4 factories
1 fix on infrastructure 0,1IP Bilding Factory 5(6%Completed)
3 bilding Warship material 3000t
Warship Material Produced: 3000 t
Stockpile: 3664 t
Recycled Scrap: 0 t
Material Used on Construction: 1650 t
Transferd to France: 2830t Payment for 2 DD now under construction.
New Stockpile: 2280 t
B. Infrastructure Development
0.5 pts, for bilding factory 5(5% complited)
C. Naval Construction
at Danzig:
1 Type 2 slip Bilding Conrad class CL 500t used (2500t of 6000t)
1 Type 1 slips Bilding Pomocik Class 250t used(750t of 2000)
1 Type 1 slips Bilding Pomocik Class 250t used(750t of 2000t)
1 Type 0 slips bilding Chart Class 100t used(300t of 600t)launched
1 Type 0 slips bilding Chart Class 100t used(300t of 600t)launched
1 Type 1 drydock Idle
at Koszalin
1 Type 1 slips Bilding Pomocik Class 250t used(750t of 2000t)
1 Type 0 slips bilding Chart Class 100t used(300t of 600t)launched
1 Type 0 slips bilding Chart Class 100t used(300t of 600t)launched
1 Type 2 drydock idle
2 Type 0 drydocks idle
Note:
![X(](wcf/images/smilies/angry.png)
Y)+Z = completed (under repair/refit) + under construction
BB: 2(0)+0
CL: 0(0)+1
DD: 2(0)+2 in france
FTB: 0(0)+4
AG: 0(0)+3
Submarine: 0(0)+0
Gdansk and baltic hulked