A. Industrial Allocation
Factory Allocation:
Warship Material: 4
Infrastructure (Committed): 21 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 1
Warship Material Produced: 4000 t
Stockpile: 2175 t
Recycled Scrap: 0 t
Material Used on Construction: 3623 t
New Stockpile: 2552 t
B. Infrastructure Development
Factory 27 receives 1 point, for 6 total.
Factory 28 receives 1 point, for 6 total.
Type 3 slipway at Cuxhaven upgrade to Type 4 receives 0.2 pts, for 0.4 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: PD
Hannover conversion to target vessel
Zahringenreceives 194t, completed
1 Type 1 slip: Idle
1 Type 0 slip: Submarine
U-1 laid down, receives 135t
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: DD
Z-214 laid down, receives 451t
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: Idle
At Cuxhaven
1 Type 3 slip: Upgrading
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: CL Ersatz Amazone receives 1070t, completed, commissioned as DKM
Nurnberg
At Kiel
1 Type 4 slipway: CA
Ersatz A laid down, receives 1773t
1 Type 2 slipway: Idle
1 Type 2 drydock: Scrapping CL
Berlin
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle
D. Transactions
CL
Berlin scrapped, 426t to be available Q1 1931.
CA
Ersatz A laid down at Kiel
DD
Z-214 laid down at Bremerhaven
SS
U-1 laid down at Wilhelmshaven
E. Other Notes
CL
Nurnberg begins her shakedown cruise
F. Updated Order of Battle, 31/3/30
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
CA: 0(0)+1
CL: 12(0),
DD: 18(0)+1,
SS: 0(0)+1
SL: 6(0)+0
AM: 10(0)+0
TB: 4(0)+0
Target: 1(0)+0