You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

HoOmAn

Keeper of the Sacred Block Coefficient

  • Send private message

1

Friday, June 1st 2012, 10:17pm

Quarterly Report #86 for the SAE

[SIZE=4]SAE Quarterly Reports[/SIZE]

No. 86 – April to June 1942


[SIZE=3]Transfers/Notes:[/SIZE]


Second payment from China (550ts) for new build LCDS Type 42


[SIZE=3]Factories:[/SIZE]

27 factories total can be used.

Fixed factories

1 factory fixed to produce infrastructure points in 1942.

Flexible factories

26,000ts of material produced this quarter (26 factories).

Material handling

873ts of material transferred from Q1.

120ts of material recovered from scrap yard.

27,085ts of material used this quarter.

458ts of material transferred to Q3.

Infrastructure points used this quarter

0,1pts put into an update of the Type 3 dock in Daressalam to Type 4 for a total of 0,4pts at the end of Q2/42


[SIZE=3]Ships:[/SIZE]

Minor vessels


Completed Units

34x UJ26-class ASW launch
31x UJ30-class ASW launch
24x UJ35-class ASW launch

36x R28-class motor launch
23x R31-class motor launch
8x R37-class motor launch

26x S34-class motor torpedo boat
12x S36-class motor torpedo boat
12x S40-class motor torpedo boat

8x Tree-class minesweeper (Type 16)
13x Bush-class minesweeper (Type 21)
10x Cactus-class minesweeper (Type 28)
8x Flower-class minesweeper (Type 35)
12x Coastal-class minesweeper (Type 37)
8x Seychelles-class minesweeper (Type 38)

4x Circe-class sloops
4x Polar II-class sloops

10x River-class frigate (Type 25)
4x Lake-class frigate (Type 35)
4x Mountain-class frigate (Type 40)

8x Planet-class light destroyer (Type 29)
8x Bird-class light destroyer (Type 35)

5x Guard-class patrol crafts
1x Lorelei-class coast guard cutter

4x Garcia-class river gun boat (Type 35)
2x General-class river gun boat (Type 37)

2x Argonaut-class river monitors (Type 36)

On Trials

2x Mountain-class frigate
- F40-5 Njesuthi running trials until July 42
- F40-6 Mafadi running trials until August 42

3x Coastal-class mine sweeper Type 41
- MSC41-1 running trials until April 42
- MSC41-2 running trials until May 42
- MSC41-3 running trials until June 42

Ordered Units

2x Centaur-class mine sweeper (10 month and 537ts material required per unit)
- MS42-1 Cheiron laid down in Douala on a Type 0 slip in January 42, completed in October 42
- MS42-2 Nessos laid down in Douala on a Type 1 slip in April 42, completed in January 43

3x Coastal-class mine sweeper Type 41 (1 month and 198ts material required per unit)
- MSC41-4 laid down in Montevideo in April 42, completed in April 42
- MSC41-5 laid down in Montevideo in May 42, completed in May 42
- MSC41-6 laid down in Montevideo in June 42, completed in June 42

1x RGB42A-class river gun boat (5 month a 100ts material required per unit)
- RGB42A-1 General Zartenar laid down in Buenos Aires in April 42, completed in August 42

3x R42-class motor launch (1 month and 124ts material required per unit)
- R81 laid down in Montevideo in April 42, completed in April 42
- R82 laid down in Montevideo in May 42, completed in May 42
- R83 laid down in Montevideo in June 42, completed in June 42

Rebuilds/Refits/Repairs

2x FR25-class frigate (5 month and 145ts of material required)
- Vaal entering the navy yard in Port Elizabeth in April 42. The tender will stay in the yard until June 42
- Gariep entering the navy yard in Port Elizabeth in April 42. The tender will stay in the yard until June 42

Scrapping

None


Destroyers

Completed Units

4x Hound-class torpedoboat (Type 26)
8x Reptile-class torpedoboat (Type 35)

8x Nymph-class destroyer (Type 21)
8x Nymph-class destroyer (Type 23)
16x Nymph-class destroyer (Type 27)
16x Nymph-class destroyer (Type 30)
8x Snake-class destroyer (Type 32)
8x Fish-class destroyer (Type 38)

8x Weapon-class large destroyer (Type 28)
7x Weapon-class large destroyer (Type 32)
4x Weapon-class large destroyer (Type 36)

