You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, February 9th 2006, 2:10am

Germany - Q1, 1930

A. Industrial Allocation

Factory Allocation:

Warship Material: 4
Infrastructure (Committed): 21 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 1

Warship Material Produced: 4000 t
Stockpile: 2175 t
Recycled Scrap: 0 t
Material Used on Construction: 3623 t
New Stockpile: 2552 t

B. Infrastructure Development

Factory 27 receives 1 point, for 6 total.
Factory 28 receives 1 point, for 6 total.
Type 3 slipway at Cuxhaven upgrade to Type 4 receives 0.2 pts, for 0.4 total.

C. Naval Construction

At Wilhelmshaven

1 Type 2 drydock: PD Hannover conversion to target vessel Zahringenreceives 194t, completed
1 Type 1 slip: Idle
1 Type 0 slip: Submarine U-1 laid down, receives 135t
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle

At Bremerhaven

1 Type 2 slip: Idle
1 Type 1 slip: DD Z-214 laid down, receives 451t
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: Idle

At Cuxhaven

1 Type 3 slip: Upgrading
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: CL Ersatz Amazone receives 1070t, completed, commissioned as DKM Nurnberg

At Kiel

1 Type 4 slipway: CA Ersatz A laid down, receives 1773t
1 Type 2 slipway: Idle
1 Type 2 drydock: Scrapping CL Berlin
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle

D. Transactions
CL Berlin scrapped, 426t to be available Q1 1931.
CA Ersatz A laid down at Kiel
DD Z-214 laid down at Bremerhaven
SS U-1 laid down at Wilhelmshaven


E. Other Notes
CL Nurnberg begins her shakedown cruise

F. Updated Order of Battle, 31/3/30

Note: X(Y)+Z = completed (under repair/refit) + under construction

BB: 3(0)+0
CA: 0(0)+1
CL: 12(0),
DD: 18(0)+1,
SS: 0(0)+1
SL: 6(0)+0
AM: 10(0)+0
TB: 4(0)+0
Target: 1(0)+0

2

Thursday, February 9th 2006, 3:06am

Ersatz "A"

Have we seen this one yet? I can't remember...

3

Thursday, February 9th 2006, 11:54am

I'm following standard German practice in naming large ships on the slips, it's the design you've seen as Admiral Hipper, which is what Ersatz A wil be named when she's commissioned. It's in the Ship Design area under the heading German CA, 1930, the version with the extended belt armor. The reason it's Ersatz A rather than the previous Ersatz xxx is that unlike the CLs I've been buiding, this ship isn't directly replacing any of the ships that are in commission.