You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, May 18th 2012, 4:05am

Empire of Brazil Q2 1942

Q2 1942 Activity

Brazil
7/7 factories producing naval materials: 7000 tons created for Q2/42. 7000 total tons + 418 stockpiled from previous quarter + 0 tons from scrapping+ 3050 tons from transactions = 10468 tons

9010 tons used. 1458 tons left for Q3/42

0/7 factories committed for Quarter to infrastructure development = 0.0i.p.
0/7 factories committed for Year to infrastructure development

B. Infrastructure Development
0.1 ip to factory + 0.0

C1. Naval Construction

Rio de Janeiro:
Class 3 Slipway: SS B-6 laid down Q2/42, 1470/1470 tons required. 367t added Q2/42. 1103t needed.
Class 1 Slipway: DD-37 Santos de Espar laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: SS B-4 laid down Q1/42, 1103/1470 tons required. 368t added Q2/42. 735t needed.
Class 1 Slipway: SS B-5 laid down Q1/42, 1103/1470 tons required. 368t added Q2/42. 735t needed.
Class 1 Slipway: SS B-7 laid down Q2/42, 1470/1470 tons required. 367t added Q2/42. 1103t needed.
Class 3.5 Drydock: Scraping Salvador Class Destroyers
Class 3 Drydock: Scraping Sub Tender Ceará

Dockside: Idle

Macapa:
Class 1 Slipway: DD-38 Goiás II laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: DD-39 Onça II laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: DD-40 Leão II laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: DD-41 Rio Grande do Sul II laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: APA-1 Caridade laid down Q1/42, 1647/2195 tons required. 548t added Q1/42. 1099t needed.
Class 1 Slipway: SS B-8 laid down Q2/42, 1470/1470 tons required. 367t added Q2/42. 1103t needed.
Class 0 Drydock: Idle
Dockside: Idle

Manaus:
Class 0 Slipway: Idle
Class 0 Slipway: Idle
Class 0 Drydock: Idle
Class 0 Drydock: Idle

C2. Ships on shakedown cruises:

1st Three Months

BC Rio de Janeiro
DD-36 Gramamae

2nd Three Months

DD-35 Grande

D. Transactions

4560t to Greece for CV and SS
3050t from Argentina for Margay class DDs

E. Other Notes

Report may be updated for errors.

F. Updated Order of Battle-
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships 1(0)+0
Aircraft Carriers 1(1)+0
Battlecruisers 2(0)+0
Light Cruisers 12(0)+0
Destroyers 18(0)+5
Submarines 14(0)+4
Gunboats 0(0)+0
Minelayers 0(0)+0
Minesweepers 20(0)+0
Submarine Tender 0(0)+0
Collier 1(0)+0
Training Ship 1(0)+0
You smug-faced crowds with kindling eye
Who cheer when soldier lads march by,
Sneak home and pray you'll never know
The hell where youth and laughter go.
-Siegfried Sassoon