German Naval Construction Programme, Second Quarter, 1945
A. Factories
Factories: 31
Available: 31
Producing Warship Material: 29
Tonnage Produced: 29,000
Producing Infrastructure (Committed): 2
Producing Infrastructure (Non - Committed):
Infrastructure Points Produced: 0.2
Bonus IP for Committed Factories: 0.0
Total IP Available: 0.2
Tonnage Produced: 29,000
Tonnage Transferred In:
Tonnage Received in Payment: 1,800
Tonnage Reclaimed From Scrap: 0
Tonnage Previously Stockpiled: 7,097
Total Tonnage Available: 37,897
Tonnage Transferred Out:
Tonnage Paid:
Tonnage Used in Construction: 28,629
Tonnage Remaining for Stockpile: 9,268
B. Infrastructure Development
Infrastructure Project -:- IP Req -:- IP Added -:- IP To Date -:- IP Remain
Expand Kiel S3 from Type 1.0 to Type 2.0 -:- 1.00 -:- 0.20 -:- 0.40 -:- 0.60
C. Naval Development and Construction
Bremerhaven
Dock Nr.1 - Type 3.0 – Scrap submarines U-31, U-32 and U-33; commenced 1 April 1945, entered dock 25 April 1945; demolition complete 11 May 1945
Slip Nr.1 - Type 3.0 – Idle
Slip Nr.2 – Type 1.0 – Destroyer Allenstein – Laid down 1 January 1945; requires 2,200 tons; 550 tons previously consumed; receives 550 tons; 1,100 tons remaining; Launched 15 May 1945
Slip Nr.3 – Type 1.0 – Destroyer Hirschberg – Laid down 1 January 1945; requires 2,200 tons; 550 tons previously consumed; receives 550 tons; 1,100 tons remaining; Launched 15 May 1945
Pierside:
Aircraft carrier Großer Kurfürst - Launched 1 December 1943; requires 18,764 tons; 18,090 tons previously consumed; receives 674 tons; 0 tons remaining; Completed 14 April 1945 and commences trials
Aircraft carrier Karl der Große – Launched 19 December 1944; requires 18,764 tons; 10,050 tons previously consumed; receives 2,010 tons; 6,704 tons remaining
Cuxhaven
Dock Nr.1 - Type 4.0 – Scrapping of Escorts Vp27, Vp28, Vp29 and Vp30; commenced 1 April 1945, entered dock 23 April 1945; demolition complete 9 May 1945
Dock Nr.2 - Type 2.0 – Idle
Slip Nr.1 – Type 4.0 – Idle
Slip Nr.2 – Type 2.0 – Idle
Slip Nr.3 – Type 1.0 – Destroyer Gumbinnen – Laid down 1 January 1945; requires 2,200 tons; 550 tons previously consumed; receives 550 tons; 1,100 tons remaining; Launched 15 May 1945
Slip Nr.4 – Type 1.0 – Destroyer Schweidnitz – Laid down 1 January 1945; requires 2,200 tons; 550 tons previously consumed; receives 550 tons; 1,100 tons remaining; Launched 15 May 1945
Pierside:
Aircraft carrier Friedrich der Große – Launched 1 December 1943; requires 18,764 tons; 18,090 tons previously consumed; receives 674 tons; 0 tons remaining; Completed 14 April 1945 and commences trials
Aircraft carrier Friedrich Barbarossa – Launched 19 December 1944; requires 18,764 tons; 10,050 tons previously consumed; receives 2,010 tons; 6,704 tons remaining
Frigate Rangersdorf – Launched 31 October 1944; requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 25 May 1945 and commences trials
Hamburg
Slip Nr.1 – Type 2.0 – Submarine Store – Laid down 1 January 1945; requires 1,720 tons, 440 tons previously consumed; receives 440 tons, 840 tons remaining; Launched 11 May 1945
Slip Nr.2 – Type 2.0 – Submarine Tarpune – Laid down 1 January 1945; requires 1,720 tons, 440 tons previously consumed; receives 440 tons, 840 tons remaining; Launched 11 May 1945
