Dear visitor, welcome to WesWorld.
If this is your first visit here, please read the Help. It explains in detail how this page works.
To use all features of this page, you should consider registering.
Please use the registration form, to register here or read more information about the registration process.
If you are already registered, please login here.
China Q1/36
Chinese Naval Developments Q1/1936:
A. Industiral Allocation
Stockpile after Q4/1935: 2775tons
7/9 factories (non-fixed) to naval materials: 7000 tons created for Q1/1936
used at Taku:
2746tons
used at Shanghai:
1986tons
used at Zhanjiang:
836tons
used at Kaoshiun:
500tons
used at Taipei:
1200tons
used for small vessels 0tons
used for Transaction 250tons
used for Transaction 1000tons
warmaterial recycling 0tons (first quarter)
warmaterial recycling 0tons (second quarter)
=> 7000tons (manufactured) + 2775tons (stockpiled) + 0tons (recycled) - 1250tons (Transaction) = 8525tons
Stockpile after Q1/1936: 1257tons
B. Infrastructure Development
2 factory (non-fixed) to infrastructure: 0.2 pts produced;
C. Naval Construction
Bohai Shipbuilding at Taku:
Type 2 slip CL PRN Guilin; 5499tons needed; 500tons received
Type 1 slip not in use
Type 1 slip Persian APD-1; 860tons needed; 350tons received; launched
Type 0 slip U-6; 349tons needed; 200tons received; launched
Type 0 slip U-7; 349tons needed; 200tons received; launched
Type 0 slip U-8; 349tons needed; 200tons received; launched
Type 0 slip U-9; 349tons needed; 200tons received; launched
Type 1 drydock not in use
Type 0 drydock not in use
Type 0 drydock not in use
Freefloating / in completation:
DD Z-4; 500tons needed; 500tons received; finished
U-2; 149tons needed; 149tons received; finished
U-3; 149tons needed; 149tons received; finished
U-4; 149tons needed; 149tons received; finished
U-5; 149tons needed; 149tons received; finished
Kiangnan Dock & Engineering Works at Shanghai:
Type 2 slip CL PRN Hong Ming; 5499tons needed; 500tons received
Type 1 slip not in use
Type 0 slip not in use
Type 0 slip not in use
Type 3 drydock upgrading to a Type 3 drydock; 0.7 Pts needed; 0 Pts received
Type 2 drydock upgrading to a Type 2 drydock; 0.7 Pts needed; 0.7 Pts received; finished
Freefloating / in completation:
HSCV PRN Zhuhai: 5000tons needed; 1200tons received
Huangfen 610; 666tons needed; 150tons received
PB Dagu 309; 68tons needed; 68tons received;finished
PB Dagu 310; 68tons needed; 68tons received;finished
Hudong-Zhonghua Shipbuilding at Zhanjiang:
Type 1 slip Persian APD-2; 860tons needed; 350tons received; launched
Type 0 slip not in use
Type 0 slip not in use
Type 1 drydock PRN APD-1; 860tons needed; 350tons received; launched
Freefloating / in completation:
PB Dagu 311; 68tons needed; 68tons received; finished
PB Dagu 312; 68tons needed; 68tons received; finished
Waigaoqiao Shipbuilding at Kaoshiun:
Type 0 drydock: not in use
Type 0 drydock: not in use
Type 1 drydock: not in use
Freefloating / in completation:
DD Z-3; 500tons needed; 500tons received; finished
Quindao Beihai Shipbuilding at Taipei:
Type 0 drydock: not in use
Type 2 drydock: not in use
Type 3 drydock: CV PRN Fuzhou; 10207tons needed; 1200tons received
Freefloating / in completation:
D. Transactions
250tons transfered to Australia for the licence of the "Fuzhou" (4/4)
1000tons transfered to SIAM for the carrier (1/4)
E. Other Notes
received 0.3IPs from India for upgrading Formosas shipyards
received 0.2IPs from Phillippines for upgrading Formosas shipyards
F. Small vessels
G. Shakedown cruises
SSCV Yingkou finish trials Q1/1936
RSRV Yibin finish trials Q1/1936
DD Z-1 finish trials Q1/1936
DD Z-2 finish trials Q1/1936
DD Z-3 begin trials Q1/1936
DD Z-4 begin trials Q1/1936
FR Changsha finish trials Q1/1936
PB Dagu 309 begin trials after Q1/1936
PB Dagu 310 begin trials after Q1/1936
PB Dagu 311 begin trials Q1/1936
PB Dagu 312 begin trials Q1/1936
U-2 begin trials after Q1/1936
U-3 begin trials after Q1/1936
U-4 begin trials after Q1/1936
U-5 begin trials after Q1/1936
##############
hope there is no fault
##############