You are not logged in.

Dear visitor, welcome to WesWorld. If this is your first visit here, please read the Help. It explains in detail how this page works. To use all features of this page, you should consider registering. Please use the registration form, to register here or read more information about the registration process. If you are already registered, please login here.

1

Friday, January 21st 2005, 10:14pm

Denmark, Quarter 2, 1925

Danish Naval Developments Q2 1925

a/ Industrial Allocation
5/10 factories producing materiel for shipbuilding =5000 tons
4/10 factories (fixed) producing infrastructure materiel =0.4 points
1/10 factories producing infrastructure materiel = 0.1 points

b/ Infrastructure Development
Factory no. 11 continuing construction, receives 0.5 points = Total 2.2 points

c/ Naval Construction
Copenhagen-
No.1 type 3 slip – Freya, CA, laid down 02/01/24, receives 1768 tons, balance 2297 tons
No.2 type 2 slip – Lolland, CL, laid down 02/04/24, receives 1334 tons, balance 534 tons
No.3 type 1 slip – Idle
No.4 type 1 slip - Idle
No.1 type 2 drydock - Idle
Dock side –


Aarhus-
No.1 type 3 slip –Idle
No.2 type 2 slip –Idle
No.3 type 1 slip – UD 1, Sub, laid down 02/04/24, receives 24 tons to complete
No.4 type 1 slip – UD 2, Sub, laid down 02/04/24, receives 24 tons to complete
No.1 type 3 drydock – Tegetthoff
No.2 type 2 drydock – Idle
Dock side –

Aalborg-
No.1 type 1 slip – Idle
No.2 type 1 slip – Idle
No.3 type 0 slip - Idle
No.4 type 0 slip - Idle
Dock side –

Bangkok-
No.1 type 1 slip – Idle
No.2 type 0 slip – Idle
No.3 type 0 slip – Idle
No.1 type 2 drydock –Idle
Dock side –


d/ Transactions
None

e/ Other Notes
All new orders CANCELLED, current projects allowed to complete.

KDM Hel commissions 18/04/25
KDM Ask commissions 24/04/25
KDM Asp commissions 24/04/25
KDM Bog commissions 24/04/25
KDM Puma commissions 23/05/25
KDM UD-1 commences sea trials 05/04/25
KDM UD-2 commences sea trials 05/04/25


Repairs to the following ships:-
Bornholm – Re-enters service 10/04/25

Re-Fits to the following ships:-
D15 – 489 tons, starts re-fit 01/04/25, completes re-fit 22/06/25
Tegetthoff – 1334 tons, starts re-fit 01/04/25, completes re-fit 30/07/25

Re-Builds to the following ships:-
Jutland – 1297 tons, starts re-build 01/04/25

Tonnage Carried Over From This Quarter = 683

f/ Order of Battle
Note: X(Y)+Z = completed (under repair/refit) + building/on order (breaking)

BB = 00 (1) + 0/0 (0)
PD = 00 (0) + 0/0 (0)
AC = 02 (0) + 0/0 (0)
CDS = 03 (0) + 0/0 (0)
CA = 01 (0) + 1/0 (0)
CL = 08 (1) + 1/0 (0)
CV(X) = 00 (1) + 0/0 (0)
DD = 17 (1) + 0/0 (0)
FR = 00 (0) + 0/0 (0)
SL = 03 (0) + 0/0 (0)
GB = 03 (0) + 0/0 (0)
TB = 19 (0) + 0/0 (0)
STC = 48 (0) + 0/0 (0)
SUB = 11 (0) + 2/0 (0)
MWS = 07 (0) + 0/0 (0)
AMC = 01 (0) + 0/0 (0)

Note: PD = Pre-Dreadnought
FR = Frigate
SL = Sloop
GB = Gun Boat
STC = Small Torpedo Craft
MWS = Mine Warfare Ship
AMC = Armed Merchantman (aka LOKI)