Note: There had been some minor errors in my Q1 and Q2 reports which are corrected with Q3.
[SIZE=3]SAE Quarterly Reports[/SIZE]
No. 39 – July to September 1930
[SIZE=3]
Transfers: [/SIZE]
383ts received from Nordmark as licence fee
4680ts received from Japan as licence fee
[SIZE=3]
Factories:[/SIZE]
26 factories total can be used.
Fixed factories
4 factory will be fixed to produce infrastructure points for 1930.
Flexible factories
5951ts material transferred from Q2 (incl. material recovered from scrapyard).
13,371ts material necessary to be produced in this quarter (13 factories).
13 factory will produce infrastructure points this quarter.
Infrastructure points used this quarter:
0,0pts put into a new Type 1 Dock in Port Louis for a total of 0,7pts at the end of Q3
1,3pts to expand a Type 2 Slip in Port Elizabeth for a total of 3,8pts at the end of Q3
[SIZE=3]
Ships:[/SIZE]
Minor vessels
Completed Units
48x UJ26-class ASW launch
24x R28-class motor launch
15x Tree-class minesweeper (Type 16)
16x Bush-class minesweeper (Type 21)
6x MS28-class minesweeper
4x Polar-class sloops
16x S-class sloops
16x River-class frigate
8x Pleiades-class light destroyers
6x Planet-class light destroyers
6x Guard-class patrol crafts
On Trials
2x MS28-class minesweeper
-
MS28-7 running trials until July 30
-
MS28-8 running trials until August 30
1x SL29-class sloop
-
Circe running trials until July 30
8x R28-class motor launch
-
R25-R32 running trials until September 30
Ordered Units
6x MS28-class minesweeper (Type 28 - 10 month á 56ts material necessary per unit)
-
MS28-16 laid down in Port Louis on a Type 0 slip in March, completed December 30
-
MS28-15 laid down in Montevideo on a Type 0 slip in February, completed November 30
-
MS28-14 laid down in Montevideo on a Type 0 slip in February, completed November 30
-
MS28-10 laid down in Buenos Aires on a Type 0 slip in February, completed November 30
-
MS28-11 laid down in St. Helena on a Type 1 slip in January, completed October 30
-
MS28-9 laid down in St. Helena on a Type 0 slip in January, completed October 30
2x LD29-class light destroyer (10 month á 58ts material necessary per unit)
-
Pluto laid down in Buenos Aires on a Type 1 slip in January, completed October 30
-
Neptune laid down in Mar del Plata on a Type 1 slip in January, completed October 30
1x SL29-class sloop (11 month á 100ts material necessary per unit)
-
Medusa laid down in Montevideo on a Type 4 slip in March, completed December 30
8x R28-class motor launch (1 month á 92ts material necessary per unit)
-
R33-R40 build in Lüderitz in September
4x UJ30-class ASW launch (1 month á 196ts material necessary per unit)
-
UJ49-UJ52 build in Lüderitz in August
Rebuilds
None
Scrapping
1x SL11-class (4 month total, 2 month in Type 0 dock)
-
Hylaios scrapping in Port Elizabeth starting in December, finished in March – 126ts received from hull for Q3/1930
4x SL14-class (4 month total, 2 month in Type 0 dock)
-
Sentinel scrapping in Durban starting in January, finished in April – 142ts received from hull for Q4/1930
-
Surprise scrapping in Douala starting in March, finished in June – 142ts received from hull for Q4/1930
-
Swan scrapping in Libreville starting in February, finished in May – 142ts received from hull for Q4/1930
-
Swift scrapping in Durban starting in June, finished in September – 142ts received from hull for Q1/1931
Destroyers
Completed Units
12x Cat-class torpedoboat
12x Hound-class torpedoboat (Type 21)
12x Hound-class torpedoboat (Type 26)
12x Nymph-class destroyer (Type 21)
12x Nymph-class destroyer (Type 23)
14x Nymph-class destroyer (Type 27)
6x DL28-class destroyer leader (Type 2
On Trials
2x Nymph-class destroyer (Type 27)
-
Polynoe running trials until July 30
-
Neso running trials until August 30
2x DL28-class destroyer leader
-
Longspear running trials until September 30
-
Scythe running trials until December 30
