You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Monday, March 28th 2011, 11:39pm

Iberia, Quarter 1, 1940

Iberian Naval Developments Q1 1940

a/ Industrial Allocation
24/24 factories producing materiel for shipbuilding =24000 tons
0/24 factories (fixed) producing infrastructure materiel =0.0 points
0/24 factories producing infrastructure materiel = 0.0 points


b/ Infrastructure Development

None

c/ Naval Construction

Cadiz-
No.1 type 5 slip – Idle
No.2 type 4 slip – Idle
No.3 type 3 slip – Idle
No.4 type 2 slip - Idle
No.5 type 2 slip - Alba de Tormes, CL, laid down 01/07/1939, receives 962 tons, balance 1,358 tons
No.6 type 2 slip - Albuera, CL, laid down 01/07/1939, receives 962 tons, balance 1,358 tons

No.1 type 4 drydock - Idle
No.2 type 3 drydock - Idle

Dock side - Mercury, BB, laid down 02/01/37, receives 2437 tons, balance 7,276 tons
Dock side - Terra, BB, laid down 02/01/38, receives 2437 tons, balance 17,024 tons



Barreiro-
No.1 type 4 slip – Alcañiz, CL, laid down 01/10/39, receives 962 tons, balance 2,320 tons
No.2 type 3 slip – Almaraz, CL, laid down 01/10/39, receives 962 tons, balance 2,320 tons
No.3 type 3 slip – D160, DD, laid down 02/01/39, receives 359 tons, balance 286 tons
No.4 type 1 slip - D161, DD, laid down 02/01/39, receives 359 tons, balance 286 tons
No.5 type 1 slip - D162, DD, laid down 02/01/39, receives 359 tons, balance 286 tons
No.6 type 1 slip - D163, DD, laid down 02/01/39, receives 359 tons, balance 286 tons

No.1 type 5 drydock – Idle
No.2 type 3 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle

Dockside - Barcelona, CV, laid down 01/07/1936, receives 488 tons to complete
Dock side - D152, DD, laid down 02/01/39, receives 47 tons to complete
Dock side - D153, DD, laid down 02/01/39, receives 47 tons to complete
Dock side - D154, DD, laid down 02/01/39, receives 47 tons to complete
Dock side - D155, DD, laid down 02/01/39, receives 47 tons to complete

Porto-
No.1 type 4 slip – Mars, BB, laid down 01/07/38, receives 2437 tons, balance 21,898 tons
No.2 type 3 slip - Barrosa, CL, laid down 02/04/40, receives 874 tons, balance 3,370 tons
No.3 type 3 slip – Bailén, CL, laid down 02/04/40, receives 874 tons, balance 3,370 tons
No.4 type 0 slip – Sd25, Sub, laid down 01/10/1939, receives 416 tons, balance 615 tons
No.5 type 0 slip – Sd26, Sub, laid down 01/10/1939, receives 416 tons, balance 615 tons
No.6 type 0 slip – Sd27, Sub, laid down 01/10/1939, receives 416 tons, balance 615 tons
No.7 type 0 slip – Sd28, Sub, laid down 01/10/1939, receives 416 tons, balance 615 tons

Dock side - Idle


La Coruna-

No.1 type 2 slip – SE43, Sub, laid down 02/01/1940, receives 215 tons, balance 161 tons
No.2 type 1 slip – SE44, Sub, laid down 02/01/1940, receives 215 tons, balance 161 tons
No.3 type 0 slip – SE45, Sub, laid down 02/01/1940, receives 215 tons, balance 161 tons
No.4 type 0 slip – SE46, Sub, laid down 02/01/1940, receives 215 tons, balance 161 tons
No.5 type 0 slip – SE47, Sub, laid down 02/01/1940, receives 215 tons, balance 161 tons
No.6 type 0 slip – SE48, Sub, laid down 02/01/1940, receives 215 tons, balance 161 tons

No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle

Dock side - Idle
Dock side – Idle


Santander-

No.1 type 4 slip – Idle
No.2 type 2 slip – Idle
No.3 type 1 slip – BCS 101, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons
No.4 type 1 slip - BCS 102, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons
No.5 type 1 slip - BCS 103, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons
No.6 type 1 slip - BCS 104, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons
No.1 type 2 drydock - Idle

