Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, May 5th 2006, 10:13am

Atlantis Q4/30

*corrected error in tonnage needed to complete D-22 class subs, originally listed as 992 tons needed, in fact 1,013 tons are needed*
A. Industrial Allocation

16/31 factories (non fixed) to naval materials: 16,000 tons created for Q4/1930 plus 55 tons stockpiled from Q3/30

Total warship materials: 16,055

15,752 tons used for ship building (15,752 for local builds, 0 for foriegn builds), 303 tons stockpiled for next quarter.

10/31 factories (fixed) to infrastructure development: 1.0 points for Q4/1930 plus 1.0 bonus points
5/31 factories (non fixed) to infrastructure development: 0.5 points for Q4/1930

Total: 2.5 infrastructure points created for Q4/30

B. Infrastructure Development

New factory #31, completed as of end of Q3/30
0.4 points transfered to Turkey
0.4 points transfered to Chile for factory project
0.3 points transfered to Byzantium
1.4 points for two type 1 slips begining construction at Eridanus

C. Naval Construction

At Cleito

Class 4 Slip #1 - Battleship Memnon building, 38,537 tons needed, 19,000 tons used, 2,000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - Idle
Class 4 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - D-22 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #2 - D-23 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #3 - D-24 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #4 - D-25 building, 1,013 tons needed, 732 tons used, 260 tons added


At Eridanus

Class 4 Slip #1 - Battleship Philomedes building, 38,537 tons needed, 19,000 tons used, 2,000 tons added
Class 4 Slip #2 - Idle
Class 4 Drydock #1 - DD's Upbeat, and Upset refiting, 584 tons used (292 tons per ship)
Class 4 Drydock #2 - DD's Upstage, and Ultar refiting, 584 tons used (292 tons per ship)
Class 2 Slip #1 - Idle
Class 2 Drydock #1 - CLS Erastius scrapping
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - begins construction, 1.0 points needed, 0.7 points added
Class 1 Slip #4 - begins construction, 1.0 points needed, 0.7 points added

Free floating: CV Siboney converting to training carrier, 3,222 tons needed, 3,043 tons used, 179 tons added

At Duecalion

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1- Unerring, and Undying refiting, 584 tons used (292 tons per ship)
Class 2 Slip #1 - Escort cruiser Torto laid down, 5,718 tons needed, 3,018 tons used, 1,500 tons added
Class 2 Slip #2 - Idle
Class 2 Drydock #1 - CLS Cassius scrapping
Class 0 slip #1 - submarine D-26 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 slip #2 - submarine D-27 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 slip #3 - submarine D-28 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 slip #4 - completed

CA Apollo completed, 10,839 tons needed, 10,839 tons used
TAC Cape Verde completed, 8,703 tons needed, 8,703 tons used


At Illissus type 3 port (7/7)

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - DD's Unnerve and Unswerving refiting, 584 tons used (292 tons per ship)
Class 2 Slip #1 - Escort cruiser Aaxte building, 5,718 tons needed, 3,018 tons used, 1,500 tons added
Class 2 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - submarine D-29 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #2 - submarine D-30 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #3 - submarine D-31 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #4 - submarine D-32 building, 1,013 tons needed, 732 tons used, 260 tons added

CA Hector completed, 10,839 tons needed, 10,839 tons used
CL Hydra rebuild completed, 3610 tons needed, 3610 tons used
Battleship Tyrrhenia refitting, 4,510 tons needed, 3,510 tons used, 1,000 tons added


At Phelleus type 5 port (9/11)

Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Drydock #1 - Idle
Class 3 Drydock #2 - Idle
Class 5 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - submarine D-33 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #2 - submarine D-34 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #3 - submarine D-35 building, 1,013 tons needed, 732 tons used, 260 tons added
Class 0 Slip #4 - submarine D-36 building, 1,013 tons needed, 732 tons used, 260 tons added

TAC Venezuela completed, 8,703 tons needed, 8,703 tons used
CL Chimera rebuild completed, 3610 tons needed, 3610 tons used

At Lycabettus type 4 port (8/9)

Class 2 Slip #1 - Idle
Class 2 Slip #2 - Polar exploration ship Adventure building, 16,393 tons needed, 8,914 tons used, 1,000 tons added (private funds)
Class 2 Drydock #1 - Idle
Class 2 Drydock #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 -
Class 1 Slip #3 -
Class 1 Slip #4 -
Class 1 Drydock #1 - Idle



