German Naval Developments - Q4/24
A. Industrial Allocation
4/11 factories produce 4000 t of warship materials, with a stockpile of 471 t for a total of 4,471 t. Of this, 3,004 t are used for construction programs. A stockpile of 1,467 t are carried over.
6/11 factories are committed to manufacturing naval infrastructure materials, producing 0.6 pts. They also produce 0.6 bonus points this quarter.
1/11 factories produces infrastructure materials but is not committed. 0.1 pts are produced, for a total of 1.3 overall.
B. Infrastructure Development
Factory 12 receives 1.3 pts, for a total of 8.2 pts.
C. Naval Construction
At Wilhelmshaven
1 Type 2 drydock: Idle
1 Type 1 slip: AM
R-9 receives 319 t, launched 31/10/24
1 Type 0 slip: Idle
1 Type 0 slip: Idle
1 Type 0 drydock: Idle
Free-floating: AM
R-7 receives 105 t, completes 31/10/24
At Bremerhaven
1 Type 2 slip: DD
Z-205 receives 426 t, launched 15/11/24
1 Type 1 slip: AM
R-10 receives 319 t, launched 31/10/24
1 Type 1 drydock: Idle
1 Type 0 slip: Idle
Free-floating: DD
Z-203 receives 214 t, completes 15/11/24
At Cuxhaven
1 Type 3 slip: Idle
1 Type 3 drydock: Idle
1 Type 2 slip: Idle
1 Type 1 slip: Idle
1 Type 0 slip: Idle
Free-floating: AM
R-8 receives 319 t
At Kiel
1 Type 2 slipway: Idle
1 Type 2 drydock: Idle
1 Type 1 slips: DD
Z-206 laid down, receives 426 t.
1 Type 1 drydock: Idle
2 Type 0 slips: Idle
1 Type 0 drydock: Idle
Free-floating: DD
Z-204 receives 426 t
Commercial shipyard at Kiel builds three 150 t coastal submarine chaser.
D. Transactions
None
E. Other Notes
CL
Karlsruhe , patrol boat
VP-6 complete shake-down cruises.
CL
Konigsberg , minesweepers
R-5 and
R-6 continue shake-down cruises
DD
Z-203 , minesweeper
R-7 begin shake-down cruise.
Torpedoboat
V-1 deleted from service 1/11/24, expended as target in live-fire exercise 15/12/24.
New Orders: 1 destroyer.
F. Updated Order of Battle, 31/12/24
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 3(0)+0
PD: 3(0)+0
CL: 12()+0
DD: 24(0)+3
SL: 6(0)+0
AM: 7(0)+3
Note: PD = pre-dreadnought