You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, January 3rd 2008, 11:08pm

Nordmark Q3/1935

A) Industry

20 factories (non fixed) producing 20000tons of ship materials. Plus stockpile of 3270tons. 750tons received from Yugoslavia, 5164tons received from Germany, 450tons received from Poland & 700t received from Mexico
3 factories (fixed) producing 0.3IP for Q3/1935

B) Infrastructure Development
Karlskrona Type 0 Slip #3 extending to type 1 Slip #2, 0.4IP needed, 0.3IP added

C) Ship Construction

Karlskrona
Type 4 Slip #1: German CV Peter Strasser building, 22323t needed, 2232t added.
Type 3 Dock #1: DD18-2 rebuilding to F18-2. 53t needed, 53t added. Completed
Type 3 Dock #2: DD18-3 rebuilding to F18-3. 53t needed, 53t added. Completed
Type 3 Slip #1: Yugoslavia (super-lofoten) CDS building, 10000t needed, 2000t added. Launched
Type 3 Slip #2: idle
Type 1 Dock #1: DD18-11 rebuilding to F18-11. 553t needed, 500t added.
Type 1 Slip #1: idle
Type 0 Dock #1: idle
Type 0 Slip #1: idle
Type 0 Slip #2: idle
Type 0 Slip #3: extending


Free Floating:
BB33-A, Oscar II building, 13000tons needed, 2000tons added.
DD34-13, 0tons needed, 0tons added. Completed
F35 class, F35-1, 0t needed, 0t added. Completed
F35 class, F35-2, 0t needed, 0t added. Completed
F35 class, F35-3, 0t needed, 0t added. Completed
F35 class, F35-11, 500t needed, 500t added.
F35 class, F35-12, 500t needed, 500t added.
DD18-2 rebuilding to F18-2. 53t needed, 53t added. Completed
DD18-3 rebuilding to F18-3. 53t needed, 53t added. Completed

Helsingfors Örlovsvarv
Type 3 Slip #1: idle
Type 1 Dock #1: DD18-4 rebuilding to F18-4. 53t needed, 53t added. Completed
Type 1 Slip #1: P Type G Class Subs GP1 & GP2 building, 200tons needed each, 200tons added each. Launched & Completed.
Type 1 Slip #2: idle
Type 0 Slip #1: idle

Free Floating:
DD34-14, 0tons needed, 0tons added. Completed
DD34-15, 0tons needed, 0tons added. Completed
F35 class, F35-4, 0t needed, 0t added. Completed
F35 class, F35-13, 500t needed, 500t added.
DD18-4 rebuilding to F18-4. 53t needed, 53t added. Completed

Gustavsvern Naval Base, Trondheim
Type 4 Dock #1: idle
Type 4 Slip #1: German CV Graf Zeppelin laid down, 26787t needed, 2232t added.
Type 3 Dock #1: idle
Type 3 Slip #1: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 2 Slip #2: idle
Type 0 Dock #1: idle
Type 0 Dock #2: idle
Type 0 Slip #1: PF35 class, PF35-6 laid down. 947t needed, 447t added. Launched
Type 0 Slip #2: idle



Free Floating:
BB33-B, Folkunga Lion building, 17000tons needed, 2000tons added.
F35 class, F35-5, 0t needed, 0t added. Completed
F35 class, F35-6, 0t needed, 0t added. Completed
F35 class, F35-14, 500t needed, 500t added.
F35 class, F35-15, 500t needed, 500t added.
DD18-5 rebuilding to F18-5. 53t needed, 53t added. Completed
DD18-6 rebuilding to F18-6. 53t needed, 53t added. Completed
DD18-9 rebuilding to F18-9. 53t needed, 53t added. Completed

Karljohansvern Naval Base, Horten outside Oslo
Type 3 Slip #1: idle
Type 1 Slip #1: idle

Freefloating:


Oscarsvern Naval Base, Leivsborg
Type 4 Dock #1: Dristigheten Class BC rebuilding, 11000t needed, 2000t added.
Type 4 Slip #1: idle
Type 3 Slip #1: idle
Type 1 Dock #1: idle
Type 1 Slip #1: idle
Type 1 Slip #2: PF35 class, PF35-1 laid down. 947t needed, 447t added. Launched
Type 0 Slip #1: PF35 class, PF35-2 laid down. 947t needed, 447t added. Launched
Type 0 Slip #2: PF35 class, PF35-3 laid down. 947t needed, 447t added. Launched