Slip Nr.3 – Type 1.0 – Buoy Tender Dänholm – Laid down 1 January 1945; requires 1,105 tons, 280 tons previously consumed; receives 280 tons, 545 tons remaining; Launched 3 May 1945
Slip Nr.4 – Type 1.0 – Buoy Tender Mährens – Laid down 1 January 1945; requires 1,105 tons, 280 tons previously consumed; receives 280 tons, 545 tons remaining; Launched 3 May 1945
Pierside
Minesweeper Hallstättersee – Launched 21 November 1944; requires 612 tons, 540 tons previously consumed; receives 72 tons, 0 tons remaining; Completed 12 May 1945
Minesweeper Wörthersee – Launched 21 November 1944; requires 612 tons, 540 tons previously consumed; receives 72 tons, 0 tons remaining; Completed 12 May 1945
Kiel
Dock Nr.1 – Type 4.0 – Aircraft Carrier Tegetthoff; Laid down 1 January 1945; requires 28,194 tons, 2,340 tons previously consumed; receives 2,340 tons, 23,514 tons remaining
Dock Nr.2 – Type 2.5 – Light Cruiser Stettin; Laid down 1 January 1945; requires 10,500 tons, 1,510 tons previously consumed; receives 1,510 tons, 7,530 tons remaining
Dock Nr.3 – Type 2.0 – Idle
Dock Nr.4 – Type 0.0 – Idle
Slip Nr.1 – Type 4.0 – Aircraft Carrier Zeiten; Laid down 1 January 1945; requires 28,194 tons, 2,340 tons previously consumed; receives 2,340 tons, 23,514 tons remaining
Slip Nr.2 - Type 3.0 – Idle
Slip Nr.3 – Type 1.0 – Expanding to Type 2.0
Slip Nr.4 – Type 1.0 – Submarine Schwertfisch – Laid down 1 January 1945; requires 1,720 tons, 440 tons previously consumed; receives 440 tons, 840 tons remaining; Launched 11 May 1945
Slip Nr.5 – Type 1.0 – Submarine Forellen – Laid down 1 January 1945; requires 1,720 tons, 440 tons previously consumed; receives 440 tons, 840 tons remaining; Launched 11 May 1945
Pierside
Light Cruiser Dresden – Launched 7 September 1944; requires 10,500 tons, 7,550 tons previously consumed; receives 1,510 tons, 1,490 tons remaining
Light Cruiser Stuttgart – Launched 9 March 1945; requires 10,500 tons, 4,530 tons previously consumed; receives 1,510 tons, 4,510 tons remaining
Frigate Großpetersdorf – Launched 31 October 1944; requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 25 May 1945 and commences trials
Frigate Sulzbach – Launched 31 October 1944; requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 25 May 1945 and commences trials
Frigate Gromitz – Launched 31 October 1944; requires 1,950 tons, 1,500 tons previously consumed; receives 450 tons, 0 tons remaining; Completed 25 May 1945 and commences trials
Wilhelmshaven
Dock Nr.1 - Type 3.0 – Scrap submarines U-34, U-35 and U-36; commenced 1 April 1945, entered dock 25 April 1945; demolition complete 11 May 1945
Dock Nr.2 – Type 0.0 – Idle
Slip Nr.1 – Type 1.0 – Idle
Slip Nr.2 – Type 0.5 – Submarine Haifisch – Laid down 1 January 1945; requires 1,720 tons, 440 tons previously consumed; receives 440 tons, 840 tons remaining; Launched 11 May 1945
Slip Nr.3 – Type 0.5 – Submarine Speerfisch – Laid down 1 January 1945; requires 1,720 tons, 440 tons previously consumed; receives 440 tons, 840 tons remaining; Launched 11 May 1945
Pierside:
Vacant
Vienna:
Dock Nr.1 – Type 0.0 – Idle
Slip Nr.1 – Type 0.0 – Idle
Memel:
Dock Nr.1 – Type 1.0 – Corvette Albatros – Laid down 1 January 1945; requires 1,000 tons, 270 tons previously consumed; receives 270 tons, 460 tons remaining; Launched 3 May 1945