On Trials

None

Ordered Units

None

Rebuilds/Refits/Repairs

None

Scrapping

None


Fleet Cruisers

Completed Units

5x Santa Fe-class light cruiser (Type 16)
4x Yaounde-class light cruiser (Type 19)
4x Libreville-class light cruiser (Type 21)
2x Rosario-class light cruiser (Type 22)
0x Aurora-class light cruiser (Type 24)
2x Arion-class light cruiser (Type 27)
3x Douala II-class light cruiser (Type 29)
2x Ajax-class light cruiser (Type 31)
1x Antenor-class light cruiser (Type 33)
2x Nampula II-class light cruiser (Type 36)
2x Charybdis-class light cruiser (Type 38)

2x Daphne-class anti aircraft cruiser (Type 34)
2x Danae-class anti aircraft cruiser (Type 36)

4x Fenris-class destroyer leader (Type 30)
2x Fasold-class destroyer leader (Type 31)
2x Diana-class destroyer leader (Type 34)

1x Lightning-class mine cruiser
1x Hedgehog-class mine cruiser

On Trials

2x CL22-class light cruiser
- San Lorenzo running trials until July 42
- Koumba running trials until July 42

Ordered Units

None

Repair/Refits/Rebuilds

2x CL24-class light cruiser (5 month and 395ts of material required)
- Bellona entering a Type 4 dock in Durban in February. Leaving the dock in March, the cruiser will stay in the yard until June 42
- Aurora entering a Type 2 dock in Durban in February. Leaving the dock in March, the cruiser will stay in the yard until June 42

Scrapping

None


Heavy Cruisers

Completed Units

4x Cape-class (Type 23)
2x Cape-class (Type 26)
1x Dragon-class (Type 29)
2x Hero-class (Type 33)
2x Vengeance-class

On Trials

None

Ordered Units

None

Repair/Refits

None

Scrapping

None


Capital Units

Completed Units

2x Mauritius-class
2x South Africa-class
0x Mocambique-class
2x Ophion-class
2x Triumph-class
2x Imperator-class
2x Radiance-class
2x Monarch-class

On Trials

1x BB37A-III-class battleship
- Thunderer running trials until August 42

Ordered Units

1x BB37A-III-class battleship (57 month á 838ts material required per unit)
- Superb laid down in Montevideo on a Type 4 slip in September 37, completed in May 42

2x BB37A-IV-class battleship (57 month á 835ts material required per unit)
- Implacable laid down in Durban on a Type 4 slip in April 38, completed in December 42
- Indomitable laid down in Port Elizabeth on a Type 4 slip in November 38, completed in July 43

Rebuilds/Refits

2x Mocambique-class battlecruiser (23 month and 783ts of material required)
- Mocambique entering a Type 4 dock in Cape Town in August 40. Leaving the dock in May 41, the battlecruiser will stay in the yard until June 42
- Rhodesia entering a Type 4 dock in Port Louis in December 40. Leaving the dock in September 41, the battlecruiser will stay in the yard until October 42

Scrapping

None


Coastal Defence Units

Completed Units

1x Nagelring-class coastal defence ship
1x Tyrfing-class coastal defence ship
1x Gungnir-class coastal defence ship
1x Excalibur-class coastal defence ship

1x LCDS-class
2x LCDS-2-class

On Trials

None

Ordered Units

1x LCDS-42-class light CDS for China (11 month á 180ts material required per unit)
- Unnamend laid down in Durban on a Type 2 slip in January 42, completed in November 42

Rebuilds/Refits

None


Carriers

Completed Units

0x Forge-class fleet carrier (Type 26)
2x TvD-class fleet carrier (Type 34)
1x Asgard-class fleet carrier (Type 37)

2x Anvil-class light fleet carrier (Type 30)
1x Endress-class light fleet carrier (Type 36)

1x Bölthorn-class floatplane carrier
2x Thjazi-class floatplane carrier
3x Unicorn-class floatplane carrier
2x Wyvern-class floatplane carrier

On Trials

None

Ordered Units

1x CV40B-class fleet carrier (33 month á 726ts material required per unit)
- Helspanth laid down in Durban on a Type 3 slip in April 40, completed in December 42

1x CV42C-class fleet carrier (40 month á 771ts material required per unit)
- Bahamuth laid down in Durban on a Type 4 slip in March 4, completed in June 45

Rebuilds/Refits

1x Forge-class fleet carrier (15 month and 666ts of material required)
- Forge entering a Type 4 dock in Montevideo in January 42. Leaving the dock in June 42, the fleet carrier will stay in the yard until March 43