Free Floating:
BB33-C, Eric den Helige building, 22000tons needed, 2000tons added.
F35 class, F35-7, 0t needed, 0t added. Completed
F35 class, F35-8, 0t needed, 0t added. Completed
F35 class, F35-16, 500t needed, 500t added.
DD18-7 rebuilding to F18-7. 53t needed, 53t added. Completed

Iceland Naval Station
Type 1 Dock #1: idle
Type 1 Slip #1: PF35 class, PF35-4 laid down. 947t needed, 447t added. Launched
Type 0 Slip #1: PF35 class, PF35-5 laid down. 947t needed, 447t added. Launched

Free Floating:
F35 class, F35-9, 0t needed, 0t added. Completed
F35 class, F35-10, 0t needed, 0t added. Completed
DD18-8 rebuilding to F18-8. 53t needed, 53t added. Completed

Faeroes Naval Station
Type 0 Dock #1: idle

Åland Naval Base
Type 3 Dock #1: Ve Class CML, Vidar scrapping, 799t will be available in Q1/1936.
Type 1 Dock #1: idle
Type 0 Dock #1: idle

Free Floating:
DD18-10 rebuilding to F18-10, 53t needed, 53t added. Completed

South Georgia Naval Base
Type 0 Dock #1: idle

D) Transactions

DD 20 1 to 5 transferred to Mexico.

E) Other Notes
F18 1-10 on trials
DD34 6-12 on trials
DD34 12-15 start trials
Admiral Sparre class Landing ships on trials

F) Updated Order of Battle, 1/7/35

Note: X(Y) +Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 2(0)3
BC: 5(1)0
CV: 3(0)0
CA: 4(0)0
CL: 38(0)0
DD: 63(0)3
Motor Torpedo Boats: 120(0)0
Torpedo boats: 54(0)0
Subs type (a): 18(0)0
Subs type (b): 8(0)0
Sloops/Frigates: 110(0)14
CDBB: 5(0)0
Auxiliaries 14(0)0
Landing Craft 50(0)0


New stockpile of 8811tons

This post has been edited 1 times, last edit by "Earl822" (Jan 6th 2008, 4:45pm)


2

Friday, January 4th 2008, 1:06am

RE: Nordmark Q3/1935

Quoted

Originally posted by Earl822

Type 1 Slip #1: P Type G Class Subs GP1 & GP2 Laid down, 200tons needed each, 200tons added each. Launched & Completed.

Just a small point, but..........

As as ship of 200 to 499 tons has a build time of (light displacement/1000) + 4 months, how can these subs be laid down, built and launched in 3 months?

3

Friday, January 4th 2008, 2:44am

Snip:

Quoted

Wooden and steel vessels of 200 tons and smaller, 150ft and smaller, can be constructed at a number of

2 crafts smaller than 25t per factory per quarter
or
1 craft smaller than 100t per factory per quarter
or
1 craft smaller than 200t per 3 whole factories per quarter

Constructing such craft does not require use of the slips or docks in a players infrastructure, if not in excess of the rule stated above, but constructing such craft still requires an amount of materials equal to its light displacement out of the nations war-materials production, in the month the vessel is constructed. For the purposes of the sim, the construction of such a craft is assumed to last exactly one month, all of it on slip. Repairs do not occupy any capacity, but are still paid for in materials. Shake-down cruise is assumed to last 1 month for full effect.


Now the G class tonnage,

Quoted

G Class , Nordmark Submarine laid down 1934
Displacement:
415 t light


My guess is that they have already had 215 tons added last quarter and are completing this quarter.

4

Friday, January 4th 2008, 2:49am

Heres a snippet from Q2...

Quoted

Helsingfors Örlovsvarv
Type 3 Slip #1: idle
Type 1 Dock #1: DD18-4 rebuilding to F18-4. 553t needed, 500t added. Floated out.
Type 1 Slip #1: P Type G Class Subs GP1 & GP2 Laid down, 415tons needed each, 215tons added each
Type 1 Slip #2: idle
Type 0 Slip #1: F35 class, F35-13 laid down. 947t needed, 447t added. Launched

5

Friday, January 4th 2008, 3:06am

ok, so it's just that the report is misleading as to when they were laid down........

no problem!

6

Friday, January 4th 2008, 3:21am

I sometimes wind up doing the same thing when I post, I use last quarters report and modify it. Some times I forget to change the "Laid down" information to "building".

Looks like Earl did the same thing.

7

Friday, January 4th 2008, 9:19am

yep, sometimes I get tired and forget to delete the 'laid down' bit.

This post has been edited 1 times, last edit by "Earl822" (Jan 6th 2008, 4:44pm)