Slip Nr.1 – Type 1.0 – Corvette Mowe – Laid down 1 January 1945; requires 1,000 tons, 270 tons previously consumed; receives 270 tons, 460 tons remaining; Launched 3 May 1945
Slip Nr.2 – Type 0.0 – Idle
Slip Nr.3 – Type 0.0 – Idle
Pierside:
Vacant
Flensburg:
Slip Nr.1 – Type 1.0 – Corvette Bussard – Laid down 1 April 1945; requires 1,000 tons, 0 tons previously consumed; receives 270 tons, 730 tons remaining
Slip Nr.2 – Type 1.0 – Corvette Grief – Laid down 1 April 1945; requires 1,000 tons, 0 tons previously consumed; receives 270 tons, 730 tons remaining
Floating Dock Nr.1 – Type 1.0 – Idle
Small Craft Construction Programme
None
Refits and Conversion Programme
Refit of Battleship Hindenburg – Refit commenced 1 April 1945; requires 1,998 tons, 0 tons previously consumed; receives 1,998 tons, 0 tons remaining; Refit complete 14 June 1945 and commenced post-refit trials
Refit of Battleship Mackensen – Refit commenced 1 April 1945; requires 1,998 tons, 0 tons previously consumed; receives 1,998 tons, 0 tons remaining; Refit complete 14 June 1945 and commenced post-refit trials
Conversion of Fleet Oiler Oderland – Conversion commenced 1 January 1945; requires 1,548 tons, 774 tons previously consumed; receives 774 tons, 0 tons remaining; Conversion complete 25 April 1945 and commenced post-refit trials
Conversion of Fleet Tender Curt von François – Conversion commenced 1 January 1945; requires 1,715 tons, 858 tons previously consumed; receives 857 tons, 0 tons remaining; Conversion complete 1 May 1945 and commenced post-refit trials
D. Transactions
Second payment of 1,800 tons from Turkey for six schwere zerstörer of the Lebrecht Maas class
E. Other Notes
Ships Laid Down This Quarter
At Flensburg – Corvette Bussard, Corvette Grief
Ships Launched This Quarter
At Bremerhaven – Destroyer Allenstein, Destroyer Hirschberg
At Cuxhaven – Destroyer Gumbinnen, Destroyer Schweidnitz
At Hamburg – Submarine Store, Submarine Tarpune
At Kiel – Submarine Schwertfisch, Submarine Forellen
At Wilhelmshaven – Submarine Haifisch, Submarine Speerfisch
At Memel – Corvette Albatros, Corvette Mowe
Ships Completed This Quarter
At Bremerhaven – Aircraft Carrier Großer Kurfürst
At Cuxhaven – Aircraft Carrier Friedrich der Große, Frigate Rangersdorf
At Hamburg – Minesweeper Hallstättersee, Minesweeper Wörthersee
At Kiel – Frigate Gromitz, Frigate Großpetersdorf, Frigate Sulzbach
Refits/Conversions Completed This Quarter
Battleship Hindenburg
Battleship Mackensen
Fleet Oiler Oderland
Fleet Tender Curt von François
Ships Undergoing Trials This Quarter
(First three-months)
Aircraft Carrier Großer Kurfürst
Aircraft Carrier Friedrich der Große
Frigate Gromitz
Frigate Rangersdorf
Frigate Großpetersdorf
Frigate Sulzbach
Ships Completing Trials This Quarter
Frigate Datteln
Frigate Dillingen
Frigate Frankenthal
Frigate Fürstenfeld
Frigate Graz
Frigate Kapfenberg
Frigate Klagenfurt
Frigate Ravelsbach
Frigate Rottweil
Frigate Saalfelden
Frigate Salzburg
Frigate Werden
Offshore Patrol Vessel Goldener Löwe
Offshore Patrol Vessel Roter Löwe
Corvette Nerz
Corvette Ozelot
Corvette Puma
Corvette Wiesel
Minesweeper Fuschlsee
Minesweeper Wolfgangsee