At Maracaibo type 3 port (5/7)

Class 3 Drydock #1 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - 2 type 1 motor launch/minelayers building
Class 0 Slip #1 - 2 MTB's building
Class 0 Slip #2 - 2 MTB's building
Class 0 Slip #3 - Idle
Class 0 Slip #4 - submarine D-37 building, 1,013 tons needed, 732 tons used, 260 tons added


At Safi type 2 port (4/5)

Class 2 Drydock #1 - Idle
Class 1 Slip #1 - 3 type 1 motor launches/minelayers building
Class 1 Slip #2 - 3 type 1 motor launches/minelayers building
Class 1 Drydock #1 - 3 MTB's building
Class 0 Slip #1 - 2 MTB's building
Class 0 Slip #2 - 2 MTB's building
Class 0 Slip #3 - 2 MTB's building
Class 0 Slip #4 - 2 MTB's building


Launched ships/freefloating ships being completed:

MS-26 to 41 on trials
Battleship Tyrrhenia refitting at Illissus, 1,000 tons used
Aircraft Carrier Siboney refitting, at Eridanus, 179 tons used
DD's Upbeat, Upset, Upstage, Ultar, Unerring, Undying, Unnerve and Unswerving refiting at Eridanus, Duecalion and Illissus, 292 tons used per ship, 2,336 tons used total


Ships completed and on trials

Training Cruisers Cape Verde and Venezuela complete rebuild, begin trials
CL's Hydra and Chimera complete rebuild, begin trials
CL's Cerasus, Ithica, Orestes, Atreus complete trials
2 Lamia class Airship Tenders complete trials



Summary of ship building/repairs/rebuilds and convertions.

2 memnon class battleships building (4,000 tons)
Battleship Tyrrhenia refitting (1,000 tons)
CV Siboney rebuilding (179 tons)
2xTorto class CAE's building (3,000 tons)
Polar exploration ship Adventure building (private funds)
16xR-74 class subs (4,160 tons)
8 Admiralty class DD's refiting (2,336 tons)
15 MTB-1 class Motor torpedo boats built ( 525 tons)
8 motor launch/minelayers built (544 tons)

D. Transactions

0.4 IP's transfered to Turkey from Atlantis as part of territorial concessions to Byzantium, total to be transfered 6.8 IP's to pay for one Type 3 drydock (4 IP's), one type 1 drydock (2 IP's) and one factory with 0.8 IP's used in Istambul/Constantinople

1.6 IP's transfered as of this quarter


E. Other Notes

OOC: Polar exploration vessel project taken over by private owner, will launch once 70% complete to free up yard space, funds are no longer from navy but will be listed to show building progress.

Four tankers purchased by Atlantean navy, each displacing 12,268 tons, ships have been re-named Apure, Arauco, Caura, Orinoco

CL's Erastius and Cassius begin scrapping

F. Updated Order of Battle, 1/1/28

Note: X(Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Battleships:............................8(1)2
Battlecruisers:........................2(0)0
CV:........................................3(0)0
BBT:......................................1(0)0
CVT:......................................0(1)0
TAC:......................................2(0)0
CA:........................................12(0)0
Escort Cruisers:......................0(0)2
CL:........................................53(0)0 * Erastius and Cassius scraping
DD: type A.............................16(0)0
DD: type B.............................128(8)0 (plus 6 inactive)
Torpedo boats:........................N/A
Sloops:...................................N/A
Frigates:.................................N/A
Moniters:................................2(0)0
Fleet Submarine:.....................20(0)16
Coastal Submarine:.................72(0)0
Torpedo gunboats:...................32(0)0
Gunboats:...............................12(0)0
Patrol vessels:........................50(0)0
Mine sweepers:.......................24 (0) 0
Mine warfare vessels:...............16(0)0
Sub chasers:..........................312(0)0
Coastal Motor Torpedo Boats:..120(0)0
Motor Torpedo Boats:..............65(0)15
Motor Launchs:....................100(0)0
Motor Launchs/minlayers:......12(0)8
Floatplane carrier/tenders:........2(0)0
Airship tenders:.......................2(0)0
Blimp carrier/tenders:...............2(0)0
Destroyer depot ships:.............2(0)0
Submarine depot ships:...........4(0)0
Repair ships:..........................2(0)0
Transports:.............................10(0)0
Landing Craft Infantry:..............80(0)0
Infantry launches:....................38(0)0

