You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, April 24th 2005, 11:04am

Atlantis Q2/27

A. Industrial Allocation

10/30 factories (non fixed) to naval materials: 10,000 tons created for Q2/1927 plus 0 tons stockpiled from Q1/27 plus 675 tons transfered from Chile in Q2/1927 plus 1,830 tons transfered from Chile in Q2/1927 for "12,505" total tons.

12,075 tons used for ship building, 430 tons stockpiled for next quarter.

15/30 factories (fixed) to infrastructure development: 1.5 points for Q2/1927

5/30 factories (non fixed) to infrastructure development: 0.5 points for Q2/1927

Total 2.0 infrastructure points created

B. Infrastructure Development

2.0 points added to ports at Phelleus, Lycabettus, Cleito, Maracaibo and Illissus

0.5 points added to 1 type 2 slip at Duecalion
0.3 points added to 1 type 0 slip at Phelleus
0.3 points added to 1 type 0 slip at Phelleus
0.3 points added to 1 type 0 slip at Cleito
0.3 points added to 1 type 0 slip at Cleito
0.3 points added to 1 type 0 slip at Cleito

C. Naval Construction

At Cleito Type 4 port (7/9)

Class 4 Slip #1 -CV Alioth building, 6000 tons used, 1000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - completed
Class 0 Slip #2 -under construction, 0.2 points used, 0.3 points added
Class 0 Slip #3 -under construction, 0.2 points used, 0.3 points added
Class 0 Slip #4 -under construction, 0.2 points used, 0.3 points added

3x115 ton subchasers

At Eridanus Type 4 port (8/9)

Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle

3x115 ton subchasers


At Duecalion type 3 port (6/7)

Class 3 Slip #1 - CL Ares launched, 7,973 tons needed, 5,000 tons used, 1,000 tons added
Class 3 Slip #2 - CL Oceanus launched, 7,973 tons needed, 5,000 tons used,1,000 tons added
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - under construction, 0.5 points used, 0.5 points added
Class 2 Drydock #1 - Idle

AC Cape Verde moved from drydock freefloating


At Illissus type 3 port (7/7)

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 2 Slip #1 - Chilean cruiser "Atacama" building, 3,660 tons used, 1830 tons added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - completes construction
Class 0 Slip #4 - completes construction

3x115 ton subchasers

At Phelleus type 5 port (9/11)

Class 3 Slip #1 - CL Persephone launched, 7,973 tons needed, 5,000 tons used,1,000 tons added
Class 3 Slip #2 - CL Artemis launched, 7,973 tons needed, 5,000 tons used,1,000 tons added
Class 3 Drydock #1 - Idle
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - completed
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 -begins construction, 0.2 points used, 0.3 points added
Class 0 Slip #4 -begins construction, 0.2 points used, 0.3 points added

AC Venezuela moved from drydock freefloating

At Lycabettus type 4 port (8/9)

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - CA Medusa begins convertion (rebuild) to CL, 3,748 tons needed, 644 tons used, 1,000 tons added
Class 2 Drydock #2 - CA Minotaur begins convertion (rebuild) to CL, 3,748 tons needed, 644 tons used, 1,000 tons added
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 1 Drydock #1 - Idle

3x115 ton subchasers


At Maracaibo type 3 port (5/7)

Class 3 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - MPSS ship Efficax launched, 1,473 tons needed, 6,441 tons used, 473 tons added
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - completed


At Safi type 2 port (4/5)

Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Drydock #1 - Idle


Launched ships being completed:

CA Astyanax freefloating, 696 tons needed, 10,000 tons used, 696 tons added.
CA Sarpedon freefloating, 696 tons needed, 10,000 tons used, 696 tons added

AC Venezuela converting to training ship, 4,800 tons needed, 3,903 tons used, construction halted , moored at Phelleus
AC Cape Verde converting to training ship, 4,800 tons needed, 3,903 tons used, construction halted , moored at Duecalion


Ships completed and on trials

BB Aggamemnon converted to gunnery training ship, begins trials

Admiraly type 1 destroyers Uproar, Upstart, Upstage, Unruly, Uncouth, Unorthodox, Unity and Underhand begin trials

MS-20, MS-21, MS-22, MS-23, MS-24, MS-25 completed trials (end of Q4/26)

SS R-62, SS R-63, SS R-64, SS R-65, SS R-66, SS R-67, SS R-68, SS R-69, SS R-70, SS R-71, SS R-72, SS R-73 completed trials (end of Q4/26)

Summary of ship building/repairs/rebuilds and convertions.


AC's Cape Verde and Venezuela converting to training ships, work suspended.
CV Alioth building
CA's Astyanax and Sarpedon launched, building
CL #1 building for Chile, name unavailable at present
4xAres class CL's building
MPSS Efficax building


D. Transactions

Float Plane Carriers Praia and Mindelo sold to Chile
Subchasers SC 1-12 sold to Chile

675 tons recieved from Chile for payment of Floatplane Carrier and Subchaser Purchase.
Total cost is 2700 tons of materials

Deal made to purchase a pair of floatplane carriers and 12 subchasers from Atlantis. Delivery of items:
AV-1 Michimalonco (ex Praia) delivered.
SC 1-6 delivered.
AV-3 Lautaro (ex-Mindelo)= delivered
SC 7-12 payment made, dilivery in Q3/1927
675 tons of material transfered from Chile to Atlantis for forth of four payments.

Second deal with Atlantis for a trio of "light cruisers" with the potential for a pair of "heavy cruisers" based on the same hull. 1,830 tons of material transfered to Atlantis for the building down of "light cruiser" (CL-6). Second "light cruiser" will be built locally. Third will be built in Atlantis. Should the "heavy cruisers" come about, the first will be built in Atlantis, the second in Chile.

E. Other Notes

BB Aggamemnon and AC's *Cape Verde and *Venezuela converting to gunnery training ships.
*conversions susspended

Admiraly type 1 destroyers Uproar, Upstart, Upstage, Unruly, Uncouth, Unorthodox, Unity and Underhand undergoing rebuild

F. Updated Order of Battle, 1/1/26

Note: X(Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

BB: 9(1)0 * BB Aggamemnon converting to gunnery training ship *
BC: 2(0)0
CV: 3(0)1
CA: 12(0)2
CAE:0(0)0
CL: 49(0)4
DD: 122(8)0
Training ships: 0(1)0 * BB Aggamemnon converting to gunnery training ship *
Torpedo boats: N/A
Sloops: N/A
Frigates: N/A
Moniters:2(0)0
Torpedo gunboats: 32(0)0
Gunboats 12(0)0
Patrol vessels 50(0)0
Mine sweepers 24 (0) 0
Sub chasers 300(0)12
Fleet Submarine: 20(0)0
Coastal Submarine: 72(0)0
Floatplane carrier/tenders 3(0)0
destroyer depot ships 2(0)0
Submarine depot ships 2(0)1
Repair ships 2(0)0
Auxillary's N/A