A. Industrial Allocation
5/23 factories to naval materials: 5,080 metric tons (8,000 tons) created for Q4/1923. 3,590 tons saved from Q3/23, making 8,670 metric tons total
18/23 factories (committed) to infrastructure development: 1.8 points for Q4/1923 plus 1.8 bonus points for a total of 3.6.
0/23 factories (non-committed) to infrastructure development; total 0.0 infrastructure points produced
B. Infrastructure Development
1 new factory with 5.1 points completed by Q3/1923
1.0 points added to second new factory in Q4/1923, ending with 5.1 points completed.
1 new class 0 slip at Saigon with 0.3 pts completed by Q3/23 - 0.2 pts added in Q4/23 to complete.
1 new Class 0 slip at Noumea with 0.3 pts completed by Q3/23 - 0.2 pts added in Q4/23 to complete
2 new Class 0 slips at Marseilles - with 0.3 pts each completed by Q3/23 - 0.2 pts added to each in Q4/23 to complete
1 new Class 3 slip at Marseilles - with 1.8 pts completed by Q3/23 - 1.2 pts added in Q4/23 to complete.
C. Naval Construction
At La Rochelle
Class 4 Slip #1 - Idle
Class 4 Slip #2 - Idle
Class 3 Slip #1 - Idle
Class 3 Slip #2 - Idle
Class 3 Slip #3 - Idle
Class 3 Slip #4 - Idle
Class 2 Slip #1 - Idle
Class 2 Slip #2 - Idle
Class 1 Slip #1 - Idle
Class 1 Slip #2 - Idle
Class 1 Slip #3 - Idle
Class 1 Slip #4 - Idle
Class 0 Slip #1 - Idle
Class 0 Slip #2 - Idle
Class 0 Slip #3 - Idle
Class 0 Slip #4 - Idle
At Brest
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Ceyenne
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Abidjan
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Marseilles
Class 3 Drydock #1 - Idle
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Oran
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
At Beiruit
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Crozet Island
Class 2 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
At Saigon
Class 3 Drydock #1 - Idle
Class 1 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Idle
At New Caledonia
Class 2 Drydock #1 - Idle
Class 0 Drydock #1 - Idle
Class 0 Slip #1 - Idle
Launched ships being completed:
Clemenceau class Aircraft Carrier laid down 1/1/23. 8,250 tons completed by Q3/23. 3,000 tons added in Q4/23. Launched 8 October 1923
Noumea class minesweeper #6 laid down 4/9/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.
Noumea class minesweeper #7 laid down 4/9/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.
Noumea class minesweeper #8 laid down 4/10/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.
Noumea class minesweeper #9 laid down 4/10/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.
Noumea class minesweeper #10 laid down 4/9/23. 400 tons completed by Q3/23. 83 tons added in Q4/23 to complete.
D. Transactions
None. 5,080 metric tons warship materials saved.
E. Other Notes
10 Seine class Corvettes and 10 Noumea class minesweeper completed in Q4/23
F. Updated Order of Battle, 1 January 1924
Note:
Y)+Z = completed (under repair/refit) + under construction
BB: 5(0)+0
BC: 0(0)+0
CV:2(0)+1
CA: 6(0)+0
CL: 8(0)+0
Monitors: 0(0)+0
DD: 78(0)+0
Sloops: 0(0)+0
Fleet Submarine: 15(0)+0
Coastal Submarine: 60(0)+0