2

Friday, May 5th 2006, 10:13am

Byzantium Q3/30

A. Industrial Allocation

0.3 points transfered from Atlantis

B. Infrastructure Development

Factory #1, 1.1 points used, 0.3 points added

C. Naval Construction

Constantinople

type 3 drydock #1 - Idle
type 1 drydock #1 - Idle

Launched ships being completed:

none

Ships completed and on trials

none

Summary of ship building/repairs/rebuilds and convertions.

none

D. Transactions

Incomplete factory transfered to Byzantine control from Turkey, 9.2 points to be transfered, 1.4 points transfered as of Q1/31

E. Other Notes

none

F. Updated Order of Battle, 1/10/29

Note: X(Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.

Capital ships: 0(0)0
Cruisers: 0(0)0
Destroyers: 0(0)0
Torpedo boats: 0(0)0
escorts: 0(0)0
Gunboats 0(0)0
Patrol vessels 0(0)0
Mine warfare ships 0(0)0
Sub chasers 12(0)0 transfered from Atlantis (count as Atlantean tonnage under CT)
Motor Launches 0(0)0
Submarines: 0(0)0
Depot ships: 0(0)0
Auxillary's: 0(0)0

3

Friday, May 5th 2006, 10:19am

Apure, Atlantean Tanker laid down 1927, purchased in 1930

Ships in class Apure, Arauco, Caura, Orinoco

Displacement:
11,980 t light; 12,268 t standard; 14,418 t normal; 16,137 t full load

Dimensions: Length overall / water x beam x draught
468.94 ft / 456.00 ft x 62.00 ft x 27.25 ft (normal load)
142.93 m / 138.99 m x 18.90 m x 8.31 m

Machinery:
Oil fired boilers, complex reciprocating steam engines,
Geared drive, 2 shafts, 6,831 ihp / 5,096 Kw = 15.00 kts
Range 10,000nm at 15.00 kts
Bunker at max displacement = 3,869 tons

Complement:
657 - 855

Cost:
£1.724 million / $6.897 million

Distribution of weights at normal displacement:
Armament: 0 tons, 0.0 %
Machinery: 392 tons, 2.7 %
Hull, fittings & equipment: 7,588 tons, 52.6 %
Fuel, ammunition & stores: 2,438 tons, 16.9 %
Miscellaneous weights: 4,000 tons, 27.7 %

Overall survivability and seakeeping ability:
Survivability (Non-critical penetrating hits needed to sink ship):
31,898 lbs / 14,469 Kg = 295.3 x 6 " / 152 mm shells or 4.7 torpedoes
Stability (Unstable if below 1.00): 1.01
Metacentric height 2.5 ft / 0.8 m
Roll period: 16.5 seconds
Steadiness - As gun platform (Average = 50 %): 61 %
- Recoil effect (Restricted arc if above 1.00): 0.00
Seaboat quality (Average = 1.00): 1.85

Hull form characteristics:
Hull has a flush deck
Block coefficient: 0.655
Length to Beam Ratio: 7.35 : 1
'Natural speed' for length: 21.35 kts
Power going to wave formation at top speed: 33 %
Trim (Max stability = 0, Max steadiness = 100): 33
Bow angle (Positive = bow angles forward): 10.00 degrees
Stern overhang: 8.00 ft / 2.44 m
Freeboard (% = measuring location as a percentage of overall length):
- Stem: 28.00 ft / 8.53 m
- Forecastle (20 %): 18.00 ft / 5.49 m
- Mid (50 %): 18.00 ft / 5.49 m
- Quarterdeck (15 %): 18.00 ft / 5.49 m
- Stern: 22.00 ft / 6.71 m
- Average freeboard: 19.10 ft / 5.82 m

Ship space, strength and comments:
Space - Hull below water (magazines/engines, low = better): 40.3 %
- Above water (accommodation/working, high = better): 113.5 %
Waterplane Area: 21,757 Square feet or 2,021 Square metres
Displacement factor (Displacement / loading): 301 %
Structure weight / hull surface area: 216 lbs/sq ft or 1,053 Kg/sq metre
Hull strength (Relative):
- Cross-sectional: 2.43
- Longitudinal: 4.62
- Overall: 2.59
Hull space for machinery, storage, compartmentation is excellent
Room for accommodation and workspaces is adequate
Excellent seaboat, comfortable, rides out heavy weather easily