Netherlands Q4/27
9/14 factories producing naval materials: 9,000 tons created for Q4/1927 . 9000 total tons+48 stockpiled from previous quarter+414 tons from scrapping= 9462 tons
9400 tons used. 62 tons left for Q1/28
414 tons from scraping, available Q1/28
3/14 factories to infrastructure development: 0.3 points for Q4/27
2/14 factories to infrastructure development (commited): 0,2 points for Q4/27 + 0,2 for commited works= 0,4
B. Infrastructure Development
1 new factory (#15).
0.7 points added to factory #15 in Q4/1927. Current status:9.4 points.
C. Naval Construction
Den Helder:
Class 4 Slip:- Empty
Class 3 dry-dock : - Empty
Amsterdam:
Class 3 Slip :- Empty
Class 2 Slip :- Empty
Class 1 Slip :- Empty
The Hague
Class 3 Slip :- Empty
Class 2 Slip :- Empty
Class 1 Slip :- Empty
Class 3 Dry-dock:- Empty
Class 1 Dry-dock:- Empty
Hoorn:
Class 4 Slip :- Empty
Class 2 Dry-dock:- Empty
Vlissingen:
Class 3 Slip :- Empty
Class 2 Slip :- Empty
Class 1 Slip :- Empty.
IJmuiden:
Class 2 Slip :- Empty
Class 2 Dry-dock:- Empty
Oost-Vlieland:
Class 3 Slip :- Empty
Class 2 Slip :- Empty
Langedijk:
Class 2 Slip :- Empty
Class 2 Dry-dock:- Empty
AT THE EAST INDIES:
Surabaia:
Class 3 Dry-dock:- empty
Balikpapan:
Class 2 Dry-dock:- Empty
Class 1 Dry-dock:- empty
Medan:
Class 2 Dry-dock:- empty
Class 1 Dry-dock:- empty
Launched ships being completed:
Den Helder:
"Utretch" class BB. needs 12000 tons to be completed. 2000 tons added Q4/27. 10000 tons left (Q4/2
Hoorn:
"Oceaan", Utretch class BB. needs 12000 tons to be completed. 2000 tons added Q4/27. 10000 tons left (Q4/2
Amsterdam:
"Breda",Breda class CL. 4043 tons needed. 1350 tons added Q4/27. 2693 tons until ship complete. Expected to be completed in Q2/28.
The Hague:
"Arnhem",Breda class CL. 4043 tons needed. 1350 tons added Q4/27. 2693 tons until ship complete. Expected to be completed in Q2/28.
Vlissingen:
"Aachen",Breda class CL. 4043 tons needed. 1350 tons added Q4/27. 2693 tons until ship complete. Expected to be completed in Q2/28.
IJmuiden:
"Maastrich",Breda class CL. 4043 tons needed. 1350 tons added Q4/27. 2693 tons until ship complete. Expected to be completed in Q2/28.
C. Ships on shakedown cruises:
None
D. Transactions
None.
E. Other Notes
None
F. Updated Order of Battle-
Note:
Y)+Z = completed/in service (under repair/refit/rebuild) + under construction.
CV: 1(0)0
BB: 2(0)2
BC: 4(0)0
PD: 2(0)0
CDS:3(0)0
CA: 4(0)0
CL: 20(0)4
DD: 48(0)0
FF: 45(0)0
Fleet Submarine: 16(0)0