German Naval Developments – Q1/28
A. Industrial Allocation
Factory Allocation:
Warship Material: 1
Infrastructure (Committed): 23 (Bonus production this quarter = 0.0 pts)
Infrastructure (Non-committed): 0
Warship Material Produced: 1000 t
Stockpile: 178 t
Recycled Scrap: 546 t
Material Used on Construction: 0 t
New Stockpile: 1724 t
B. Infrastructure Development
The Type 3 drydock at Kiel receives 0.3 pts, for 3.5 total.
Factory 25 receives 1 point, for 6 total.
Factory 26 receives 1 point, for 6 total.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: Idle
At Bremerhaven
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
At Cuxhaven
1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip:1 Type 0 slip: Idle
Free-floating: Idle
At Kiel
1 Type 3 slipway: Idle
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slip: Idle
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
D. Transactions
None.
E. Other Notes
CL Bremen continues shake-down cruise
New Orders: None
F. Updated Order of Battle, 31/3/28
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 12(0)+0,.
DD: 24(0)+0,
SL: 6(0)+0
AM: 10(0)+0
Note: PD = pre-dreadnought