Ordered Units
8x DD30-class destroyer (11 month á 145ts material necessary per unit)
-
Pontoporeia laid down in Durban in a Type 1 slip in January, completed in November 30
-
Proto laid down in Cape Town in a Type 1 slip in January, completed in November 30
-
Protomedeia laid down in Port Elizabeth in a Type 1 slip in January, completed in November 30
-
Sao laid down in Daressalam in a Type 1 slip in January, completed in November 30
-
Speio laid down in Douala in a Type 1 slip in January, completed in November 30
-
Themisto laid down in Majunga in a Type 1 slip in March, completed in January 31
-
Pronoe laid down in Cape Town in a Type 2 slip in April, completed in February 31
-
Psamathe laid down in Daressalam in a Type 2 slip in April, completed in February 31
Rebuilds
None
Scrapping
None
Class B Cruisers
Completed Units
6x Insect-class torpedoboat
4x Nampula-class light cruiser
6x Port Shepstone-class light cruiser
1x Santa Fe-class light cruiser
4x Yaounde-class light cruiser
4x Libreville-class light cruiser
4x Rosario-class light cruiser
4x Aurora-class light cruiser
4x Arion-class light cruiser
On Trials
1x CL16-class light cruiser
-
Santa Fe running trials until July 30
1x CL29-class light cruiser
-
Douala II running trials until November 30
Ordered Units
3x CL29-class light cruiser (17 month á 458ts material necessary per unit)
-
Pietermaritzburg II laid down in Durban in a Type 2 dock in March, completed in July 30
-
Blantyre II laid down in Port Louis on a Type 2 slip in March, completed in July 31
-
Beira II laid down in Buenos Aires on a Type 2 slip in January, completed in May 31
3x DL30-class destroyer leader (12 month á 218ts material necessary per unit)
-
Fenris laid down in Durban in a Type 3 Dock in January, completed in December 30
-
Kweldulf laid down in Cape Town in a Type 2 Dock in January, completed in December 30
-
Freki laid down in Durban in a Type 2 Dock in July, completed in June 31
Rebuilds
4x CL16-class light cruiser (12 month á 192ts/month material necessary per unit)
-
Pelotas entering a Type 3 dock in Daressalam in September. Leaving the dock in Januar 30, the cruiser will stay in the yard until August 30
-
Rio Grande entering a Type 2 dock in Montevideo in September. Leaving the dock in Januar 30, the cruiser will stay in the yard until August 30
-
Santa Marina entering a Type 2 dock in Daressalam in November. Leaving the dock in March 30, the cruiser will stay in the yard until October 30
-
Santana entering a Type 3 dock in Daressalam in September. Leaving the dock in January 31, the cruiser will stay in the yard until August 31
Scrapping
5x TB18-class (5 month total, 2 month in Type 1 dock)
-
Gadfly scrapping in Montevideo starting in January, finished in May – 296ts received from hull for Q4/1930
-
Mantis scrapping in Buenos Aires starting in February, finished in June – 296ts received from hull for Q4/1930
-
Flea scrapping in Port Elizabeth starting in May, finished in September – 296ts received from hull for Q1/1931
-
Mosquito scrapping in Durban starting in August, finished in December – 296ts received from hull for Q2/1931
-
Dragonfly scrapping in Buenos Aires starting in July, finished in November – 296ts received from hull for Q2/1931
Class A Cruisers
Completed Units
1x Colony-class AC
4x Cape-class (Type 23)
2x Cape-class (Type 26)
On Trials
None
Ordered Units
2x CA29-class heavy cruiser (21 month á 545ts material necessary per unit)
-
Ladon laid down in Montevideo on a Type 3 slip in January, completed in September 30
-
Fafnir laid down in Curban on a Type 3 slip in August, completed in April 31
Refits
None
Scrapping
2x General-class (10 month total, 4 month in Type 4 dock)
-
Van de Loo scrapping in Buenos Aires starting in May, finished in November – 1.623ts received from hull for Q3/1930, guns of first, second and third battery stored
-
