You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Sunday, July 3rd 2005, 1:04pm

1925 UK Reports

1925
___________________________________________________________________________
3rd Quarter
___________________________________________________________________________


Ships Building:

HMS Kent
HMS Suffolk
HMS Sussex
HMS Norfolk

4635t built, each of them recieve 1545t

HMS Diana
HMS Apollo
HMS Minerva

2040t built, each of them recieve 1020t

HMS Powys
HMS Ceryn
HMS Dyfed
HMS Dummonia
HMS Deira

1050t built, each of them recieve 525t

HMS Gwynedd
HMS Luitcoyt
HMS Reghed

Laid down in the Armstrong Withworth #11, #12 and #13 slips (type 1)
Each of them recieve 525t

Total tons of material needed: 13440t

14 (of 55) factories assigned to shipbuilding material: 14000t
41 (of 55) factories assigned to IP: 4,1 IP

Factory 56; 0,7 IP spent, 8,6 left
Factory 57; 0,7 IP spent, 8,6 left
Factory 58; 0,7 IP spent, 8,6 left
Factory 59; 0,7 IP spent, 8,6 left
Factory 60; 0,7 IP spent, 8,6 left

Dock #2 (Pembroke): 0,2 IP spent, 2,2 left
Dock #3 (Pembroke): 0,2 IP spent, 2,2 left
Dock #4 (Pembroke): 0,2 IP spent, 2,1 left

714t of material carried over for the next quarter.

___________________________________________________________________________
4th Quarter
___________________________________________________________________________


Ships Building:

HMS Kent
HMS Suffolk
HMS Sussex
HMS Norfolk

6180t built, each of them recieve 1545t

HMS Diana
HMS Apollo
HMS Minerva

3060t built, each of them recieve 1020t

HMS Powys
HMS Ceryn
HMS Dyfed
HMS Dummonia
HMS Deira

1575t built, each of them recieve 346t, finished this turn

HMS Gwynedd
HMS Luitcoyt
HMS Reghed

525t built, each of them recieve 525t

Total tons of material needed: 12545t

12 (of 55) factories assigned to shipbuilding material: 12000t
43 (of 55) factories assigned to IP: 4,3 IP

Factory 56; 0,7 IP spent, 7,9 left
Factory 57; 0,7 IP spent, 7,9 left
Factory 58; 0,7 IP spent, 7,9 left
Factory 59; 0,7 IP spent, 7,9 left
Factory 60; 0,7 IP spent, 7,9 left

Dock #2 (Pembroke): 0,3 IP spent, 1,9 left
Dock #3 (Pembroke): 0,3 IP spent, 1,9 left
Dock #4 (Pembroke): 0,2 IP spent, 1,9 left

169t of material carried over for the next quarter.

___________________________________________________________________________

RN OOB (End of 1925)

BB: 13
BC: 7 (Princess Royal leased to the Philippines)
CV: 5 (3 CV, 1 CVL, 1 CVX)
CA: 5 (4 more building)
CL: 74 (3 more building)
DL: 15 (5 fitting out and 3 more building)
DD: 157
TB: 15
DE: 40 (20 DE23, 20 DE24)
OSS: 32 (26 L, 6 J)
CSS: 54 (32 H, 12 R, 10 O)

___________________________________________________________________________