Danish Naval Developments Q2 1930
a/ Industrial Allocation
9/11 factories producing materiel for shipbuilding = 9000 tons
2/11 factories (fixed) producing infrastructure materiel =0.2 pts
0/11 Factories producing infrastructure materiel = 0.0 points
b/ Infrastructure Development
Dry Dock No.1 (Type 2) at Copenhagen extending to Type 3 receives 0.2 IP = Total 0.4 IP points, 0.6 IP points to complete
c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Kára, CL, laid down 02/01/30, receives 1,170 tons, balance 3,412 tons
No.2 type 2 slip – Sváva, CL, laid down 02/04/30, receives 1,170 tons, balance 4,582 tons
No.3 type 1 slip – Carnation, SL, laid down 02/01/30, receives 349 tons, balance 486 tons
No.4 type 1 slip – Bluebell, , SL, laid down 02/01/30, receives 349 tons, balance 486 tons
No.1 type 2 drydock – EXTENDING
Dock side – Idle
Dock side – Gunnr, CL, laid down 02/04/29, receives 1,072 tons to complete
Aarhus-
No.1 type 3 slip – Róta, CL laid down 01/10/29, receives 1170, balance 2,242 tons
No.2 type 2 slip – Idle
No.3 type 1 slip – Lake (g), GB, laid down 02/04/1930, receives 283 tons, balance 133 tons
No.4 type 1 slip – Lake (h), GB, laid down 02/04/1930, receives 283 tons, balance 133 tons
No.1 type 3 drydock – Idle
No.2 type 2 drydock – Idle
Dock side – Lake (c), GB, laid down 02/01/1930, receives 133 tons to complete
Dock side – Lake (d), GB, laid down 02/01/1930, receives 133 tons to complete
Aalborg-
No.1 type 1 slip – Tulip, SL, laid down 01/10/29, receives 349 tons, balance 137 tons
No.2 type 1 slip – Daffodil, SL, laid down 01/10/29, receives 349 tons, balance 137 tons
No.3 type 1 slip – Bille, MWS, laid down 15/05/1930, receives 245 tons, balance 555 tons
No.4 type 1 slip - Sommerfugl, MWS, laid down 15/05/1930, receives 245 tons, balance 555 tons
Dock side – Myre, MWS, laid down 02/01/1930, receives 245 tons, balance 310 tons
Dock side – Bi, MWS, laid down 02/01/1930, receives 245 tons, balance 310 tons
Bangkok-
No.1 type 1 slip – Sunflower, SL, laid down 02/06/30, receives 349 tons, balance 835 tons
No.2 type 0 slip – Lake (e), GB, laid down 02/01/1930, receives 283 tons, balance 133 tons
No.3 type 0 slip – Lake (f), GB, laid down 02/01/1930, receives 283 tons, balance 133 tons
No.1 type 2 drydock –Idle
Dock side – Lake (a), GB, laid down 02/01/1930, receives 133 tons to complete
Dock side – Lake (b), GB, laid down 02/01/1930, receives 133 tons to complete
Dock side – Marigold, SL, laid down 02/01/30, receives 349 tons, balance 486 tons
d/ Transactions
None
e/ Other Notes
KDM Brynhildr commissions on 28/04/1930
KDM Rose commissions on 02/05/1930
KDM Lily commissions on 02/05/1930
KDM Violet commissions on 02/05/1930
KDM Daisy commissions on 02/05/1930
KDM Tyr continues sea trials until 26/07/1930
KDM Vali continues sea trials until 08/08/1930
KDM Sigrdrifa continues sea trials until 16/09/1930
KDM Gunnr commences sea trials on 18/06/1930
KDM (Lake(a) commences sea trials on 14/05/1930
KDM (Lake(b) commences sea trials on 14/05/1930
KDM (Lake(c) commences sea trials on 14/05/1930
KDM (Lake(d) commences sea trials on 14/05/1930
Tonnage from scrapping = 0 tons
Tonnage Carried Over From This Quarter = 186 tons
f/ Order of Battle
Note:
Y)+Z = In Service (under repair/refit) + building/on order (breaking)
BB = 01 (0) + 2/0 (0)
AC = 00 (0) + 0/0 (0)
CDS = 00 (0) + 0/0 (0)
CA = 02 (0) + 0/0 (0)
CL = 13 (0) + 5/0 (0)
CV(X) = 01 (0) + 0/0 (0)
DD = 26 (0) + 0/0 (0)
SL = 07 (0) + 6/0 (0)
FR = 00 (0) + 0/0 (0)
GB = 13 (0) + 8/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 19 (0) + 0/0 (0)
MWS = 07 (0) + 4/0 (0)
AMC = 01 (0) + 0/0 (0)
Note: FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)