Industrial Allocation
0/15 factories producing 0t materials.
15/15 factories producing 1.5 infrastructure. (non-dedicated)
0/15 Factories producing infrastructure. (dedicated)
2,637t from stockpile.
Ot from transactions.
Ot from scraping.
2637t Total materials available
2264 Used
373t Stored
Infrastucture Development
Attica:
- 0.5 IP added to the upgrade of a Type 2 Slipe to a Type 2.5 at Attica. - 0.5 instaled, 0 remaining.
Thessaloniki:
- 0.5 IP added to the upgrade of a Type 0 Slipe to a Type 0.5 at Attica. 0.5 instaled, 0 remaining.
- 0.5 IP added to the upgrade of a Type 0 Slipe to a Type 0.5 at Attica. 0.5 instaled, 0 remaining.
Naval Construction
Attica:
Type 3 Dry-Dock #1 -
Type 3 Dry-Dock #1 -
Type 2 Drydock #1 - Ares Class Light Cruiser Ares; laid down April 1st, 1940. 2162,5 tons required. 491 tons added. In Q1/1949 for a total of 491/ 2162,5 tons. 1671/ 2162,5 tons remaining.
Type 2 Slipe #1 -
Type 2 Slip #2 - Tiriis Class Light Cruiser Tiriis; laid down january 15tht, 1949. 7425 tons required. 453 tons added. In Q1/1949 for a total of 453/7425 tons. 6972/7425 tons remaining. Launched July 1st, 1949. Completed April 1st, 1950.
Type 2 Slip #3 - Tiriis Class Light Cruiser Tetríreis; laid down january 15tht, 1949. 7425 tons required. 453 tons added. In Q1/1949 for a total of 453/7425 tons. 6972/7425 tons remaining. Launched July 1st, 1949. Completed April 1st, 1950.
Type 1 Slip #1 - Nemea Class destroyer Nemea; laid down january 1st, 1949. 2082 tons required. 188 tons added. In Q1/1949 for a total of 188/2082 tons. 1894/2082 tons remaining. Launched april 15th, 1949. Completed november 1st, 1949.
Type 0 Slipe #1 -
Type 0 Slipe #1 -
Dockside:
Paros:
Type 1 Dry-Dock #1 -
Type 0 Dry-Dock #1 -
Dockside:
Patra:
Type 1 Dry-Dock #1 -
Type 1 Slip #1 - Nemea Class destroyer Nemesis; laid down january 1st, 1949. 2082 tons required. 188 tons added. In Q1/1949 for a total of 188/2082 tons. 1894/2082 tons remaining. Launched april 15th, 1949. Completed november 1st, 1949.
Type 0 Dry-Dock #1 -
Dockside:
Salamis:
Type 1 Dry-Dock #1 -
Dockside:
Souda Bay:
Type 4 Dry-Dock #1 -
Type 3 Dry-Dock #1 -
Type 2 Slipe #1 -
Type 2 Drydock #1 - Ares Class Light Cruiser Apollo; laid down April 7th, 1941. 2162,5 tons required. 491 tons added. In Q1/1949 for a total of 491/ 2162,5 tons. 1671/ 2162,5 tons remaining.
Type 1.5 Dry-Dock #1 -
Type 1.5 Dry-Dock #1 -
Type 1.5 Dry-Dock #1 -
Dockside:
Thessaloniki:
Type 2 Dry-Dock #1 -
Type 0 Dry-Dock #1 -
Type 0 Slipe #1 -
Type 0 Slipe #1 -
Dockside:
Volos:
Type 1 Dry-Dock #1 -
Dockside:
Limassol:
Type 3 Dry-Dock #1 -
Type 1 Dry-Dock #1 -
Order of Battle (Greek Navy) Q1 1949
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Fleet Combatants
Battleships 5(0)+0
Heavy Cruisers 4(0)+0
Medium Cruisers 2(0)+0
Light Cruisers 19(2)+2
Aircraft Carriers 1(0)+0
Flotilla Leaders 4(0)+0
Class "A" Destroyers 45(0)+2
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 17(0)+0
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 24(0)+0
Small Combatants
Subchasers (150t) 56(0)+0
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (200t) 30(0)+0
Harbour Launches (65t) 21(0)+0
Mtb 96(0)+0
Mgb 27(0)+0
Mms 22(0)+0
Auxiliaries
Special Transports 5(0)+0
Large Landing Craft (200t) 52(0)+0
Small Landing Craft (65t) 16(0)+0
Tenders 4(0)+0
Fleet Train 10(0)+0
Fleet Tugs 6(0)+0
Harbour Tugs 0(0)+0
Training Squadron
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0