Danish Naval Developments Q4 1924
a/ Industrial Allocation
6/10 factories producing materiel for shipbuilding =6000 tons
2/10 factories (fixed) producing infrastructure materiel =0.2+0.2 bonus points
2/10 factories producing infrastructure materiel = 0.2 points
b/ Infrastructure Development
Factory no. 11 continuing construction, receives 0.6 points = Total 1.3 points
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Freya, CA, laid down 02/01/24, receives 1768 tons, balance 5833 tons
No.2 type 2 slip – Lolland, CL, laid down 02/04/24, receives 1334 tons, balance 3202 tons
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.1 type 2 drydock - Idle
Dock side –
Bog, SL, laid down 03/01/24, receives 82 tons to complete
Aarhus-
No.1 type 3 slip –Idle
No.2 type 2 slip –Idle
No.3 type 1 slip – UD 1, Sub, laid down 02/04/24, receives 302 tons, balance 326 tons
No.4 type 1 slip – UD 2, Sub, laid down 02/04/24, receives 302 tons, balance 326 tons
No.1 type 3 drydock – Copenhagen, PD, finishes breaking 05/10/24
No.2 type 2 drydock – Idle
Dock side –
Hel, CA, laid down 02/01/23, receives 529 tons to complete
Aalborg-
No.1 type 1 slip – Idle
No.2 type 1 slip – Idle
No.3 type 0 slip - Idle
No.4 type 0 slip - Idle
Dock side –
Ask, SL, laid down 03/01/24, receives 82 tons to complete
Asp, SL, laid down 03/01/24, receives 82 tons to complete
Bangkok-
No.1 type 1 slip –Puma, DD, laid down 02/01/24, receives 336 tons to complete
No.2 type 0 slip – idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side –
Moskito, MWS, laid down 01/10/23, receives 234 tons, balance 58 tons
Gronaa, GB, laid down 02/04/24, receives 69 tons to complete
Vidaa, GB, laid down 02/04/24, receives 69 tons to complete
d/ Transactions
None
e/ Other Notes
All new orders CANCELLED, current projects allowed to complete.
Copenhagen completes breaking on 05/10/24
KDM Mon commissions on 11/11/24
KDM Hel commences sea trials 20/10/24
KDM Moskito continues sea trials until 15/01/25
KDM Arnaa commissions on 04/11/24
KDM Sonderaa commissions on 04/11/24
KDM Gronaa commissions on 04/11/24
Repairs to the following ships:-
Vaerge – 544 tons, starts repairs 15/10/24, re-enters service 01/12/1924
Bellona – 36 tons, starts repairs 01/10/24, re-enters service 02/11/1924
STC’s – 9 tons, start repairs 01/10/24, re-enter service 16/10/1924
D10 – 390 tons, starts repairs 01/10/24
D11 – 468 tons, starts repairs 01/10/24
Re-Fits to the following ships:-
D13 – 390 tons, starts re-fit 01/10/24
Tonnage Carried Over From This Quarter = 62
f/ Order of Battle
Note:
Y)+Z = completed (under repair/refit) + building/on order (breaking)
PD = 01 (0) + 0/0 (1)
AC = 02 (0) + 0/0 (0)
CDS = 03 (0) + 0/0 (0)
CA = 00 (0) + 2/0 (0)
CL = 11 (1) + 1/0 (0)
DD = 19 (2) + 1/0 (0)
FR = 02 (0) + 0/0 (0)
SL = 00 (0) + 3/0 (0)
GB = 00 (0) + 4/0 (0)
TB = 20 (0) + 0/0 (0)
STC = 48 (12) + 0/0 (0)
SUB = 11 (1) + 2/0 (0)
MWS = 06 (0) + 1/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: PD = Pre-Dreadnought
FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)