 2797 tons required. 1100 tons added in Q3 for a total of 1100 / 2797 tons. 1697 /2797 tons remaining. Refit completed February 11th, 1945.
Class 2 Drydock #1 - Light cruiser Primauguet continues partial reconstruction. 2797 tons required. 1100 tons added in Q3 for a total of 2200 / 2797 tons. 597 /2797 tons remaining. Refit completed November 11th, 1944.
Class 1 Drydock #1 - Destroyer Épervier undergoing minor refit beginning July 1st, 1944. 100 tons required. 100 tons added Q3/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes August 17th.
Class 0 Drydock #1 - Idle

Dockside:
- Tugboat Cygne converted as naval auxiliary. 223 tons required. 223 tons added in Q3/1944. Conversion completed.
- Merchant ship Furet converted as naval auxiliary (aircraft transport). 211 tons required. 211 tons added in Q3/1944. Conversion completed.

Arsenal de Cayenne (Cl 5)
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle

Dockside:
N/A

Arsenal de Abidjan (Cl 5)
Class 3 Drydock #1 - Emilia-class patrouilleur Roxanne refitting. 56 tons required. 56 tons added Q2/44. 0 tons remaining. Refit completed.
Class 1 Drydock #1 - Emilia-class patrouilleur Laurette refitting. 56 tons required. 56 tons added Q3/44. 0 tons remaining. Refit completed.

Société Nouvelle des Forges et Chantiers de la Méditerranée, Marseilles (Cl 5)
Class 4 Drydock #1 - Idle
Class 3 Slip #1 - Aircraft Carrier Zélé laid down January 1st, 1944. 14,550 tons required. 100 tons added in Q3/1944 for a total of 300 / 14550 tons. 14250 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
Class 3 Slip #2 - Aircraft Carrier Héros laid down January 1st, 1944. 14,550 tons required. 100 tons added in Q3/1944 for a total of 300 / 14550 tons. 14250 / 14550 tons remaining until completion. Launched March 3rd, 1945. Completed December 17th, 1945.
Class 2 Drydock #1 - Destroyer Milan undergoing minor refit beginning July 1st, 1944. 100 tons required. 100 tons added Q3/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes August 17th.
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Destroyer Bison undergoing minor refit beginning July 1st, 1944. 100 tons required. 100 tons added Q3/44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes August 17th.
Class 0 Drydock #1 - Idle

Dockside:
- Frégate de surveillance Fidji (Polynésie class) laid down January 1st, 1944. 2,779 tons required. 700 tons added in Q3/1944 for a total of 2100 / 2779 tons. 679 / 2779 tons remaining. Launched May 22nd, 1944. Completed December 24th, 1944.
- Frégate Sans Peur laid down January 1st, 1944. 1,400 tons required. 400 tons added in Q3/1944 for a total of 1200 / 1400 tons. 200 / 1400 tons remaining. Launched May 5th, 1944. Completed December 12th, 1944.

Arsenal de Oran (Cl 5)
Class 1 Drydock #1 - Destroyer Valmy undergoing minor refit beginning July 1st, 1944. 100 tons required. 100 tons added Q3/ 44 for total of 100 / 100 tons. 0 / 100 tons remaining until refit completes August 17th.
Class 0 Drydock #1 - Idle

Dockside:
N/A

Arsenal de Tunis (Cl 5)
Class 4 Drydock #1 - Light cruiser Emile Bertin completes partial reconstruction started on January 1st, 1944. 2797 tons required. 597 tons added in Q3 for a total of 2797 / 2797 tons. 0 /2797 tons remaining. Refit completed August 11th, 1944.
Class 3 Slip #1 - Idle
Class 1 drydock #1 - Idle

Dockside:
N/A

Arsenal de Beiruit (Cl 5)
Class 3 Drydock #1 - Idle

Dockside:
N/A

Arsenal de Djibouti (Cl 2)
Class 2 Drydock #1 - Emilia-class patrouilleur Vivette refitting. 56 tons required. 56 tons added Q3/44. 0 tons remaining. Refit completed.
Class 1 Drydock - Emilia-class patrouilleur Grisélidis refitting. 56 tons required. 56 tons added Q3/44. 0 tons remaining. Refit completed.
Class 1 Drydock #1 - Corvette Sormonne refitting. 80 tons required. 80 tons added Q3/1944. 0 tons remaining. Refit completes August 15th, 1944.

Dockside:
- None

Base Navale, Dakar
Class 1 Floating Drydock #1 - Idle.

Forges et Chantiers de Indochine, Saigon (Cl 5)
Class 4 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Two craft laid down end to end. Vedette FOM 8m laid down July 1st; 8 tons added Q3/44. Completed July 30th, 1944, launched. Vedette FOM 11m laid down July 1st; 11 tons added Q3/44. Completed July 30th, 1944, launched.
Class 0 Slip #2 - Subchaser Vung Tau laid down July 1st; 125 tons added Q3/44. Completed July 30th, 1944, launched.

