German Naval Developments – Q4/28
A. Industrial Allocation
Factory Allocation:
Warship Material: 1
Infrastructure (Committed): 23 (Bonus production this quarter = 2.3 pts)
Infrastructure (Non-committed): 0
Warship Material Produced: 1000 t
Stockpile: 924 t
Recycled Scrap: 0 t
Material Used on Construction: 1400 t
New Stockpile: 524 t
B. Infrastructure Development
Factory 25 receives 2 points, for 10 total, completed.
Factory 26 receives 2 points, for 10 total, completed.
Type 2 slipway at Bremerhaven upgrade to Type 3 receives 0.6 pts, for 0.7 total
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
At Cuxhaven
1 Type 3 slip: Scrap Amazone
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: Idle
At Kiel
1 Type 3 slipway: CL Ersatz Medusa receives 1400 t., launched
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: Idle
D. Transactions
CL Amazone scrapped at Cuxhaven, 426 t to be available for Q3/29
E. Other Notes
New Orders: None
F. Updated Order of Battle, 31/12/28
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 11(0)+1,
DD: 24(0)+0,
SL: 6(0)+0
AM: 10(0)+0
Note: PD = pre-dreadnought