Class A Submarines

Completed Units

1x F-class submarine
3x J-class submarine
2x L-class submarine
8x M-class submarine
8x O-class submarine
1x Q-class submarine

On Trials

1x Q-class fleet submarine
- Q2 running trials until August 42

Ordered Units

2x T-class fleet submarine (10 month á 95ts material required per unit)
- T7 laid down on Prince Eduard Islands on a Type 0 slip in January 42, completed in October 42
- T5 laid down in Daressalam on a Type 0 slip in April 42, completed in January 43

Repairs/Rebuilds/Refits

None

Scrapping

3x F-class submarine (4 month total, 1 month in Type 1 dock)
- F13 scrapping in Durban starting in September, finished in December 41 – 120ts received from hull for Q2/1942
- F14 scrapping in Durban starting in January, finished in April 42 – 120ts received from hull for Q4/1942
- F15 scrapping in Durban starting in May, finished in August 42 – 120ts received from hull for Q1/1943


Class B Submarines

Completed Units

7x K-class submarine
8x N-class submarine
4x P-class mine submarine

On Trials

3x P-class coastal mine submarine
- P3 running trials until April 42
- P8 running trials until August 42
- P5 running trials until September 42

2x K-class coastal mine submarine
- K1 running trials until August 42
- K7 running trials until August 42

Ordered Units

1x P-class coastal mine submarine (5 month á 100ts material required per unit)
- P7 laid down in Cape Town on a Type 1 slip in April 42, completed in August 42
- P5 laid down in Cape Town on a Type 1 slip in November 41, completed in March 42

1x R-class coastal submarine (5 month á 96ts material required per unit)
- R1 laid down in Cape Town on a Type 0 slip in May 42, completed in September 42

Repairs/Rebuilds/Refits

4x K-class submarine (2 month a 57ts of material required)
- K2 entering the navy yard in Montevideo in March 42. The submarine will stay in the yard until April 42
- K8 entering the navy yard in Montevideo in March 42. The submarine will stay in the yard until April 42
- K3 entering the navy yard in Montevideo in May 42. The submarine will stay in the yard until June 42
- K10 entering the navy yard in Montevideo in May 42. The submarine will stay in the yard until June 42

Scrapping

None


Landing Vehicles

Completed Units

1x LSC38-class landing ship (ex-AV22)
2x LSC39-class landing ship (ex-TD19)
2x LSA38-class landing ship
4x LST38-class landing ship
8x LSI38-class landing ship

On Trials

None

Ordered Units

None

Repairs/Rebuilds/Refits

None

Scrapping

None


Non-combatants

Completed Units

1x Bay-class tender (Type 04)
2x Bay-class tender (Type 05)
2x Bay-class tender (Type 08)
2x Bay-class tender (Type 11)
1x Bay-class tender (Type 13)
2x Bay-class tender (Type 16)
0x Bay-class tender (Type 22)
1x Bay-class tender (Type 25)
1x Bay-class tender (Type 29)
2x Bay-class tender (Type 35)

1x FV32-class fleet support ship
2x FV36-class fleet support ship

On Trials

2x TD22-class tender
- Table Bay running trials until April 42
- Walker Bay running trials until April 42

Ordered Units

2x TD42-class tender (14 month á 307ts material required per unit)
- TD42-1 laid down in Mar del Plata on a Type 1 slip in January 42, completed in February 43
- TD42-2 laid down in St. Helena on a Type 1 slip in January 42, completed in February 43

Repairs/Rebuilds/Refits

1x TD22-class tender (7 month and 237ts of material required)
- Saldanna Bay entering the navy yard in Daressalam in January 42. The tender will stay in the yard until July 42

1x TD25-class tender (3 month a 178ts of material required)
- Alexander Bay entering the navy yard in Buenos Aires in May 42. The tender will stay in the yard until July 42


--------------------------------------------------------------------------------------------------------------

At the end of this quarter the RSAN consists of (units in service only, units undergoing refits are not listed):

89 ASW launches
67 motor launches
50 motor torpedo boats
59 minesweepers
48 small patrol crafts
6 river gunboat
2 river monitors
95 TB/DD/DLs of less than 2,000ts
41 fleet cruisers
11 heavy cruisers
14 capital units
7 costal defence ships
6 aircraft carrier
8 floatplane carrier
25 submarines category a
19 submarines category b
17 landing vehicles
15 armed tenders
3 fleet support ship

plus numerous auxiliary vessels of all kind.