Thi Nai

Dockside:
- N/A

Forges et Chantiers de Indochine, Chrouy Svay, Kampuchea (Cl 1)
Class 0 Drydock #1 - Idle

At New Caledonia (Cl 5)
Class 4 Drydock #1 - Heavy cruiser Nouvelle-Calédonie continues total reconstruction. 8601 tons required. 3000 tons added in Q3/1944 for a total of 6600 / 8601 tons. 2001 / 8601 tons remaining. Reconstruction completes Q4/1944.
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 0 Slip #1 - Aviso Algérien (Arabe class) laid down July 1st, 1944. 634 tons required. 190 tons added in Q3/1944 for a total of 190 / 634 tons. 444 / 634 tons remaining. Launched September 27th, 1944. Completed April 19th, 1945.
Class 0 Slip #2 - Aviso Dong Da (Arabe class) laid down July 1st, 1944. 634 tons required. 190 tons added in Q3/1944 for a total of 190 / 634 tons. 444 / 634 tons remaining. Launched September 27th, 1944. Completed April 19th, 1945.
Class 0 Slip #3 - Idle

Dockside:
- Aviso Annamite (Arabe class) laid down January 1st, 1944. 634 tons required. 190 tons added in Q3/1944 for a total of 570 / 634 tons. 64 / 634 tons remaining. Launched April 27th, 1944. Completed October 19th, 1944.
- Aviso Van Kiep (ex-Bambara) (Arabe class) laid down January 1st, 1944. 634 tons required. 190 tons added in Q3/1944 for a total of 570 / 634 tons. 64 / 634 tons remaining. Launched April 27th, 1944. Completed October 19th, 1944.

At Papeete (Cl 3)
Class 3.5 Drydock - Idle

Dockside:
- None

On Trials:
- CV Vengeur
- CV Pacificateur
- CA Jean Bart
- CA Jeanne d'Arc
- CT Dupetit-Thouars
- CT Chevalier Paul
- CT Vauquelin
- CT D'Estrées
- LSD Destrées
- DD Claymore
- DD Carabine
- DD Épée
- DD Trident
- AV Arabe
- AV Chi Lang
- SS Nymphe
- SS Atalante
- SS Calypso
- SS Roland Morillot
- SS Charles Drujon
- LCI Spahi
- LCI Chasseur

From Factories
- 2x La Combattante II motor torpedo boats built; 320 tons total (160t each).

Transactions
- 2,379 tons from Romania for Export Battleship (construction costs).
- 100 tons from Indochina to Germany for sixteen motor minesweepers

Other Notes
None

Ships being scrapped
One CS-27-class submarine is being scrapped for 66 tons apiece.

- Total tonnage in recycling until Q4/1944: (9x178) + (1x66) = 1668
- Total tonnage in recycling until Q1/1945: (1x178) + (1x66) = 244
- Total tonnage in recycling until Q2/1945: (1x66) = 66

Updated Order of Battle, End of Q3/1944
Note: X(Y)+Z = completed (under repair/refit) + under construction - scrapping

The Fleet
Battleships: 7(0)+1
Battlecruisers: 4(0)+0
Aircraft Carriers: 11(0)+2
Heavy Cruisers: 14(1)+2
Light Cruisers: 24(2)+0
Coast Defense Ships: 5(0)+0
Destroyers: 83(0)+6
Frigate: 2(0)+2
Corvettes: 10(0)+0
Escorteurs Rapides: 4(0)+4
Avisos: 10(0)+4
Fleet Submarines: 26(0)+0
Coastal Submarines: 56(0)+3
Motor Torpedo Boats: 38(0)+0
Motor Torpedo Boat Experimental: 1(0)+0
Patrouilleurs: 16(0)+0
Submarine Chasers: 100(0)+0
Light Patrol Boats: 8(0)+0
River Gunboats: 34 (0)+0
Vedettes: 8(0)+0
Minesweepers: 28(0)+0

Fleet Train
Replenishment Ships: 14(0)+0
Light Oiler Tankers: 7(0)+0
Gasoline Tankers: 3(0)+0
Oil Transport Tankers: 4(0)+0
Fleet Tenders: 4(0)+0
Submarine Tenders: 1(0)+0
Heavy Repair Ships: 2(0)+0
Light Repair Ships: 4(0)+0
Ammunition Ships: 2(0)+0
Transports: 8(0)+0

Auxiliaries:
Sail Training Ships: 2(0)+0
Sail Training Yawls: 3(0)+0
Fleet Tugs: 10(0)+0
Light Harbour Tugs: 4(0)+0
Netlayers: 0(0)+0
Research Ship: 3(0)+0
Research Submarine: 1(0)+0

Amphibious Forces:
Dock Landing Ship: 2(0)+0
Vehicle Landing Ship: 4(0)+0
Heavy Landing Ship: 8(0)+0
Troop Transport Ships: 2(0)+0
Heavy Tank Landing Craft (CDIC): 10(0)+0
Infantry Landing Craft Large (EDA-L): 6(0)+0
Tank Landing Craft (EDA): 13(0)+0
Infantry Assault Craft Small (EA): 29(0)+0

Minor Craft:
Bateau de Service: 72(0)+0
Patrouilleur de Port: 54(0)+0

Patrouille Navale:
Frigate: 1(0)+0
Avisos: 1(0)+2
Minesweepers: 16(0)+0
Survey Craft: 1(0)+0
Tank Landing Craft (EDA): 8(0)+0
Infantry Assault Craft (EA): 8(0)+0
Submarine Chasers: 54(0)+0
Motor Torpedo Boats: 4(0)+0
Vedettes: 22(0)+0
Light Patrol Boats: 4(0)+0
Bateau de Service: 12(0)+0
Patrouilleur de Port: 4(0)+0