Battleship Hindenburg (post refit)
Battleship Mackensen (post refit)
Fleet Oiler Oderland (post refit)
Fleet tender Curt von François (post refit)
F. Scrappage Report
Submarine U-31 – demolition complete 10 February 1945; 62 tons available 1Q46
Submarine U-32 – demolition complete 10 February 1945; 62 tons available 1Q46
Submarine U-33 – demolition complete 10 February 1945; 62 tons available 1Q46
Submarine U-34 – demolition complete 10 February 1945; 62 tons available 1Q46
Submarine U-35 – demolition complete 10 February 1945; 62 tons available 1Q46
Submarine U-36 – demolition complete 10 February 1945; 62 tons available 1Q46
Escort Vp27 – demolition complete 8 February 1945; 38 tons available 1Q46
Escort Vp28 – demolition complete 8 February 1945; 38 tons available 1Q46
Escort Vp29 – demolition complete 8 February 1945; 38 tons available 1Q46
Escort Vp30 – demolition complete 8 February 1945; 38 tons available 1Q46
G. Other Disposals
None
Updated Order of Battle
Type : In Service + Trials + Building + Converting + Refitting = Total
Schlachtschiff : 8 + 0 + 0 + 0 + 0 = 8
Schlachtkreuzer : 4 + 0 + 0 + 0 + 0 = 4
Flugzeugträger : 7 + 2 + 4 + 0 + 0 = 13
Schwere Kreuzer : 4 + 0 + 0 + 0 + 0 = 4
Leichte Kreuzer : 16 + 0 + 3 + 0 + 0 = 19
Schwere Zerstörer : 6 + 0 + 0 + 0 + 0 = 6
Zerstörer : 72 + 0 + 4 + 0 + 0 = 76
Mehrzweckfregatten : 12 + 0 + 4 + 0 + 0 = 16
Inspektionsschiffen : 2 + 0 + 0 + 0 + 0 = 2
Geleitkorvetten : 24 + 0 + 4 + 0 + 0 = 28
Underseeboote : 34 + 0 + 6 + 0 + 0 = 40
Leichte Minenschiffe : 12 + 0 + 0 + 0 + 0 = 12
Minensuchboote : 30 + 2 + 0 + 0 + 0 = 32
Minenräumboote : 12 + 0 + 0 + 0 + 0 = 12
Mehrzweckboot : 4 + 0 + 0 + 0 + 0 = 4
Schnelleboote : 50 + 0 + 0 + 0 + 0 = 50
Flusskanonenboote : 2 + 0 + 0 + 0 + 0 = 2
Fluss-Patrouillenboote : 6 + 0 + 0 + 0 + 0 = 6
Schnellboot-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
U-boot-Begleitschiffe : 4 + 0 + 0 + 0 + 0 = 4
Flotten-Begleitschiffe : 5 + 0 + 0 + 0 + 0 = 5
Einsatzgruppenversorgungsschiff : 6 + 0 + 0 + 0 + 0 = 6
Flottentanker : 19 + 0 + 0 + 0 + 0 = 19
Flottenversorgungsschiff : 4 + 0 + 0 + 0 + 0 = 4
Werkstattschiffe : 2 + 0 + 0 + 0 + 0 = 2
Vorratsschiffe : 2 + 0 + 0 + 0 + 0 = 2
Munitionstransportschiff : 2 + 0 + 0 + 0 + 0 = 2
Versorgnungstransportschiff : 2 + 0 + 0 + 0 + 0 = 2
Minentransporter : 1 + 0 + 0 + 0 + 0 = 1
Begleit und Werkstattschiff : 2 + 0 + 0 + 0 + 0 = 2
Reparaturschiff : 2 + 0 + 0 + 0 + 0 = 2
Vermessungsschiff : 2 + 0 + 0 + 0 + 0 = 2
Eisbrecher : 2 + 0 + 0 + 0 + 0 = 2
Tonnenleger : 0 + 0 + 2 + 0 + 0 = 2
Netzleger : 8 + 0 + 0 + 0 + 0 = 8
Hochseeschlepper : 4 + 0 + 0 + 0 + 0 = 4
Bergungsschlepper : 4 + 0 + 0 + 0 + 0 = 4
Hafenschlepper : 4 + 0 + 0 + 0 + 0 = 4
Amphibische Transportschiffe : 10 + 0 + 0 + 0 + 0 = 10
Landungstransportschiff : 8 + 0 + 0 + 0 + 0 = 8
Sturm Landungsboot : 148 + 0 + 0 + 0 + 0 = 148
Pionier Landungsboot : 46 + 0 + 0 + 0 + 0 = 46
Marine Fahrprahm Typ 1941 : 8 + 0 + 0 + 0 + 0 = 8
Hafensucheboote Typ 1941 : 24 + 0 + 0 + 0 + 0 = 24
Pionier Motor Launch Typ 1941 : 20 + 0 + 0 + 0 + 0 = 20
Flieger-schuleschiffe : 1 + 0 + 0 + 0 + 0 = 1
Artillerie-schuleschiffe : 2 + 0 + 0 + 0 + 0 = 2
Segel-schuleschiffe : 2 + 0 + 0 + 0 + 0 = 2
Zielschiffe : 1 + 0 + 0 + 0 + 0 = 1
Hafen-schuleschiffe : 1 + 0 + 0 + 0 + 0 = 1