Dock side - Venus, BB, laid down 02/01/37, receives 2437 tons, balance 7,276 tons


Santiago De Cuba-

No.1 type 2 slip - Idle
No.2 type 1 slip - BCS 105, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons
No.3 type 1 slip - BCS 106, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons

No.1 type 4 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle

Dock side - Idle


San Lorenzo-

No.1 type 4 drydock - Idle
No.2 type 1 drydock - Idle

Dock side - Idle


Panama-

No.1 type 2 slip - Idle
No.2 type 1 slip - D164, DD, laid down 01/07/39, receives 329 tons, balance 286 tons
No.3 type 1 slip – D165, DD, laid down 01/07/39, receives 329 tons, balance 286 tons
No.4 type 1 slip – D166, DD, laid down 01/07/39, receives 329 tons, balance 286 tons
No.5 type 1 slip - D167, DD, laid down 01/07/39, receives 329 tons, balance 286 tons

No.1 type 4 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle

Dock side - D156, DD, laid down 02/01/39, receives 47 tons to complete
Dock side – D157, DD, laid down 02/01/39, receives 47 tons to complete
Dock side – D158, DD, laid down 02/01/39, receives 47 tons to complete
Dock side - D159, DD, laid down 02/01/39, receives 47 tons to complete



Luanda-

No.1 type 1 slip - BCS 107, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons
No.2 type 1 slip - BCS 108, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons
No.3 type 1 slip - BCS 109, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons
No.4 type 1 slip - BCS 110, BCS, laid down 02/01/40, receives 215 tons, balance 160 tons


No.1 type 4 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle
No.4 type 1 drydock - Idle

Dock side - Idle


San Hainando-

No.1 type 4 drydock - Idle
No.2 type 2 drydock - Idle
No.3 type 1 drydock - Idle


d/ Transactions
None


e/ Other Notes

Breaking of the following ships:-
None

Re-Fitting (25%) of the following ships:-
None

Re-Building (50%) of the following ships:-
None

Sea trials of the following vessels:-
D152 to D159 commences sea trials on 10/01/1949
Barcelona continues sea trials until 28/06/1940

Commissioning of the following vessels:-
Sd 21 to Sd 24 commission on 06/02/1940
Se 37 to Se 42 commission on 04/03/1940
BCS 91 to BCS 100 commission on 04/03/1940

Transfer of the following vessels:-
None

Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 4270 tons

f/ Order of Battle
Note: W (X) +Y (Z) = In Service (under repair/refit) + building/on order (breaking)

BB = 11 (0) + 4/0 (0)
BC = 04 (0) + 0/0 (0)
CDS(CE) = 05 (0) + 0/0 (0)
CA = 10 (0) + 0/0 (0)
CL = 37 (0) + 6/0 (0)
CV = 07 (0) + 1/0 (0)
DD = 93 (0) + 16/0 (0)
FR = 16 (0) + 0/0 (0)
GB = 92 (0) + 0/0 (0)
SL = 20 (0) + 0/0 (0)
SUB = 114 (0) + 10/0 (0)
MWS = 32 (0) + 0/0 (0)
BCS = 100 (0) + 10/0 (0)
BDT = 300 (0) + 0/0 (0)
BDC = 300 (0) + 0/0 (0)
TS = 06 (0) + 0/0 (0)
HS = 02 (0) + 0/0 (0)
TK = 07 (0) + 0/0 (0)
SLV = 04 (0) + 0/0 (0)
BDA = 72 (0) + 0/0 (0)
EDA = 48 (0) + 0/0 (0)

Note: FR = Frigate
GB = Gun Boat
MWS = Mine Warfare Ship
BDT = Barco Del Torpedo (MTB)
BDC = Barco De Canon (MGB)
BCS = Barco Contra Submarino (ASW)
BDA = Barco Del Aterrizaje (Landing Craft)
EDA = Embarcacion De Ataque (Assault Boat)
TS = Troop Ship
HS = Hospital Ship
TK = Tanker
SL = Sloop
SLV = Sea-Lift Vessel