Q2 1942 Activity
Brazil
7/7 factories producing naval materials: 7000 tons created for Q2/42. 7000 total tons + 418 stockpiled from previous quarter + 0 tons from scrapping+ 3050 tons from transactions = 10468 tons
9010 tons used. 1458 tons left for Q3/42
0/7 factories committed for Quarter to infrastructure development = 0.0i.p.
0/7 factories committed for Year to infrastructure development
B. Infrastructure Development
0.1 ip to factory + 0.0
C1. Naval Construction
Rio de Janeiro:
Class 3 Slipway: SS B-6 laid down Q2/42, 1470/1470 tons required. 367t added Q2/42. 1103t needed.
Class 1 Slipway: DD-37 Santos de Espar laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: SS B-4 laid down Q1/42, 1103/1470 tons required. 368t added Q2/42. 735t needed.
Class 1 Slipway: SS B-5 laid down Q1/42, 1103/1470 tons required. 368t added Q2/42. 735t needed.
Class 1 Slipway: SS B-7 laid down Q2/42, 1470/1470 tons required. 367t added Q2/42. 1103t needed.
Class 3.5 Drydock: Scraping Salvador Class Destroyers
Class 3 Drydock: Scraping Sub Tender Ceará
Dockside: Idle
Macapa:
Class 1 Slipway: DD-38 Goiás II laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: DD-39 Onça II laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: DD-40 Leão II laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: DD-41 Rio Grande do Sul II laid down Q1/42, 1238/1650 tons required. 413t added Q2/42. 825t needed.
Class 1 Slipway: APA-1 Caridade laid down Q1/42, 1647/2195 tons required. 548t added Q1/42. 1099t needed.
Class 1 Slipway: SS B-8 laid down Q2/42, 1470/1470 tons required. 367t added Q2/42. 1103t needed.
Class 0 Drydock: Idle
Dockside: Idle
Manaus:
Class 0 Slipway: Idle
Class 0 Slipway: Idle
Class 0 Drydock: Idle
Class 0 Drydock: Idle
C2. Ships on shakedown cruises:
1st Three Months
BC Rio de Janeiro
DD-36 Gramamae
2nd Three Months
DD-35 Grande
D. Transactions
4560t to Greece for CV and SS
3050t from Argentina for Margay class DDs
E. Other Notes
Report may be updated for errors.
F. Updated Order of Battle-
Note: X (Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
Battleships 1(0)+0
Aircraft Carriers 1(1)+0
Battlecruisers 2(0)+0
Light Cruisers 12(0)+0
Destroyers 18(0)+5
Submarines 14(0)+4
Gunboats 0(0)+0
Minelayers 0(0)+0
Minesweepers 20(0)+0
Submarine Tender 0(0)+0
Collier 1(0)+0
Training Ship 1(0)+0