[SIZE=5]Q2 1944[/size]
[size=3]Industrial Allocation[/size]
- 10/15 Factories producing 10,000t materials
- 0/15 Factories producing infrastructure (non-dedicated)
- 5/15 Factories producing infrastructure (dedicated)
- 805t from Stockpile
- 1,500t in from Transactions
- 0t out in Transactions
- 0t in from Scrap
- 12,305t Total materials available
- 9,668t used
- 2,637t stored for Q3/1944
[size=3]Infrastructure Development[/size]
Thessaloniki:
- 0.5 IP added to construct Type 2 Drydock at Thessaloniki. 1.5 installed, 1.5 IP remaining.
[SIZE=3]Naval Construction[/SIZE]
Attica:
D3: - C-4 Helle begins Partial Reconstruction on January 2nd, 1944. 6,407 tons required; 1602 / 6407 added Q2/44 for a total 3204 / 6407. 3,203 tons remaining.
D3: - C-5 Kriti begins Partial Reconstruction on January 2nd, 1944. 6,407 tons required; 1602 / 6407 added Q2/44 for a total 3204 / 6407. 3,203 tons remaining.
D2: - MS-27 Euxanthios and MS-28 Lycos laid down end-to-end on April 4th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
S2: Idle
S2: Idle
S2: Idle
S1: - Fleet Support Tanker Borysthenis laid down January 4th, 1944. 1,950 tons required; 487.5 / 1950 added Q2/44 for a total 975 / 1950. 975 tons remaining.
S0: - Fleet Tug T4206 laid down January 5th, 1944. 685 tons required; 170 / 685 added in Q2/44 for a total of 340 / 685. 345 tons remaining.
S0: - MS-29 Lysagora laid down April 2nd, 1944. 550 tons required; 165 / 550 added in Q2/44 for a total of 165 / 550. 385 tons remaining.
Dockside:
- AC-9 Thermopylae begins Major Refit on July 2nd, 1943. 7,120 tons required; 1995 / 7120 added Q2/44 for a total 7120 / 7120. 0 tons remaining. Ship re-launched January 13th, 1944. Completes May 5th, 1944. Begins Post-Refit trials May 8th, 1944. Completes trials November 10th, 1944.
Paros:
D1: Idle
D0: - MS-30 Makelo laid down April 2nd, 1944. 550 tons required; 165 / 550 added in Q2/44 for a total of 165 / 550. 385 tons remaining.
Dockside:
Patra:
D1: Idle
S1: - Fleet Support Tanker Hypate laid down January 3rd, 1944. 1,950 tons required; 487.5 / 1950 added Q2/44 for a total 975 / 1950. 975 tons remaining.
D0: Idle
Dockside:
Salamis:
D1: Idle
Dockside:
Souda Bay:
D4: Idle
D3: Idle
S2: Idle
D2: - MS-25 Damnameneus and MS-26 Dexithea laid down end-to-end on April 14th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
D1.5: - MS-19 Actaeus and MS-20 Argyron laid down end-to-end on April 8th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
D1.5: - MS-21 Atabyrius and MS-22 Chalcon laid down end-to-end on April 10th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
D1.5: - MS-23 Chryson and MS-24 Demonax laid down end-to-end on April 12th, 1944. 550 tons required each, 1,100 tons toal; 330 / 1100 added in Q2/44 for a total of 330 / 1100. 770 tons remaining.
Dockside:
Thessaloniki:
D2: - Under construction. Began October 1st, 1943. 3.0 IP required; 0.5 / 3.0 added in Q2/44 for a total of 1.5 / 3.0. 1.5 IP remaining.
D0: Idle
S0: - Fleet Tug T4204 laid down January 5th, 1944. 685 tons required; 172 / 685 added in Q2/44 for a total of 344 / 685. 341 tons remaining.
S0: - Fleet Tug T4205 laid down January 5th, 1944. 685 tons required; 172 / 685 added in Q2/44 for a total of 344 / 685. 341 tons remaining.
Dockside:
Volos:
D1: Idle
Dockside:
Limassol:
D3: Idle
D1: Idle
Dockside:
From factories:
- CML-26 ML200 class 200t Coastal Minelayer
- CML-27 ML200 class 200t Coastal Minelayer
- CML-28 ML200 class 200t Coastal Minelayer
- CML-29 ML200 class 200t Coastal Minelayer
- CML-30 ML200 class 200t Coastal Minelayer
On Trials:
- C-40 Artemis Begins trials October 10th, 1943. Completes trials April 14th, 1944.
- C-43 Hephaestus Begins trials January 10th, 1944. Completes trials July 10th, 1944.
- C-44 Dionysis Begins trials January 10th, 1944. Completes trials July 10th, 1944.
- C-45 Hera Begins trials January 10th, 1944. Completes trials July 10th, 1944.
- C-41 Geryon ex-Chapra Begins trials March 20th, 1944. Completes trials September 23rd, 1944.
- C-42 Typhon ex-Chiplun Begins trials March 20th, 1944. Completes trials September 23rd, 1944.
[size=3]Transactions[/size]
- Received 1,500t from Mexico towards the purchase of 4 Leon class Destroyer Leaders and 7 Kolokotronis class Destroyers. Payment 3 of 3.
[size=3]Other Notes[/size]
[size=3]Order of Battle (Greek Navy) Q1 1943[/size]
Note: W(X)+Y(Z) = completed (under repair/refit) + under construction (- scrapping vessel)
Fleet Combatants
Battleships 5(0)+0
Heavy Cruisers 4(2)+0
Medium Cruisers 2(0)+0
Light Cruisers 19(0)+0
Aircraft Carriers 1(1)+0
Flotilla Leaders 4(0)+0
Class "A" Destroyers 45(0)+0
Class "B" Destroyers 0(0)+0
Class "A" Submarines (>450t Standard) 17(0)+0
Class "B" Submarines (<450t Standard) 2(0)+0
Fast Minelayers 10(0)+0
Fleet Minesweepers 12(0)+12
Small Combatants
Subchasers (150t) 56(0)+0
Coastal Minesweepers (165t) 56(0)+0
Coastal Minelayers (200t) 25(0)+5
Harbour Launches (65t) 21(0)+0
MTB 96(0)+0
MGB 27(0)+0
MMS 22(0)+0
Auxiliaries
Special transports 5(0)+0
Large Landing Craft (200t) 52(0)+0
Small Landing Craft (65t) 16(0)+0
Tenders 4(0)+0
Fleet Train 8(0)+2
Fleet Tugs 3(0)+3
Harbour Tugs 0(0)+0
Training Squadron
Large Sail Training 1(0)+0
Small Sail Training 2(0)+0
Training Carrier 1(0)+0
Training Submarines 2(0)+0
Training Minesweepers 2(0)+0
This post has been edited 1 times, last edit by "Sachmle" (Aug 18th 2013, 5:26am)