Danish Naval Developments Q2 1940
a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
None
c/ Naval Construction
Copenhagen-
No.1 type 3 slip –
No.2 type 2 slip – Ue 43, Ue 44, SUB, laid down 01/05/1940, receives 244 tons each, balance 109 tons each
No.3 type 1 slip – Ue 45, Ue 46, SUB, laid down 01/05/1940, receives 244 tons each, balance 109 tons each
No.4 type 1 slip – Ue 47, Ue 48, SUB, laid down 01/05/1940, receives 244 tons each, balance 109 tons each
No.1 type 3 drydock – Idle
Dock side - Idle
Aarhus-
No.1 type 3.5 slip – Aegir, BB, laid down 21/03/1939, receives 2464 tons, balance 26,544 tons
No.2 type 2 slip – Idle
No.3 type 1 slip – Calluna, SL, laid down 02/06/1940, receives 496 tons, balance 1,283 tons
No.4 type 1 slip – Dracaena, SL, laid down 02/06/1940, receives 496 tons, balance 1,283 tons
No.1 type 3.5 drydock – Idle
No.2 type 2 drydock – Idle
Dock side – Thor, BB, laid down 01/07/1939, receives 2464 tons, balance 11,760 tons
Dock side – Artemisia, SL, laid down 20/01/1940, receives 496 tons, balance 787 tons
Dock side – Buxus, SL, laid down 20/01/1940, receives 496 tons, balance 787 tons
Aalborg-
No.1 type 1 slip – Uf 1, SUB, laid down 01/07/1939, receives 218 tons to complete
No.2 type 1 slip – Uf 2, SUB, laid down 01/07/1939, receives 218 tons to complete No.3 type 1 slip – Uf 3, SUB, laid down 01/07/1939, receives 218 tons to complete No.4 type 1 slip – Uf 4, SUB, laid down 01/07/1939, receives 218 tons to complete No.5 type 1 slip – Uf 5, SUB, laid down 01/07/1939, receives 218 tons to complete No.6 type 1 slip - Uf 6, SUB, laid down 01/07/1939, receives 218 tons to complete
Dock side – Idle
Roskilde-
Wood yard- LTC 5, LTC, laid down 02/04/1940, receives 100 tons to complete
Wood yard- LTC 6, LTC, laid down 02/04/1940, receives 100 tons to complete
Wood yard- LTC 7, LTC, laid down 02/04/1940, receives 100 tons to complete
Wood yard- LTC 8, LTC, laid down 02/04/1940, receives 100 tons to complete
Phuket-
No.1 type 2 drydock - Idle
No.2 type 1 drydock - Idle
Berbera-
No.1 type 1 drydock – Idle
St. Thomas-
No.1 type 1 drydock – Idle
Guinea Bisseau-
No.1 type 1 drydock – Idle
d/ Transactions
0.2 IP points to Siam
e/ Other Notes
Dannebrog re-commissions on 02/05/1940
LTC 5 commissions on 30/06/1940
LTC 6 commissions on 30/06/1940
LTC 7 commissions on 30/06/1940
LTC 8 commissions on 30/06/1940
Ue 37 commences sea trials on 09/04/1940
Ue 38 commences sea trials on 09/04/1940
Ue 39 commences sea trials on 09/04/1940
Ue 40 commences sea trials on 09/04/1940
Ue 41 commences sea trials on 09/04/1940
Ue 42 commences sea trials on 09/04/1940
Uf 1 commences sea trials on 21/06/1940
Uf 2 commences sea trials on 21/06/1940
Uf 3 commences sea trials on 21/06/1940
Uf 4 commences sea trials on 21/06/1940
Uf 5 commences sea trials on 21/06/1940
Uf 6 commences sea trials on 21/06/1940
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 2646 tons
f/ Order of Battle
Note: X (Y) +Z = In Service (under repair/refit) + building/on order (breaking)
BB = 02 (0) + 2/0 (0)
CDS = 04 (0) + 0/0 (0)
CA = 04 (0) + 0/0 (0)
CL = 22 (0) + 0/0 (0)
CV = 02 (0) + 0/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 62 (0) + 0/0 (0)
SL = 16 (0) + 4/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 33 (0) + 0/0 (0)
TB = 00 (0) + 0/0 (0)
CGC = 48 (0) + 0/0 (0)
STC = 36 (0) + 0/0 (0)
MTC = 100 (0) + 0/0 (0)
LTC = 08 (0) + 0/0 (0)
SUB = 45 (0) + 18/0 (0)
MWS = 15 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)
SRV = 03 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat/Escort
CGC = Coast Guard Cutter/Patrol Boat
STC = Small Torpedo Craft
MTC = Medium Torpedo Craft
LTC = Large Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)
SRV = Submarine Recovery Vessel