1925
___________________________________________________________________________
3rd Quarter
___________________________________________________________________________
Ships Building:
HMS Kent
HMS Suffolk
HMS Sussex
HMS Norfolk
4635t built, each of them recieve 1545t
HMS Diana
HMS Apollo
HMS Minerva
2040t built, each of them recieve 1020t
HMS Powys
HMS Ceryn
HMS Dyfed
HMS Dummonia
HMS Deira
1050t built, each of them recieve 525t
HMS Gwynedd
HMS Luitcoyt
HMS Reghed
Laid down in the Armstrong Withworth #11, #12 and #13 slips (type 1)
Each of them recieve 525t
Total tons of material needed: 13440t
14 (of 55) factories assigned to shipbuilding material: 14000t
41 (of 55) factories assigned to IP: 4,1 IP
Factory 56; 0,7 IP spent, 8,6 left
Factory 57; 0,7 IP spent, 8,6 left
Factory 58; 0,7 IP spent, 8,6 left
Factory 59; 0,7 IP spent, 8,6 left
Factory 60; 0,7 IP spent, 8,6 left
Dock #2 (Pembroke): 0,2 IP spent, 2,2 left
Dock #3 (Pembroke): 0,2 IP spent, 2,2 left
Dock #4 (Pembroke): 0,2 IP spent, 2,1 left
714t of material carried over for the next quarter.
___________________________________________________________________________
4th Quarter
___________________________________________________________________________
Ships Building:
HMS Kent
HMS Suffolk
HMS Sussex
HMS Norfolk
6180t built, each of them recieve 1545t
HMS Diana
HMS Apollo
HMS Minerva
3060t built, each of them recieve 1020t
HMS Powys
HMS Ceryn
HMS Dyfed
HMS Dummonia
HMS Deira
1575t built, each of them recieve 346t, finished this turn
HMS Gwynedd
HMS Luitcoyt
HMS Reghed
525t built, each of them recieve 525t
Total tons of material needed: 12545t
12 (of 55) factories assigned to shipbuilding material: 12000t
43 (of 55) factories assigned to IP: 4,3 IP
Factory 56; 0,7 IP spent, 7,9 left
Factory 57; 0,7 IP spent, 7,9 left
Factory 58; 0,7 IP spent, 7,9 left
Factory 59; 0,7 IP spent, 7,9 left
Factory 60; 0,7 IP spent, 7,9 left
Dock #2 (Pembroke): 0,3 IP spent, 1,9 left
Dock #3 (Pembroke): 0,3 IP spent, 1,9 left
Dock #4 (Pembroke): 0,2 IP spent, 1,9 left
169t of material carried over for the next quarter.
___________________________________________________________________________
RN OOB (End of 1925)
BB: 13
BC: 7 (Princess Royal leased to the Philippines)
CV: 5 (3 CV, 1 CVL, 1 CVX)
CA: 5 (4 more building)
CL: 74 (3 more building)
DL: 15 (5 fitting out and 3 more building)
DD: 157
TB: 15
DE: 40 (20 DE23, 20 DE24)
OSS: 32 (26 L, 6 J)
CSS: 54 (32 H, 12 R, 10 O)
___________________________________________________________________________