Formosa’s Naval Developments – Q1/1929
A. Industrial Allocation
1/4 factories producing warship material = 1,000 t. 0 tons stockpiled materials available. 1000 t are used, 0 tons materials stockpiled.
3/4 factories are dedicated to producing infrastructure material, = 0.3 pts.
B. Infrastructure Development
F1 at Agana (Guam), receives 0.3 points. Total 2.6
C. Naval Construction
Kaoshiun
D0: idle
D0: idle
D1: idle
Free-floating: F-D-8 receives 167 tons.
Tahei
D0: idle
D1: idle
D2: Naoe Nagi laid down 1/1/1929. Receives 666 tons.
Free-floating: F-D-9 receives 167 tons.
D. Transactions
BC T’ai-pei transferred from Japan to Royal Chosen Navy.
E. Other Notes
F-D-8 and F-D-9 starting shakedown cruise.
New units laid down this quarter:
Light cruiser Naoe Nagi of the WSS class require 3629 tons and 13 months. (for design see report Japan)
F. Updated Order of Battle, 3/31/29
Note:
Y)+Z = completed (under repair/refit) + under construction
Battle Cruiser: 1(0)+0
Carrier: 1(0)+0
Heavy Cruiser: 1(0)+0
Armored Cruiser: 2(0)+0
1st class Cruiser: 1(0)+0
Light Cruiser: 2(0)+1
2nd class Cruiser: 1(0)+0
Protected Cruiser: 3(0)+0
Gunboats: 2(0)+0
River gunboat: 1(0)+0
Destroyers 2nd class: 9(0)+2
Destroyers 3rd class: 3(0)+0
TPB 1st class: 5(0)+0
TPB 2nd class: 7(0)+0