You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Thursday, May 20th 2004, 1:31am

Denmark, Quarter 2, 1923

Danish Naval Developments Q2 1923

a/ Industrial Allocation
6/10 factories producing materiel for shipbuilding =6000 tons
4/10 factories (fixed) producing infrastructure materiel = 0.4 points

b/ Infrastructure Development
No.1 type 2 slip at Copenhagen receives 0.2 points, total = 0.4, being extended to type 3
No.1 type 2 drydock at Aarhus receives 0.2 points, total = 0.4, being extended to type 3

c/ Naval Construction
Copenhagen-
No.1 type 2 slip -
Extending, receiving 0.2 points
No.2 type 2 slip -
Idle
No.3 type 1 slip -
D17,DD, laid down 02/01/23, receives 528 tons, balance 864 tons
No.4 type 1 slip -
D19,DD, laid down 02/04/23, receives 528 tons, balance 1392 tons
No.1 type 2 drydock -
Idle
Dock side –
Bornholm, receives 534 tons to complete, commences sea trials 09/01/23
Falster, receives 534 tons to complete, commences sea trials 14/01/23

Aarhus-
No.1 type 3 slip –
Hel, CA, laid down 02/01/23, receives 1768 tons, balance 9369 tons
No.2 slip –
Mon, CL, laid down 15/01/23, receives 1334 tons, balance 4536 tons
No.3 slip –
Idle
No.4 slip –
Idle
No.1 drydock –
Extending, receiving 0.2 points
No.2 drydock –
Idle

Aalborg-
No.1 type 1 slip –
F.1, Frigate, laid down 01/02/23, receives 319 tons, balance 552 tons
No.2 type 1 slip –
F.2, Frigate, laid down 01/02/23, receives 319 tons, balance 552 tons

No.3 type 0 slip –
Humelbi, MWS, laid down 02/04/23, receives 234 tons, balance 526 tons
No.4 type 0 slip –
Hveps, MWS, laid down 02/04/23, receives 234 tons, balance 526 tons

Bangkok-
No.1 type 1 slip –
D18, DD, laid down 02/01/23, receives 480 tons, balance 960 tons
No.2 type 0 slip –
Gedehams, MWS, laid down 02/04/23, receives 234 tons, balance 526 tons
No.3 type 0 slip –
Idle
No.1 type 2 drydock –
Idle

d/ Transactions
60 tons of naval materiel transferred to Ansaldo of Italy
for 4 x Small Torpedo Craft at 15 tons each

e/ Other Notes
New Orders – 1 X DD, 3 X MWS
KDM Loki commissioned on 26/02/23
KDM Bornholm conducting sea trials until 08/07/23
KDM Falster conducting sea trials until 15/07/23

Tonnage Carried Over From This Quarter = 86

f/ Order of Battle
Note: X(Y)+Z = completed (under repair/refit) + building/on order

PD = 01 (0) + 0/0
AC = 02 (0) + 0/0
CDS = 05 (0) + 0/0
CA = 00 (0) + 1/0
CL = 08 (0) + 3/0
DD = 16 (0) + 3/0
FR = 00 (0) + 2/0
TB = 20 (0) + 0/0
STC = 04 (0) + 0/4
SUB = 11 (0) + 0/0
MWS = 03 (0) + 3/0
AMC = 01 (0) + 0/0

Note: PD = Pre-Dreadnought
FR = Frigate
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)


And this time I got it right......I hope!

Nope, didn't ....D18 in Bangkok, not D17!!!DOH!!!

2

Thursday, May 20th 2004, 7:26am

I usually find the errors when I am creating the report of the next Quarter.

Walter

3

Thursday, May 20th 2004, 8:29am

Ditto...I found yet another error on my last report, thankfully it was easy to fix and all I needed to do was add one more quarter's worth of construction to 2 of my ships.

4

Thursday, May 20th 2004, 10:11am

You said it!!
Found it as I was doing Q2!!