Hegendorff scrapping in Montevideo starting in December, finished in November – 1.623ts received from hull for Q4/1930, guns of first, second and third battery stored
Capital Units
Completed Units
2x Hertog-class
4x Koning-class
2x Mauritius-class
2x South Africa-class
2x Mocambique-class
2x Ophion-class
On Trials
None
Ordered Units
None
Rebuilds
None
Scrapping
1x Sao Tome-class (10 month total, 4 month in Type 4 dock)
-
Sao Tome scrapping in Montevideo starting in January, finished in October – 3.095ts received from hull for Q3/1930, guns of first, second and third battery stored
Coastal Defence Units
Completed Units
1x Nagelring-class
1x Tyrfing-class
2x LCDS-class
1x LCDS-2-class
On Trials
None
Ordered Units
1x LCDS-2-class coast defense ship (11 month á 169ts material necessary per unit)
-
Nagelfar laid down in Buenos Aires on a Type 3 slip in September, completed in July 30
1x CDS5-class coast defense ship (17 month á 448ts material necessary per unit)
-
Gungnir laid down in Cape Town on a Type 3 slip in June, completed in October 30
Carriers
Completed Units
1x CV25B-class
1x CV26-class
Ordered Units
2x CV30-class light fleet carrier (23 month á 587ts material necessary per unit)
-
Anvil laid down in Cape Town on a Type 3 slip in January, completed in November 31
-
Gripper laid down in Buenos Aires on a Type 3 slip in August, completed in June 32
On Trials
None
Ordered Units
None
Class A Submarines
Completed Units
12x E-class submarine
16x F-class submarine
4x J-class submarine
Ordered Units
None
Class B Submarines
Completed Units
9x G-class submarine
15x I-class submarine
12x H-class submarine
12x K-class submarine
On Trials
4x K-class submarine
-
K13 running trials until July 30
-
K16 running trials until July 30
-
K14 running trials until August 30
-
K15 running trials until July 30
Ordered Units
None
Scrapping
6x G-class (4 month total, 1 month in Type 0 dock)
-
G3 scrapping in Montevideo starting in January, finished in April – 69ts received from hull for Q4/1930
-
G1 scrapping in Mar del Plata starting in February, finished in June – 69ts received from hull for Q4/1930
-
G4 scrapping in Montevideo starting in May, finished in August – 69ts received from hull for Q1/1931
-
G2 scrapping in Mar del Plata starting in February, finished in June – 69ts received from hull for Q1/1931
-
G5 scrapping in Montevideo starting in September, finished in December – 69ts received from hull for Q2/1931
-
G7 scrapping in St. Helena starting in August, finished in November – 69ts received from hull for Q2/1931
Non-combatants
Completed Units
15x Bay-class tender (several different designs)
4x Mimir-class floatplane carriers
1x Bölthorn-class floatplane carrier
On Trials
1x Bölthorn-class floatplane carrier
-
Egdir running trials until July 30
1x TD29-class tender
-
TD29-1 running trials until July 30
Ordered Units
2x Thjazi-class floatplane carrier (15 month á 354ts material necessary per unit)
-
Thjazi laid down in Durban on a Type 4 slip in July, completed in September 30
-
Ymir laid down in Montevideo on a Type 2 slip in July, completed in September 31
Refit
1x TD Bonny Bay-class tender (3 month á 193ts/month material necessary per unit)
-
Bonny Bay entering a Type 1 dock in Montevideo in September. Leaving the dock in October, the cruiser will stay in the yard until November 30
--------------------------------------------------------------------------------------------------------------
At the end of this quarter the RSAN consists of (units in service only):
48 ASW launches
24 motor launches
37 minesweepers
56 small patrol crafts
80 TB/DDs (does not include 11 TBs with 15cm guns)
37 cruisers category b (include 11 TBs with 15cm guns)
7 cruisers category a
14 capital units
5 costal defence ships
2 fleet carrier
48 submarines category b
32 submarines category a
5 floatplane carriers
15 armed tenders
plus numerous auxiliary vessels of all kind.